Data analysis results of DauThau.info software for project owners PetroVietNam Long Phu 1 Power Project Management Board as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 89 contractors.
- Announced 3 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 38 contractor selection plans with a total of 57 bidding packages, of which 6 prequalification documents have not found the investment project
- Has invited bids for 37 packages (with 53 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 35 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 9 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 23 packages that have not fully posted the contractor selection results. Of these 14 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 4.06 contractors.
- Breakdown by bidding field: Goods 3.77%, Construction 13.21%, Consultancy 13.21%, Non-consultancy 33.96%, Mixed 35.85%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,979,243,128,983 VND, of which the total winning bid value is: 4,918,658,218,414 VND.
- The savings rate is: 17.74%.
Data analysis results of DauThau.info software for project owners PetroVietNam Long Phu 1 Power Project Management Board as follows:
- Has relationships with 89 contractors.
- The average number of contractors participating in each bidding package is: 4.06 contractors.
- Proportion of bidding fields: Goods 3.77%, Construction 13.21%, Consulting 13.21%, Non-consulting 33.96%, Mixed 35.85%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,979,243,128,983 VND, in which the total winning value is: 4,918,658,218,414 VND.
- The savings rate is: 17.74%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the request Adjust and supplement the contractor selection plan of Long Phu Thermal Power Plant Project 1 of the investor PetroVietNam Long Phu 1 Power Project Management Board with 37 bidding package.
06/01/2026 09:55
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the results of the bidding package Supply equipment, construction, installation, monitoring and coordination during the testing process of cooling water systems (receiving doors & pumping stations, pumping stations, discharge channels and exhaust doors) of the investor PetroVietNam Long Phu 1 Power Project Management Board.
31/12/2025 10:57
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the results of the bidding package Car NMPTAKE 1 (Deployment period) Insurance) of the investor PetroVietNam Long Phu 1 Power Project Management Board.
- Winning bidder: Vietinbank Insurance
30/12/2025 14:48
Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted Tender Notice Supply, install steel structure, coal cover and dust wall of the investor PetroVietNam Long Phu 1 Power Project Management Board with the form Open bidding.
11/12/2025 13:55
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the results of the bidding package Supply equipment, supervision, monitoring and coordinating during the testing process of the boiler blowing system of the investor PetroVietNam Long Phu 1 Power Project Management Board.
- Winning bidder: Clyde Bergemann GmbH
10/12/2025 10:07
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the request Adjust and supplement the contractor selection plan of Long Phu Thermal Power Plant Project 1 of the investor PetroVietNam Long Phu 1 Power Project Management Board with 37 bidding package.
05/12/2025 11:16
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the results of the bidding package Environmental monitoring consultancy in the construction phase (the re -deployment phase) of the investor PetroVietNam Long Phu 1 Power Project Management Board.
- Winning bidder: NAVITEK FOOD AND ENVIRONMENTAL TESTING JOINT STOCK COMPANY
02/12/2025 13:44
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the results of the bidding package Supply equipment, monitoring, installation, monitoring and coordination during the testing process of electrostatic dust filtration system (ESP) and sulfur degeneration system (FGD) of the investor PetroVietNam Long Phu 1 Power Project Management Board.
- Winning bidder: KC Cottrell
25/11/2025 12:45
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the request Adjust and supplement the contractor selection plan of Long Phu Thermal Power Plant Project 1 of the investor PetroVietNam Long Phu 1 Power Project Management Board with 37 bidding package.
25/11/2025 10:04
Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted Tender Notice Provide the rest of the VTTB to complete the instant of the boiler of the investor PetroVietNam Long Phu 1 Power Project Management Board with the form Open bidding.
21/11/2025 16:08
The data sheet has been partially hidden, to see the full information please Login or Register
PetroVietNam Long Phu 1 Power Project Management Board announced the results of the bid package Perfect design, supervision of installation and testing, boiler alignment .
- Winning bidder: CHEMICAL INDUSTRY ENGINEERING JOINT STOCK COMPANY, LIMITED LIABILITY COMPANY SPECIAL DESIGN BUREAU OF BOILER UNITS
21/11/2025 14:26
PetroVietNam Long Phu 1 Power Project Management Board publishes the plan Adjust and supplement the contractor selection plan of Long Phu Thermal Power Plant Project 1 with 36 bidding package .
15/10/2025 13:51
PetroVietNam Long Phu 1 Power Project Management Board announced the results of the bid package Car NMPTAKE 1 (Deployment period) Insurance) .
- Winning bidder:
26/08/2025 19:55
PetroVietNam Long Phu 1 Power Project Management Board announced the results of the bid package Construction of auxiliary items: Administration, Canteen, Warehouse, Workshop, Car/Motorcycle House .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ VÀ XÂY DỰNG NTV THÀNH PHÁT
15/08/2025 16:29
PetroVietNam Long Phu 1 Power Project Management Board announced the results of the bid package Supply, construction, testing fire system (FPC) The whole factory .
- Winning bidder: BCA THANGLONG ONE MEMBER COMPANY LIMITED
29/07/2025 11:29
PetroVietNam Long Phu 1 Power Project Management Board publishes the plan Adjust and supplement the contractor selection plan of Long Phu Thermal Power Plant Project 1 with 38 bidding package .
26/07/2025 09:48
PetroVietNam Long Phu 1 Power Project Management Board announced the results of the bidding package Car NMPTAKE 1 (Deployment period) Insurance) with 4 participating contractors .
24/07/2025 09:02
PetroVietNam Long Phu 1 Power Project Management Board announced the results of the bid package Supply, construction of chimneys .
- Winning bidder: CRI ENERBILITY S.R.L.
23/07/2025 15:59
PetroVietNam Long Phu 1 Power Project Management Board announced the results of the bidding package Perfect design, supervision of installation and testing, boiler alignment with 1 participating contractors .
18/07/2025 15:49
PetroVietNam Long Phu 1 Power Project Management Board publishes the plan Adjust and supplement the contractor selection plan of Long Phu Thermal Power Plant Project 1 with 38 bidding package .
14/07/2025 16:11
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the request Adjust and supplement the contractor selection plan of Long Phu Thermal Power Plant Project 1 of the investor PetroVietNam Long Phu 1 Power Project Management Board with 37 bidding package.
06/01/2026 09:55
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the results of the bidding package Supply equipment, construction, installation, monitoring and coordination during the testing process of cooling water systems (receiving doors & pumping stations, pumping stations, discharge channels and exhaust doors) of the investor PetroVietNam Long Phu 1 Power Project Management Board.
31/12/2025 10:57
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the results of the bidding package Car NMPTAKE 1 (Deployment period) Insurance) of the investor PetroVietNam Long Phu 1 Power Project Management Board.
- Winning bidder: Vietinbank Insurance
30/12/2025 14:48
Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted Tender Notice Supply, install steel structure, coal cover and dust wall of the investor PetroVietNam Long Phu 1 Power Project Management Board with the form Open bidding.
11/12/2025 13:55
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the results of the bidding package Supply equipment, supervision, monitoring and coordinating during the testing process of the boiler blowing system of the investor PetroVietNam Long Phu 1 Power Project Management Board.
- Winning bidder: Clyde Bergemann GmbH
10/12/2025 10:07
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the request Adjust and supplement the contractor selection plan of Long Phu Thermal Power Plant Project 1 of the investor PetroVietNam Long Phu 1 Power Project Management Board with 37 bidding package.
05/12/2025 11:16
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the results of the bidding package Environmental monitoring consultancy in the construction phase (the re -deployment phase) of the investor PetroVietNam Long Phu 1 Power Project Management Board.
- Winning bidder: NAVITEK FOOD AND ENVIRONMENTAL TESTING JOINT STOCK COMPANY
02/12/2025 13:44
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the results of the bidding package Supply equipment, monitoring, installation, monitoring and coordination during the testing process of electrostatic dust filtration system (ESP) and sulfur degeneration system (FGD) of the investor PetroVietNam Long Phu 1 Power Project Management Board.
- Winning bidder: KC Cottrell
25/11/2025 12:45
The Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted the request Adjust and supplement the contractor selection plan of Long Phu Thermal Power Plant Project 1 of the investor PetroVietNam Long Phu 1 Power Project Management Board with 37 bidding package.
25/11/2025 10:04
Bid solicitor PetroVietNam Long Phu 1 Power Project Management Board has posted Tender Notice Provide the rest of the VTTB to complete the instant of the boiler of the investor PetroVietNam Long Phu 1 Power Project Management Board with the form Open bidding.
21/11/2025 16:08
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PetroVietNam Long Phu 1 Power Project Management Board is the investor of 3 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor PetroVietNam Long Phu 1 Power Project Management Board is the owner of 38 contractor selection plan. In which, they self-invite 25 of contractor selection plan, other units invite bids of 13 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor PetroVietNam Long Phu 1 Power Project Management Board is the investor of 53 package, of which 25 package is self-invited, other units invite bid 28 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PetroVietNam Long Phu 1 Power Project Management Board is the owner of 35 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: The investor PetroVietNam Long Phu 1 Power Project Management Board has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PetroVietNam Long Phu 1 Power Project Management Board is an investor with 89 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!