Data analysis results of DauThau.info software for project owners Project Management board as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 66 contractors.
- Announced 1 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 3 contractor selection plans with a total of 7 bidding packages, of which 3 prequalification documents have not found the investment project
- Has invited bids for 83 packages (with 87 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 226 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 143 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 2.30%, Construction 29.89%, Consultancy 55.17%, Non-consultancy 8.05%, Mixed 4.60%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 795,147,434,382 VND, of which the total winning bid value is: 745,683,736,449 VND.
- The savings rate is: 6.22%.
Data analysis results of DauThau.info software for project owners Project Management board as follows:
- Has relationships with 66 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 2.30%, Construction 29.89%, Consulting 55.17%, Non-consulting 8.05%, Mixed 4.60%, Other 0%.
- The total value according to the bidding package with valid IMP is: 795,147,434,382 VND, in which the total winning value is: 745,683,736,449 VND.
- The savings rate is: 6.22%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Project Management board Posted Development Investment Project 110kV transformer station Thong Nhat Park.
06/05/2018 07:00
The Bid solicitor Project Management board has posted the results of the bidding package Contractor lot 01: Construction and installation in the South Hanoi area. Package 05: Construction and installation of the investor Project Management board.
22/02/2018 13:49
The Bid solicitor Project Management board has posted the results of the bidding package Lot 1: Gia Lam district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:46
The Bid solicitor Project Management board has posted the results of the bidding package Lot 2: Dong Anh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:45
The Bid solicitor Project Management board has posted the results of the bidding package Lot 3: Me Linh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:43
The Bid solicitor Project Management board has posted the results of the bidding package Lot 4: Long Bien district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare feasibility study report. of the investor Project Management board.
22/01/2018 14:41
The Bid solicitor Project Management board has posted the results of the bidding package Package 11: Consultancy and verification of Architectural and Technical Designs, Architectural Design and Construction of the investor Project Management board.
04/12/2017 11:09
The Bid solicitor Project Management board has posted the results of the bidding package Package 11: installation of line deflection protection F87L of the investor Project Management board.
07/11/2017 11:20
The Bid solicitor Project Management board has posted the results of the bidding package Package 9 "Measurement and drawing for site clearance" of the investor Project Management board.
11/10/2017 10:00
The Bid solicitor Project Management board has posted the results of the bidding package Package 7 "Clearing bombs and mines" of the investor Project Management board.
11/10/2017 09:56
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management board announced the results of the bid package Contractor lot 01: Construction and installation in the South Hanoi area. Package 05: Construction and installation .
- Winning bidder: Liên danh xây lắp điện lô thầu 01 - J
22/02/2018 13:49
Project Management board announced the results of the bid package Lot 1: Gia Lam district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report .
- Winning bidder: Công ty cổ phần tư vấn thiết kế xây dựng điện lực.
22/01/2018 14:46
Project Management board announced the results of the bid package Lot 2: Dong Anh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐIỆN PACIFIC, CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN LỰC HÀ NỘI
22/01/2018 14:45
Project Management board announced the results of the bid package Lot 3: Me Linh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report .
- Winning bidder: Công ty cổ phần tư vấn đầu tư thiết kế xây dựng điện và công nghiệp.
22/01/2018 14:43
Project Management board announced the results of the bid package Lot 4: Long Bien district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare feasibility study report. .
- Winning bidder: Công ty cổ phần Tư vấn Xây dựng Điện lực Hà Nội
22/01/2018 14:41
Project Management board announced the results of the bid package Package 11: Consultancy and verification of Architectural and Technical Designs, Architectural Design and Construction .
- Winning bidder: Công ty TNHH Một thành viên Kiến trúc sư Việt Nam
04/12/2017 11:09
Project Management board announced the results of the bid package Package 11: installation of line deflection protection F87L .
- Winning bidder: Hủy thầu
07/11/2017 11:20
Project Management board announced the results of the bid package Package 9 "Measurement and drawing for site clearance" .
- Winning bidder: Công ty cổ phần đầu tư xây dựng và khảo sát đo đạc Hà Nội
11/10/2017 10:00
Project Management board announced the results of the bid package Package 7 "Clearing bombs and mines" .
- Winning bidder: Công ty TNHH Một thành viên Lũng Lô 3
11/10/2017 09:56
Project Management board announced the results of the bid package Package 11 “Preparing Environmental Impact Assessment Report after adjusting substation location” .
- Winning bidder: Công ty cổ phần Xây dựng và Môi trường Vinahenco
11/10/2017 09:50
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management board Posted Development Investment Project 110kV transformer station Thong Nhat Park.
06/05/2018 07:00
The Bid solicitor Project Management board has posted the results of the bidding package Contractor lot 01: Construction and installation in the South Hanoi area. Package 05: Construction and installation of the investor Project Management board.
22/02/2018 13:49
The Bid solicitor Project Management board has posted the results of the bidding package Lot 1: Gia Lam district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:46
The Bid solicitor Project Management board has posted the results of the bidding package Lot 2: Dong Anh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:45
The Bid solicitor Project Management board has posted the results of the bidding package Lot 3: Me Linh district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare Feasibility Study Report of the investor Project Management board.
22/01/2018 14:43
The Bid solicitor Project Management board has posted the results of the bidding package Lot 4: Long Bien district - Package 01: Project survey consultancy; prepare resettlement compensation plan (RP); environmental management plan (EMP); Prepare feasibility study report. of the investor Project Management board.
22/01/2018 14:41
The Bid solicitor Project Management board has posted the results of the bidding package Package 11: Consultancy and verification of Architectural and Technical Designs, Architectural Design and Construction of the investor Project Management board.
04/12/2017 11:09
The Bid solicitor Project Management board has posted the results of the bidding package Package 11: installation of line deflection protection F87L of the investor Project Management board.
07/11/2017 11:20
The Bid solicitor Project Management board has posted the results of the bidding package Package 9 "Measurement and drawing for site clearance" of the investor Project Management board.
11/10/2017 10:00
The Bid solicitor Project Management board has posted the results of the bidding package Package 7 "Clearing bombs and mines" of the investor Project Management board.
11/10/2017 09:56
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management board is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Project Management board is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Project Management board is the investor of 87 package, of which 44 package is self-invited, other units invite bid 43 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management board is the owner of 226 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Project Management board has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management board is an investor with 66 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.