Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners THAC MO HYDROPOWER JOINT STOCK COMPANY as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 619 contractors.
- Announced 9 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 330 contractor selection plans with a total of 627 bidding packages, of which 317 prequalification documents have not found the investment project
- Has invited bids for 571 packages (with 605 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 605 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 114 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 136 packages that have not fully posted the contractor selection results. Of these 109 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.08 contractors.
- Breakdown by bidding field: Goods 51.57%, Construction 16.03%, Consultancy 7.60%, Non-consultancy 24.63%, Mixed 0.17%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,603,715,445,521 VND, of which the total winning bid value is: 1,458,929,936,580 VND.
- The savings rate is: 9.03%.
Data analysis results of DauThau.info software for project owners THAC MO HYDROPOWER JOINT STOCK COMPANY as follows:
- Has relationships with 619 contractors.
- The average number of contractors participating in each bidding package is: 3.08 contractors.
- Proportion of bidding fields: Goods 51.57%, Construction 16.03%, Consulting 7.60%, Non-consulting 24.63%, Mixed 0.17%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,603,715,445,521 VND, in which the total winning value is: 1,458,929,936,580 VND.
- The savings rate is: 9.03%.
You need to Login or Sign up to view all informations.
- Participated in 2 bidding packages, of which 2 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 90.91% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.94% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Undefined (2)
- Provinces before the merger where the contractor has participated in bidding : Undefined (2)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package 2025-TME-CT-03.33 Second dam safety inspection of Thac Mo hydropower plant expansion project of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 2
06/01/2026 09:27
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the request Contractor selection plan for production and business package No. 2025-TMP-CT-03 of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY with 1 bidding package.
06/01/2026 09:17
Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted Tender Notice 2025-TMP-CT-14-36 Hire professional security services in 2026 of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY with the form Open bidding.
29/12/2025 12:28
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package 2025-TMP-CT-15-37 Purchase fire, explosion and business interruption insurance in 2026 for Thac Mo Hydroelectric Plant project of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: Vietinbank Insurance
15/12/2025 20:15
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package 2025-TMP-TB-14.28 replacing the control system and relay protection for Watery Hydroelectricity Office of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: SAI GON BAN MAI COMMERCIAL COMPANY LIMITED
15/12/2025 17:49
Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted Tender Notice 2025-TMP-CT-17-40 Major repair of water intake operator house of Thac Mo Hydropower Plant of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY with the form Open bidding.
09/12/2025 20:30
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package 2025-TMP-TB-10.25 hiring units to dive off garbage and check underground works of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: PANME COMPANY LIMITED
08/12/2025 08:24
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the request Bidding packages for production and business No. 2025-TMP-CT-16 of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY with 1 bidding package.
07/12/2025 20:26
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the request Bidding packages for production and business No. 2025-TMP-CT-17 of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY with 1 bidding package.
07/12/2025 20:18
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package 2025-TMP-CT-15-38 Major repair of drainage ditch system of Thac Mo Solar Power Plant - Areas 1.2, 3 and 6 of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG ĐỨC THỊNH PHÁT
06/12/2025 16:29
The data sheet has been partially hidden, to see the full information please Login or Register
THAC MO HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package 2025-TMP-CT-14-35 Procurement of tables and chairs for the company cafeteria and the cafeteria for operating worker housing .
- Winning bidder: Công ty TNHH Sản xuất và Thương mại CH
17/11/2025 15:49
THAC MO HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package 2025-TMP-CT-03.04 Survey advice, composed records of Calculation of Capacity for Capacity of Waterfall Solar Power Plant Project Phase 02 with a capacity of 100MWP .
- Winning bidder: INSTITUTE OF ENERGY
11/10/2025 16:56
THAC MO HYDROPOWER JOINT STOCK COMPANY publishes the plan Bidding packages for business production No. 2025-TPM-TB-03 with 2 bidding package .
01/10/2025 10:30
THAC MO HYDROPOWER JOINT STOCK COMPANY publishes the plan Bidding package for production and business 2025-TMP-CT-03 with 1 bidding package .
02/08/2025 05:04
THAC MO HYDROPOWER JOINT STOCK COMPANY publishes the plan Bidding packages for business production No. 2024-TPM-TB-10 with 2 bidding package .
01/08/2025 10:35
THAC MO HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package 2025-TMP-TB-04.09 testing system from H1 .
- Winning bidder: S5T VIET NAM SOLUTION AND TECHNOLOGY JOINT STOCK COMPANY
31/07/2025 07:54
THAC MO HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package 2025-TMP-TB-04.08 Supplying SCBD Materials H2 and Equipment of Watery Hydroelectric Plant Project 6 months in the last 6 months of 2025 .
- Winning bidder: TB HYDRO VIET NAM ENGINEERING AND EQUIPMENT COMPANY LIMITED
31/07/2025 07:53
THAC MO HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package 2024-TMP-TB-03.17 major repair system of monitoring water dams .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3
15/07/2025 07:37
THAC MO HYDROPOWER JOINT STOCK COMPANY announced the results of the bidding package 2025-TMP-TB-04.09 testing system from H1 with 4 participating contractors .
14/07/2025 13:11
THAC MO HYDROPOWER JOINT STOCK COMPANY announced the results of the bidding package 2025-TMP-TB-04.08 Supplying SCBD Materials H2 and Equipment of Watery Hydroelectric Plant Project 6 months in the last 6 months of 2025 with 4 participating contractors .
08/07/2025 13:02
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package 2025-TME-CT-03.33 Second dam safety inspection of Thac Mo hydropower plant expansion project of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 2
06/01/2026 09:27
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the request Contractor selection plan for production and business package No. 2025-TMP-CT-03 of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY with 1 bidding package.
06/01/2026 09:17
Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted Tender Notice 2025-TMP-CT-14-36 Hire professional security services in 2026 of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY with the form Open bidding.
29/12/2025 12:28
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package 2025-TMP-CT-15-37 Purchase fire, explosion and business interruption insurance in 2026 for Thac Mo Hydroelectric Plant project of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: Vietinbank Insurance
15/12/2025 20:15
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package 2025-TMP-TB-14.28 replacing the control system and relay protection for Watery Hydroelectricity Office of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: SAI GON BAN MAI COMMERCIAL COMPANY LIMITED
15/12/2025 17:49
Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted Tender Notice 2025-TMP-CT-17-40 Major repair of water intake operator house of Thac Mo Hydropower Plant of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY with the form Open bidding.
09/12/2025 20:30
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package 2025-TMP-TB-10.25 hiring units to dive off garbage and check underground works of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: PANME COMPANY LIMITED
08/12/2025 08:24
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the request Bidding packages for production and business No. 2025-TMP-CT-16 of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY with 1 bidding package.
07/12/2025 20:26
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the request Bidding packages for production and business No. 2025-TMP-CT-17 of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY with 1 bidding package.
07/12/2025 20:18
The Bid solicitor THAC MO HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package 2025-TMP-CT-15-38 Major repair of drainage ditch system of Thac Mo Solar Power Plant - Areas 1.2, 3 and 6 of the investor THAC MO HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG ĐỨC THỊNH PHÁT
06/12/2025 16:29
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THAC MO HYDROPOWER JOINT STOCK COMPANY is the investor of 9 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor THAC MO HYDROPOWER JOINT STOCK COMPANY is the owner of 330 contractor selection plan. In which, they self-invite 292 of contractor selection plan, other units invite bids of 38 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor THAC MO HYDROPOWER JOINT STOCK COMPANY is the investor of 605 package, of which 534 package is self-invited, other units invite bid 71 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THAC MO HYDROPOWER JOINT STOCK COMPANY is the owner of 605 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor THAC MO HYDROPOWER JOINT STOCK COMPANY has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THAC MO HYDROPOWER JOINT STOCK COMPANY is an investor with 619 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.