Data analysis results of DauThau.info software for project owners TRUONG HAI GROUP CORPORATION as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 5 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 6 contractor selection plans with a total of 8 bidding packages, of which 4 prequalification documents have not found the investment project
- Has invited bids for 6 packages (with 6 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 1 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for project owners TRUONG HAI GROUP CORPORATION as follows:
- Has relationships with 5 contractors.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
You need to Login or Sign up to view all informations.
- Participated in 173 bidding packages, of which 127 were won, 5 were lost, 17 are pending results, and 24 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 10% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.36% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (22), Vĩnh Long (19), Lâm Đồng (17), Gia Lai (14), An Giang (9), Đồng Tháp (8), Đà Nẵng (8), Quảng Ngãi (6), Cà Mau (5), Phú Thọ (5), Cần Thơ (5), Đồng Nai (4), Bắc Ninh (4), Quảng Trị (4), Tây Ninh (4), Thanh Hoá (3), Quảng Ninh (2), Sơn La (2), Khánh Hòa (2), Điện Biên (1), Đắk Lắk (1), Undefined (28)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (16), Lâm Đồng (16), Gia Lai (9), An Giang (9), Trà Vinh (8), Tiền Giang (8), Bến Tre (6), Vĩnh Long (5), Quảng Nam (5), Bình Định (5), Quảng Ngãi (5), Đồng Nai (4), Bắc Giang (4), Bà Rịa - Vũng Tàu (4), Cà Mau (3), Đà Nẵng (3), Thanh Hoá (3), Long An (3), Quảng Bình (2), Quảng Ninh (2), Quảng Trị (2), Phú Thọ (2), Sóc Trăng (2), Bạc Liêu (2), Hậu Giang (2), Sơn La (2), Hòa Bình (2), Tây Ninh (1), Kon Tum (1), Điện Biên (1), Đắk Lắk (1), Bình Thuận (1), Cần Thơ (1), Bình Dương (1), Vĩnh Phúc (1), Khánh Hòa (1), Ninh Thuận (1), Undefined (29)
- Has relationships with 127 Bid Solicitors
- Has relationships with 106 Bid Investors
- Has competed against 18 contractors in 23 bidding packages, won 15 packages, lost 4 packages, 3 are pending results, and 1 were canceled.
- Has collaborated with 3 contractors in 3 bidding packages, won 2 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of SUP9 9A steel for testing in 2020 of the investor TRUONG HAI GROUP CORPORATION with the form National shortened competitive bidding.
13/04/2020 10:26
The Bid solicitor TRUONG HAI GROUP CORPORATION has posted the request The contractor selection plan for 01 bidding package of the project of Automating the production of car tweezers towards building a smart factory (Smart Factory) of the investor TRUONG HAI GROUP CORPORATION with 1 bidding package.
02/03/2020 11:18
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of equipment for making test samples on metalloscopes of the investor TRUONG HAI GROUP CORPORATION with the form National Competitive Bidding.
25/10/2019 09:41
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of software for design calculations of the investor TRUONG HAI GROUP CORPORATION with the form National competitive bidding.
03/10/2019 15:04
The Bid solicitor TRUONG HAI GROUP CORPORATION has posted the request Contractor selection plan for 04 bidding packages of the project Automating the production of car tweezers to build a smart factory (Smart Factory), code DM.39.DN/18 under the exchange program new national technology to 2020 of the investor TRUONG HAI GROUP CORPORATION with 4 bidding package.
27/08/2019 11:41
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of software design and mechanical processing of the investor TRUONG HAI GROUP CORPORATION with the form National competitive bidding.
19/06/2019 14:03
The Bid solicitor TRUONG HAI GROUP CORPORATION has posted the request Providing equipment for the project Researching technology and equipment for manufacturing localized details and assemblies of 4-wheel tractors with a capacity of up to 50HP of the investor TRUONG HAI GROUP CORPORATION with 1 bidding package.
14/06/2019 15:38
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of metallographic equipment (Reverse metallurgical microscope) for research of the investor TRUONG HAI GROUP CORPORATION with the form National Competitive Bidding.
19/03/2019 17:17
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of tractor design software and modules of the investor TRUONG HAI GROUP CORPORATION with the form National competitive bidding.
21/02/2019 15:36
The Bid solicitor TRUONG HAI GROUP CORPORATION has posted the request Provide equipment for the project Research and design 4-wheel tractors with capacity up to 50HP with Vietnamese brand of the investor TRUONG HAI GROUP CORPORATION with 1 bidding package.
21/02/2019 15:09
The data sheet has been partially hidden, to see the full information please Login or Register
TRUONG HAI GROUP CORPORATION announced the results of the bidding package Procurement of SUP9 9A steel for testing in 2020 with 1 participating contractors .
24/04/2020 09:42
TRUONG HAI GROUP CORPORATION publishes Tender Notice Procurement of SUP9 9A steel for testing in 2020 in the form National shortened competitive bidding .
13/04/2020 10:26
TRUONG HAI GROUP CORPORATION publishes the plan The contractor selection plan for 01 bidding package of the project of Automating the production of car tweezers towards building a smart factory (Smart Factory) with 1 bidding package .
02/03/2020 11:18
TRUONG HAI GROUP CORPORATION publishes Tender Notice Procurement of equipment for making test samples on metalloscopes in the form National Competitive Bidding .
25/10/2019 09:41
TRUONG HAI GROUP CORPORATION publishes Tender Notice Procurement of software for design calculations in the form National competitive bidding .
03/10/2019 15:04
TRUONG HAI GROUP CORPORATION publishes the plan Contractor selection plan for 04 bidding packages of the project Automating the production of car tweezers to build a smart factory (Smart Factory), code DM.39.DN/18 under the exchange program new national technology to 2020 with 4 bidding package .
27/08/2019 11:41
TRUONG HAI GROUP CORPORATION publishes Tender Notice Procurement of software design and mechanical processing in the form National competitive bidding .
19/06/2019 14:03
TRUONG HAI GROUP CORPORATION publishes the plan Providing equipment for the project Researching technology and equipment for manufacturing localized details and assemblies of 4-wheel tractors with a capacity of up to 50HP with 1 bidding package .
14/06/2019 15:38
TRUONG HAI GROUP CORPORATION publishes Tender Notice Procurement of metallographic equipment (Reverse metallurgical microscope) for research in the form National Competitive Bidding .
19/03/2019 17:17
TRUONG HAI GROUP CORPORATION publishes Tender Notice Procurement of tractor design software and modules in the form National competitive bidding .
21/02/2019 15:36
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of SUP9 9A steel for testing in 2020 of the investor TRUONG HAI GROUP CORPORATION with the form National shortened competitive bidding.
13/04/2020 10:26
The Bid solicitor TRUONG HAI GROUP CORPORATION has posted the request The contractor selection plan for 01 bidding package of the project of Automating the production of car tweezers towards building a smart factory (Smart Factory) of the investor TRUONG HAI GROUP CORPORATION with 1 bidding package.
02/03/2020 11:18
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of equipment for making test samples on metalloscopes of the investor TRUONG HAI GROUP CORPORATION with the form National Competitive Bidding.
25/10/2019 09:41
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of software for design calculations of the investor TRUONG HAI GROUP CORPORATION with the form National competitive bidding.
03/10/2019 15:04
The Bid solicitor TRUONG HAI GROUP CORPORATION has posted the request Contractor selection plan for 04 bidding packages of the project Automating the production of car tweezers to build a smart factory (Smart Factory), code DM.39.DN/18 under the exchange program new national technology to 2020 of the investor TRUONG HAI GROUP CORPORATION with 4 bidding package.
27/08/2019 11:41
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of software design and mechanical processing of the investor TRUONG HAI GROUP CORPORATION with the form National competitive bidding.
19/06/2019 14:03
The Bid solicitor TRUONG HAI GROUP CORPORATION has posted the request Providing equipment for the project Researching technology and equipment for manufacturing localized details and assemblies of 4-wheel tractors with a capacity of up to 50HP of the investor TRUONG HAI GROUP CORPORATION with 1 bidding package.
14/06/2019 15:38
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of metallographic equipment (Reverse metallurgical microscope) for research of the investor TRUONG HAI GROUP CORPORATION with the form National Competitive Bidding.
19/03/2019 17:17
Bid solicitor TRUONG HAI GROUP CORPORATION has posted Tender Notice Procurement of tractor design software and modules of the investor TRUONG HAI GROUP CORPORATION with the form National competitive bidding.
21/02/2019 15:36
The Bid solicitor TRUONG HAI GROUP CORPORATION has posted the request Provide equipment for the project Research and design 4-wheel tractors with capacity up to 50HP with Vietnamese brand of the investor TRUONG HAI GROUP CORPORATION with 1 bidding package.
21/02/2019 15:09
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUONG HAI GROUP CORPORATION is the investor of 0 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor TRUONG HAI GROUP CORPORATION is the owner of 6 contractor selection plan. In which, they self-invite 6 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor TRUONG HAI GROUP CORPORATION is the investor of 6 package, of which 6 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUONG HAI GROUP CORPORATION is the owner of 1 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor TRUONG HAI GROUP CORPORATION has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRUONG HAI GROUP CORPORATION is an investor with 5 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.