Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners THUẾ TỈNH NINH BÌNH as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 38 contractors.
- Announced 5 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 33 contractor selection plans with a total of 79 bidding packages, of which 20 prequalification documents have not found the investment project
- Has invited bids for 9 packages (with 10 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 64 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 56 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 16 packages that have not fully posted the contractor selection results. Of these 15 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 40.00%, Construction 30.00%, Consultancy 30.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 68,425,953,200 VND, of which the total winning bid value is: 67,923,740,451 VND.
- The savings rate is: 0.73%.
Data analysis results of DauThau.info software for project owners THUẾ TỈNH NINH BÌNH as follows:
- Has relationships with 38 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 40.00%, Construction 30.00%, Consulting 30.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 68,425,953,200 VND, in which the total winning value is: 67,923,740,451 VND.
- The savings rate is: 0.73%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor THUẾ TỈNH NINH BÌNH has posted the results of the bidding package Examination of construction drawing designs, construction estimates of the investor THUẾ TỈNH NINH BÌNH.
- Winning bidder: CÔNG TY CP THƯƠNG MẠI VÀ XÂY DỰNG VIỄN DƯƠNG
07/08/2026 15:56
The Bid solicitor THUẾ TỈNH NINH BÌNH has posted the results of the bidding package Drafting a Technical and Economic Report of the investor THUẾ TỈNH NINH BÌNH.
- Winning bidder: CÔNG TY CỔ PHẦN KIẾN TRÚC XÂY DỰNG VÀ THƯƠNG MẠI DŨNG HIỆP
06/08/2026 16:32
The Bid solicitor THUẾ TỈNH NINH BÌNH has posted the request Plan for selecting contractors for several consulting packages during the preparation phase for the renovation of the Tax Office No. 1 in Ninh Binh province. of the investor THUẾ TỈNH NINH BÌNH with 2 bidding package.
06/08/2026 16:27
The Bid solicitor THUẾ TỈNH NINH BÌNH has posted the results of the bidding package Construction insurance of the investor THUẾ TỈNH NINH BÌNH.
- Winning bidder: PVI Insurance
03/08/2026 10:33
The Bid solicitor THUẾ TỈNH NINH BÌNH has posted the results of the bidding package Test compression of reinforced concrete pile of the investor THUẾ TỈNH NINH BÌNH.
- Winning bidder: UNION FOR SOIL INVESTIGATION AND FOUNDATION ENGINEERING
31/07/2026 14:22
The Bid solicitor THUẾ TỈNH NINH BÌNH has posted the results of the bidding package Project management consultancy of the investor THUẾ TỈNH NINH BÌNH.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG HTC
31/07/2026 14:09
The Bid solicitor THUẾ TỈNH NINH BÌNH has posted the results of the bidding package Construction supervision consultancy of the investor THUẾ TỈNH NINH BÌNH.
- Winning bidder: F.D.3.A CONSTRUCTION JOINT STOCK COMPANY
31/07/2026 14:05
Bid solicitor THUẾ TỈNH NINH BÌNH has posted Tender Notice Purchasing assets in 2026 of the investor THUẾ TỈNH NINH BÌNH with the form Competitive Offer.
30/07/2026 14:19
The Bid solicitor THUẾ TỈNH NINH BÌNH has posted the request Investment project to build the headquarters of Duy Tien - Ly Nhan Regional Tax Department (now Tax Base 12, Ninh Binh province) of the investor THUẾ TỈNH NINH BÌNH with 11 bidding package.
30/07/2026 09:59
The Bid solicitor THUẾ TỈNH NINH BÌNH has posted the results of the bidding package Repair of tax office 8, Ninh Binh province of the investor THUẾ TỈNH NINH BÌNH.
- Winning bidder: DUC DAT AN CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
28/07/2026 16:26
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THUẾ TỈNH NINH BÌNH is the investor of 5 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor THUẾ TỈNH NINH BÌNH is the owner of 33 contractor selection plan. In which, they self-invite 0 of contractor selection plan, other units invite bids of 33 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor THUẾ TỈNH NINH BÌNH is the investor of 10 package, of which 0 package is self-invited, other units invite bid 10 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THUẾ TỈNH NINH BÌNH is the owner of 64 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor THUẾ TỈNH NINH BÌNH has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THUẾ TỈNH NINH BÌNH is an investor with 38 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.