Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Trường THCS Lam Cốt as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 3 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 3 contractor selection plans with a total of 5 bidding packages, of which 3 prequalification documents have not found the investment project
- Has invited bids for 0 packages (with 0 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 5 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 216,744,000 VND, of which the total winning bid value is: 211,959,000 VND.
- The savings rate is: 2.21%.
Data analysis results of DauThau.info software for project owners Trường THCS Lam Cốt as follows:
- Has relationships with 3 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 216,744,000 VND, in which the total winning value is: 211,959,000 VND.
- The savings rate is: 2.21%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Trường THCS Lam Cốt has posted the results of the bidding package Construction supervision of the investor Trường THCS Lam Cốt.
- Winning bidder: VANBANG CONSTRUCTION AND INVESTMENT CONSULTING JOINT STOCK COMPANY
18/05/2026 09:28
The Bid solicitor Trường THCS Lam Cốt has posted the results of the bidding package Construction of the investor Trường THCS Lam Cốt.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐẠI LONG
18/05/2026 09:24
The Bid solicitor Trường THCS Lam Cốt has posted the results of the bidding package Consulting on verification of financial protection design and project estimates: Construction of student parking garage at Lam Cot Secondary School
Quang Trung commune of the investor Trường THCS Lam Cốt.
- Winning bidder: VANBANG CONSTRUCTION AND INVESTMENT CONSULTING JOINT STOCK COMPANY
18/05/2026 08:51
The Bid solicitor Trường THCS Lam Cốt has posted the results of the bidding package Consulting on surveying, designing physical facilities and making project estimates: Construction of secondary school student garages
Lam Cot, Quang Trung commune of the investor Trường THCS Lam Cốt.
- Winning bidder: CÔNG TY TNHH TƯ VẤN, ĐẦU TƯ, XÂY DỰNG VÀ TM THỊNH HƯNG
18/05/2026 08:44
The Bid solicitor Trường THCS Lam Cốt has posted the request Plan for selecting contractors for bidding packages in the investment preparation phase of the project: Construction of student garages at Lam Cot Secondary School, Quang Trung commune of the investor Trường THCS Lam Cốt with 2 bidding package.
09/05/2026 10:56
The Bid solicitor Trường THCS Lam Cốt has posted the results of the bidding package Pouring internal concrete roads, clearing campus soil, and installing steel walls around the main gate of Lam Cot Secondary School of the investor Trường THCS Lam Cốt.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐẠI LONG
22/10/2025 11:35
The Bid solicitor Trường THCS Lam Cốt has posted the request Approval of the contractor selection plan for the investment phase Project: Pouring internal concrete roads, clearing campus soil, and installing steel wall coverings at the main gate of Lam Cot Secondary School of the investor Trường THCS Lam Cốt with 1 bidding package.
22/10/2025 11:32
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Trường THCS Lam Cốt is the owner of 3 contractor selection plan. In which, they self-invite 0 of contractor selection plan, other units invite bids of 3 of contractor selection plan.
Summary: Investor Trường THCS Lam Cốt is the owner of 5 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Trường THCS Lam Cốt has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường THCS Lam Cốt is an investor with 3 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.