Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường THCS Lam Cốt as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Trường THCS Lam Cốt as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường THCS Lam Cốt are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 3 contractor selection plans, of which 0 were self-published, and 3 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường THCS Lam Cốt announced the results of the bid package Construction supervision .
- Winning bidder: VANBANG CONSTRUCTION AND INVESTMENT CONSULTING JOINT STOCK COMPANY
18/05/2026 09:28
Trường THCS Lam Cốt announced the results of the bid package Construction .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐẠI LONG
18/05/2026 09:24
Trường THCS Lam Cốt announced the results of the bid package Consulting on verification of financial protection design and project estimates: Construction of student parking garage at Lam Cot Secondary School
Quang Trung commune .
- Winning bidder: VANBANG CONSTRUCTION AND INVESTMENT CONSULTING JOINT STOCK COMPANY
18/05/2026 08:51
Trường THCS Lam Cốt announced the results of the bid package Consulting on surveying, designing physical facilities and making project estimates: Construction of secondary school student garages
Lam Cot, Quang Trung commune .
- Winning bidder: CÔNG TY TNHH TƯ VẤN, ĐẦU TƯ, XÂY DỰNG VÀ TM THỊNH HƯNG
18/05/2026 08:44
Trường THCS Lam Cốt publishes the plan Plan for selecting contractors for bidding packages in the investment preparation phase of the project: Construction of student garages at Lam Cot Secondary School, Quang Trung commune with 2 bidding package .
09/05/2026 10:56
Trường THCS Lam Cốt announced the results of the bid package Pouring internal concrete roads, clearing campus soil, and installing steel walls around the main gate of Lam Cot Secondary School .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐẠI LONG
22/10/2025 11:35
Trường THCS Lam Cốt publishes the plan Approval of the contractor selection plan for the investment phase Project: Pouring internal concrete roads, clearing campus soil, and installing steel wall coverings at the main gate of Lam Cot Secondary School with 1 bidding package .
22/10/2025 11:32
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường THCS Lam Cốt has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường THCS Lam Cốt has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects