Data analysis results of DauThau.info software for project owners UBND phường Ô Chợ Dừa as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 25 contractors.
- Announced 15 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 24 contractor selection plans with a total of 110 bidding packages, of which 12 prequalification documents have not found the investment project
- Has invited bids for 8 packages (with 8 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 44 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 36 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 69 packages that have not fully posted the contractor selection results. Of these 69 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.83 contractors.
- Breakdown by bidding field: Goods 25.00%, Construction 75.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 45,072,522,807 VND, of which the total winning bid value is: 44,605,897,146 VND.
- The savings rate is: 1.04%.
Data analysis results of DauThau.info software for project owners UBND phường Ô Chợ Dừa as follows:
- Has relationships with 25 contractors.
- The average number of contractors participating in each bidding package is: 1.83 contractors.
- Proportion of bidding fields: Goods 25.00%, Construction 75.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 45,072,522,807 VND, in which the total winning value is: 44,605,897,146 VND.
- The savings rate is: 1.04%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Package No. 7: Construction supervision consultancy (adjustment part) of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: HA NOI TRAFFIC INFRASTRUCTURE AND PUBLIC WORKS CONSTRUCTION CONSULTING JOINT STOCK COMPANY
19/06/2025 09:50
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Package 8: Construction of works (adjustment parts) of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: HA NOI INVESTMENT AND CONSULTANTING CIVIL INFRASTRUCTURE CONSTRUCTION JOINT STOCK COMPANY
19/06/2025 09:48
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Bidding package 6: Consulting for evaluation of HSYC, evaluating the results of construction of construction package (adjustment section) of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: HA NOI TRAFFIC INFRASTRUCTURE AND PUBLIC WORKS CONSTRUCTION CONSULTING JOINT STOCK COMPANY
19/06/2025 09:46
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Bidding package 5: Consulting on setting up HSYC, evaluating HSDX Bidding package for construction (adjustment section) of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: Công ty cổ phần đầu tư & thương mại Vintech
19/06/2025 09:43
The Bid solicitor UBND phường Ô Chợ Dừa has posted the request Adjusting the plan to select the work contractor: Improving the urban infrastructure of O Cho Dua ward in 2022 (renovating the road and drainage system lane 113 Hoang Cau; Alley Gieng; 360/4, 350/5 De La Thanh; Lane 64 Nguyen Luong Bang; Mai Anh Tuan Street) of the investor UBND phường Ô Chợ Dừa with 4 bidding package.
19/06/2025 09:38
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Package 3: Consulting on verification of construction drawing design and construction cost estimates of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: 299 CONSTRUCTION AND TRADING SERVICES COMPANY LIMITED
19/06/2025 09:06
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Package 2: Consulting on making economic technical reports of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: HA NOI DEVELOPMENT URBAN INFRASTRUCTURE AND INVESTMENT CONSULTANT CIVIL CONSTRUCTION JOINT STOCK COMPANY
19/06/2025 09:01
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Package 1: Construction survey consultancy of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: HA THANH CONSULTATION SURVEY JOINT STOCK COMPANY
19/06/2025 08:56
The Bid solicitor UBND phường Ô Chợ Dừa has posted the request Improving urban infrastructure in O Cho Dua ward in 2023 (renovating roads and drainage systems lane 16, 26, 95 Hoang Cau street; niche 127/23, 168/1, 168/23 Hao Nam Street; 18 Vo Van Dung lane; lane 16 Nguyen Phuc Lai; Gieng Dong Cac Ngo) of the investor UBND phường Ô Chợ Dừa with 3 bidding package.
19/06/2025 08:51
The data sheet has been partially hidden, to see the full information please Login or Register
UBND phường Ô Chợ Dừa announced the results of the bid package Package No. 7: Construction supervision consultancy (adjustment part) .
- Winning bidder: HA NOI TRAFFIC INFRASTRUCTURE AND PUBLIC WORKS CONSTRUCTION CONSULTING JOINT STOCK COMPANY
19/06/2025 09:50
UBND phường Ô Chợ Dừa announced the results of the bid package Package 8: Construction of works (adjustment parts) .
- Winning bidder: HA NOI INVESTMENT AND CONSULTANTING CIVIL INFRASTRUCTURE CONSTRUCTION JOINT STOCK COMPANY
19/06/2025 09:48
UBND phường Ô Chợ Dừa announced the results of the bid package Bidding package 6: Consulting for evaluation of HSYC, evaluating the results of construction of construction package (adjustment section) .
- Winning bidder: HA NOI TRAFFIC INFRASTRUCTURE AND PUBLIC WORKS CONSTRUCTION CONSULTING JOINT STOCK COMPANY
19/06/2025 09:46
UBND phường Ô Chợ Dừa announced the results of the bid package Bidding package 5: Consulting on setting up HSYC, evaluating HSDX Bidding package for construction (adjustment section) .
- Winning bidder: Công ty cổ phần đầu tư & thương mại Vintech
19/06/2025 09:43
UBND phường Ô Chợ Dừa publishes the plan Adjusting the plan to select the work contractor: Improving the urban infrastructure of O Cho Dua ward in 2022 (renovating the road and drainage system lane 113 Hoang Cau; Alley Gieng; 360/4, 350/5 De La Thanh; Lane 64 Nguyen Luong Bang; Mai Anh Tuan Street) with 4 bidding package .
19/06/2025 09:38
UBND phường Ô Chợ Dừa announced the results of the bid package Package 3: Consulting on verification of construction drawing design and construction cost estimates .
- Winning bidder: 299 CONSTRUCTION AND TRADING SERVICES COMPANY LIMITED
19/06/2025 09:06
UBND phường Ô Chợ Dừa announced the results of the bid package Package 2: Consulting on making economic technical reports .
- Winning bidder: HA NOI DEVELOPMENT URBAN INFRASTRUCTURE AND INVESTMENT CONSULTANT CIVIL CONSTRUCTION JOINT STOCK COMPANY
19/06/2025 09:01
UBND phường Ô Chợ Dừa announced the results of the bid package Package 1: Construction survey consultancy .
- Winning bidder: HA THANH CONSULTATION SURVEY JOINT STOCK COMPANY
19/06/2025 08:56
UBND phường Ô Chợ Dừa publishes the plan Improving urban infrastructure in O Cho Dua ward in 2023 (renovating roads and drainage systems lane 16, 26, 95 Hoang Cau street; niche 127/23, 168/1, 168/23 Hao Nam Street; 18 Vo Van Dung lane; lane 16 Nguyen Phuc Lai; Gieng Dong Cac Ngo) with 3 bidding package .
19/06/2025 08:51
UBND phường Ô Chợ Dừa announced the results of the bid package Bidding package 2: Consulting on making Bidding Documents to evaluate Bidders .
- Winning bidder: HA NOI TRAFFIC INFRASTRUCTURE AND PUBLIC WORKS CONSTRUCTION CONSULTING JOINT STOCK COMPANY
19/06/2025 08:43
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Package No. 7: Construction supervision consultancy (adjustment part) of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: HA NOI TRAFFIC INFRASTRUCTURE AND PUBLIC WORKS CONSTRUCTION CONSULTING JOINT STOCK COMPANY
19/06/2025 09:50
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Package 8: Construction of works (adjustment parts) of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: HA NOI INVESTMENT AND CONSULTANTING CIVIL INFRASTRUCTURE CONSTRUCTION JOINT STOCK COMPANY
19/06/2025 09:48
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Bidding package 6: Consulting for evaluation of HSYC, evaluating the results of construction of construction package (adjustment section) of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: HA NOI TRAFFIC INFRASTRUCTURE AND PUBLIC WORKS CONSTRUCTION CONSULTING JOINT STOCK COMPANY
19/06/2025 09:46
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Bidding package 5: Consulting on setting up HSYC, evaluating HSDX Bidding package for construction (adjustment section) of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: Công ty cổ phần đầu tư & thương mại Vintech
19/06/2025 09:43
The Bid solicitor UBND phường Ô Chợ Dừa has posted the request Adjusting the plan to select the work contractor: Improving the urban infrastructure of O Cho Dua ward in 2022 (renovating the road and drainage system lane 113 Hoang Cau; Alley Gieng; 360/4, 350/5 De La Thanh; Lane 64 Nguyen Luong Bang; Mai Anh Tuan Street) of the investor UBND phường Ô Chợ Dừa with 4 bidding package.
19/06/2025 09:38
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Package 3: Consulting on verification of construction drawing design and construction cost estimates of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: 299 CONSTRUCTION AND TRADING SERVICES COMPANY LIMITED
19/06/2025 09:06
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Package 2: Consulting on making economic technical reports of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: HA NOI DEVELOPMENT URBAN INFRASTRUCTURE AND INVESTMENT CONSULTANT CIVIL CONSTRUCTION JOINT STOCK COMPANY
19/06/2025 09:01
The Bid solicitor UBND phường Ô Chợ Dừa has posted the results of the bidding package Package 1: Construction survey consultancy of the investor UBND phường Ô Chợ Dừa.
- Winning bidder: HA THANH CONSULTATION SURVEY JOINT STOCK COMPANY
19/06/2025 08:56
The Bid solicitor UBND phường Ô Chợ Dừa has posted the request Improving urban infrastructure in O Cho Dua ward in 2023 (renovating roads and drainage systems lane 16, 26, 95 Hoang Cau street; niche 127/23, 168/1, 168/23 Hao Nam Street; 18 Vo Van Dung lane; lane 16 Nguyen Phuc Lai; Gieng Dong Cac Ngo) of the investor UBND phường Ô Chợ Dừa with 3 bidding package.
19/06/2025 08:51
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND phường Ô Chợ Dừa is the investor of 15 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor UBND phường Ô Chợ Dừa is the owner of 24 contractor selection plan. In which, they self-invite 24 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor UBND phường Ô Chợ Dừa is the investor of 8 package, of which 7 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND phường Ô Chợ Dừa is the owner of 44 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor UBND phường Ô Chợ Dừa has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND phường Ô Chợ Dừa is an investor with 25 contractor. The data sheet has been partially hidden, to see the full information please Login or Register