Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners UBND Xã Hà Long as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 25 contractors.
- Announced 6 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 42 contractor selection plans with a total of 79 bidding packages, of which 30 prequalification documents have not found the investment project
- Has invited bids for 4 packages (with 5 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 38 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 37 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 42 packages that have not fully posted the contractor selection results. Of these 39 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 80.00%, Consultancy 20.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 15,312,735,438 VND, of which the total winning bid value is: 14,940,380,197 VND.
- The savings rate is: 2.43%.
Data analysis results of DauThau.info software for project owners UBND Xã Hà Long as follows:
- Has relationships with 25 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 80.00%, Consulting 20.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 15,312,735,438 VND, in which the total winning value is: 14,940,380,197 VND.
- The savings rate is: 2.43%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UBND Xã Hà Long has posted the request Project contractor selection plan: Maintenance and repair of irrigation canals and drainage ditches in Bac Son village, Ha Long commune. of the investor UBND Xã Hà Long with 4 bidding package.
12/08/2026 14:53
The Bid solicitor UBND Xã Hà Long has posted the request The procurement plan outlines the steps for selecting a contractor to carry out tasks related to the project preparation phase: renovation and repair of the road from Dong Hau village to Quang Binh village, Ha Long commune. of the investor UBND Xã Hà Long with 2 bidding package.
12/08/2026 10:43
UBND Xã Hà Long Posted Development Investment Project Repairing and maintaining the irrigation canals and drainage system in North Son Village, Ha Long Commune, Thanh Hoa Province..
12/08/2026 10:10
The Bid solicitor UBND Xã Hà Long has posted the request The procurement plan covers the tasks associated with the project preparation phase: Upgrading and improving rural roads in Ha Long commune. of the investor UBND Xã Hà Long with 2 bidding package.
12/08/2026 09:50
The Bid solicitor UBND Xã Hà Long has posted the request The procurement plan covers the tasks associated with the project preparation phase: renovation, repair, and equipment installation for schools in Ha Long commune. of the investor UBND Xã Hà Long with 3 bidding package.
12/08/2026 09:25
The Bid solicitor UBND Xã Hà Long has posted the request The procurement plan covers the tasks associated with the project preparation phase: Repair, renovation, and upgrading of the Ha Long village radio communication system. of the investor UBND Xã Hà Long with 2 bidding package.
12/08/2026 08:57
Bid solicitor UBND Xã Hà Long has posted Tender Notice Tender package No 03: Construction work of the investor UBND Xã Hà Long with the form Open bidding.
09/08/2026 11:28
The Bid solicitor UBND Xã Hà Long has posted the results of the bidding package Package No. 05: Construction + Safety assurance of the investor UBND Xã Hà Long.
- Winning bidder: VIET BAC CONSTRUCTION AND INSTALLATION COMPANY LIMITED
09/08/2026 06:02
The Bid solicitor UBND Xã Hà Long has posted the results of the bidding package Bidding package No. 01: Consulting EHSMT and E-HSDT evaluation of the investor UBND Xã Hà Long.
- Winning bidder: CÔNG TY TNHH GIA HUY 368
04/08/2026 15:03
Bid solicitor UBND Xã Hà Long has posted Tender Notice Tender package No 01: Construction work + equipment installation + static compression of the investor UBND Xã Hà Long with the form Open bidding.
30/07/2026 20:57
The data sheet has been partially hidden, to see the full information please Login or Register
UBND Xã Hà Long announced the results of the bid package Package 03: Construction + equipment .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG HOÀNG TIẾN ĐẠT
04/03/2026 08:24
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND Xã Hà Long has posted the request Project contractor selection plan: Maintenance and repair of irrigation canals and drainage ditches in Bac Son village, Ha Long commune. of the investor UBND Xã Hà Long with 4 bidding package.
12/08/2026 14:53
The Bid solicitor UBND Xã Hà Long has posted the request The procurement plan outlines the steps for selecting a contractor to carry out tasks related to the project preparation phase: renovation and repair of the road from Dong Hau village to Quang Binh village, Ha Long commune. of the investor UBND Xã Hà Long with 2 bidding package.
12/08/2026 10:43
UBND Xã Hà Long Posted Development Investment Project Repairing and maintaining the irrigation canals and drainage system in North Son Village, Ha Long Commune, Thanh Hoa Province..
12/08/2026 10:10
The Bid solicitor UBND Xã Hà Long has posted the request The procurement plan covers the tasks associated with the project preparation phase: Upgrading and improving rural roads in Ha Long commune. of the investor UBND Xã Hà Long with 2 bidding package.
12/08/2026 09:50
The Bid solicitor UBND Xã Hà Long has posted the request The procurement plan covers the tasks associated with the project preparation phase: renovation, repair, and equipment installation for schools in Ha Long commune. of the investor UBND Xã Hà Long with 3 bidding package.
12/08/2026 09:25
The Bid solicitor UBND Xã Hà Long has posted the request The procurement plan covers the tasks associated with the project preparation phase: Repair, renovation, and upgrading of the Ha Long village radio communication system. of the investor UBND Xã Hà Long with 2 bidding package.
12/08/2026 08:57
Bid solicitor UBND Xã Hà Long has posted Tender Notice Tender package No 03: Construction work of the investor UBND Xã Hà Long with the form Open bidding.
09/08/2026 11:28
The Bid solicitor UBND Xã Hà Long has posted the results of the bidding package Package No. 05: Construction + Safety assurance of the investor UBND Xã Hà Long.
- Winning bidder: VIET BAC CONSTRUCTION AND INSTALLATION COMPANY LIMITED
09/08/2026 06:02
The Bid solicitor UBND Xã Hà Long has posted the results of the bidding package Bidding package No. 01: Consulting EHSMT and E-HSDT evaluation of the investor UBND Xã Hà Long.
- Winning bidder: CÔNG TY TNHH GIA HUY 368
04/08/2026 15:03
Bid solicitor UBND Xã Hà Long has posted Tender Notice Tender package No 01: Construction work + equipment installation + static compression of the investor UBND Xã Hà Long with the form Open bidding.
30/07/2026 20:57
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND Xã Hà Long is the investor of 6 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor UBND Xã Hà Long is the owner of 42 contractor selection plan. In which, they self-invite 0 of contractor selection plan, other units invite bids of 42 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor UBND Xã Hà Long is the investor of 5 package, of which 0 package is self-invited, other units invite bid 5 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND Xã Hà Long is the owner of 38 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor UBND Xã Hà Long has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND Xã Hà Long is an investor with 27 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.