CÔNG TY CỔ PHẦN SÔNG ĐÀ 4

Found: 17:10 01/10/2022
Certificate of Capacity in construction
00019379
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address (after merge)
Tầng 3, tòa nhà TM, khu đô thị Văn Khê
Moderator
Address (before merger)
Tầng 3, tòa nhà TM, khu đô thị Văn Khê, phường La Khê, quận Hà Đông, TP.Hà Nội
Representative
Nguyễn Tiến Dũng  
Position
Tổng giám đốc
Tax code/ Establish decision no.
5900189325
Certification date
15/11/2007
Granting agencies
Sở kế hoạch đầu tư

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
HAN-00019379
Thi công xây dựng công trình
NN&PTNTThủy lợi
III
02/08/2029
2
HAN-00019379
Thi công xây dựng công trình
NN&PTNT
Thủy lợi
II
23/09/2029
3
BXD-00019379
Thi công xây dựng công trình
Công nghiệp (năng lượng, vật liệu xây dựng)
I
28/12/2028
4
HAP-00019379
Thi công xây dựng công trình
Thi công công tác xây dựng công trình đường bộ.
II
23/09/2029
5
HAP-00019379
Thi công xây dựng công trình
Thi công công tác xây dựng công trình cầu.
III
23/09/2029
6
HAN-00019379
Thi công xây dựng công trình
Dân dụng
II
15/11/2031
7
HAN-00019379
Thi công lắp đặt thiết bị vào công trình

II
15/11/2031
8
HAN-00019379
Thi công xây dựng công trình
Hạ tầng kỹ thuật
II
15/11/2031
9
HAN-00019379
Giám sát thi công xây dựng công trình
Dân dụng
III
15/11/2031
10
HAN-00019379
Giám sát thi công xây dựng công trình
Hạ tầng kỹ thuật
III
15/11/2031

This construction organization is also a contractor. The results of data analysis for contractors SONG DA 4 JOINT STOCK COMPANY are as follows:

  • Participated in 5 bidding packages, of which 3 were won, 2 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 77.95% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 81.51% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : Gia Lai (1), Vĩnh Long (1), Undefined (3)
  • Provinces before the merger where the contractor has participated in bidding : Gia Lai (1), Trà Vinh (1), Undefined (3)
  • Has relationships with 4 Bid Solicitors
  • Has competed against 11 contractors in 2 bidding packages, won 0 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 2 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 0 bidding packages with 0 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This construction organization is also the Procuring Entity. The results of data analysis for the procuring entity SONG DA 4 JOINT STOCK COMPANY are as follows:
  • Published contractor selection plan of 17 project with total 46 bidding packages.
  • Invitation for bids 15 package (with 15 bidding notice), conduct prequalification 0 package.
  • Results announced of 14 packages, cancel bids 0 packages (among the packages above).
  • Yes 11 packages with results without Tender/Prequalified notification .
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second