Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
| No. | Number of certificates | Category | Extended category | Rank | Expired date |
|---|---|---|---|---|---|
1 |
BXD-00005679 |
Thi công xây dựng công trình |
Đường dây và Trạm biến áp |
I |
28/11/2022 |
This construction organization is also a contractor. The results of data analysis for contractors TOJI GROUP JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 1251 bidding packages, of which 446 were won, 714 were lost, 34 are pending results, and 57 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 4.69% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.95% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (318), Đà Nẵng (117), TP.Hồ Chí Minh (113), Khánh Hòa (55), Đồng Nai (53), Hải Phòng (40), Phú Thọ (32), Gia Lai (31), Lâm Đồng (27), Nghệ An (26), Ninh Bình (25), Lào Cai (24), Hưng Yên (23), Đắk Lắk (22), Bắc Ninh (20), Quảng Trị (19), Tuyên Quang (18), Quảng Ngãi (17), Thanh Hoá (16), An Giang (14), Tây Ninh (13), Sơn La (13), Quảng Ninh (12), Lai Châu (11), Huế (11), Vĩnh Long (11), Thái Nguyên (11), Hà Tĩnh (9), Cà Mau (8), Lạng Sơn (8), Cao Bằng (6), Cần Thơ (6), Điện Biên (6), Đồng Tháp (2), Undefined (174)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (318), Đà Nẵng (94), TP.Hồ Chí Minh (85), Đồng Nai (47), Khánh Hòa (46), Nghệ An (26), Quảng Nam (19), Hải Phòng (17), Bình Định (16), Thanh Hoá (16), Hòa Bình (13), Gia Lai (13), Lào Cai (13), Sơn La (13), Yên Bái (13), Quảng Ninh (12), Đắk Lắk (12), Thái Bình (12), Lai Châu (11), Hải Dương (11), Huế (11), Ninh Bình (11), Bà Rịa - Vũng Tàu (11), Bình Dương (11), Quảng Bình (10), Bắc Ninh (10), Phú Thọ (10), Vĩnh Phúc (10), Lâm Đồng (10), Bình Thuận (9), Quảng Ngãi (9), Hà Tĩnh (9), Phú Yên (8), Lạng Sơn (8), Đắk Nông (7), Long An (7), Quảng Trị (7), An Giang (7), Kon Tum (7), Nam Định (7), Hà Giang (7), Bình Phước (7), Hưng Yên (7), Ninh Thuận (7), Kiên Giang (7), Tây Ninh (6), Cao Bằng (6), Bến Tre (6), Bắc Giang (6), Tuyên Quang (6), Điện Biên (6), Cà Mau (5), Trà Vinh (4), Thái Nguyên (4), Hậu Giang (3), Hà Nam (3), Bắc Kạn (3), Bạc Liêu (3), Đồng Tháp (2), Sóc Trăng (2), Vĩnh Long (1), Cần Thơ (1), Undefined (206)
- Has relationships with 276 Bid Solicitors
- Has relationships with 154 Bid Investors
- Has competed against 722 contractors in 1106 bidding packages, won 313 packages, lost 710 packages, 31 are pending results, and 52 were canceled.
- Has collaborated with 117 contractors in 249 bidding packages, won 157 packages, lost 82 packages, 3 are pending results, and 7 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.