Surveying and preparing economic and technical reports for the project: "Replacing some contractile joints - expansion joints of the aircraft apron (The apron was put into use 2009-2011)"
Summary: Contractor AIRPORT DESIGN AND CONSTRUCTION CONSULTANCY ONE MEMBER LIMITED LIABILITY COMPANY ADCC participated in 2 of the bid package of the procuring entity: CAN THO INTERNATIONAL AIRPORT, in which the winning bid 2 package, failed 0 packages, 0 packages with no results, 0 packages canceled.
Data table has been partially hidden, please Login or Register to check the right to see full information. Note: To view full information you must Register for VIP3 package
Top contractor who participated the most in the bid