Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Department of Natural Disaster Prevention and Control as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 0 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 2 contractor selection plans with a total of 8 bidding packages, of which 2 prequalification documents have not found the investment project
- Has invited bids for 0 packages (with 0 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 0 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 4 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for project owners Department of Natural Disaster Prevention and Control as follows:
- Has relationships with 0 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Department of Natural Disaster Prevention and Control has posted the request Contractor selection plan to estimate the cost of procurement and repair of public assets in 2024 of Hanoi Irrigation and Disaster Prevention Department of the investor Department of Natural Disaster Prevention and Control with 1 bidding package.
03/04/2024 09:42
The Bid solicitor Department of Natural Disaster Prevention and Control has posted the request Operational science and technology: Deploying and replicating the smart monitoring system and building an irrigation database to serve the direction of operating irrigation works, managing water supply, water drainage, and flood prevention for agricultural products. agricultural production, people's livelihood and ensuring the safety of dams and water reservoirs; proactively monitor droughts, water shortages, floods and waterlogging of the investor Department of Natural Disaster Prevention and Control with 7 bidding package.
13/11/2023 16:58
The data sheet has been partially hidden, to see the full information please Login or Register
Department of Natural Disaster Prevention and Control publishes the plan Contractor selection plan to estimate the cost of procurement and repair of public assets in 2024 of Hanoi Irrigation and Disaster Prevention Department with 1 bidding package .
03/04/2024 09:42
Department of Natural Disaster Prevention and Control publishes the plan Operational science and technology: Deploying and replicating the smart monitoring system and building an irrigation database to serve the direction of operating irrigation works, managing water supply, water drainage, and flood prevention for agricultural products. agricultural production, people's livelihood and ensuring the safety of dams and water reservoirs; proactively monitor droughts, water shortages, floods and waterlogging with 7 bidding package .
13/11/2023 16:58
Department of Natural Disaster Prevention and Control publishes the plan Urgent support to overcome drought and saltwater intrusion in the South Central region, Central Highlands and Mekong Delta with 1 bidding package .
24/02/2017 11:07
Department of Natural Disaster Prevention and Control publishes the plan Urgent support to overcome drought and saltwater intrusion in the South Central region, Central Highlands and Mekong Delta with 10 bidding package .
26/12/2016 18:44
Department of Natural Disaster Prevention and Control publishes the plan Building a system of watchmanship, disaster warning, multi-purpose with 7 bidding package .
26/12/2016 17:34
Department of Natural Disaster Prevention and Control publishes Tender Notice Package 5: Construction, equipment supply, installation and training, technology transfer training in 02 provinces of Da Nang, Quang Nam and central agencies (Posted on bidding newspaper No. 212 November 7, 2016) in the form National competitive bidding .
07/11/2016 08:30
Department of Natural Disaster Prevention and Control publishes the plan Building a system of watchmanship, disaster warning, multi-purpose with 9 bidding package .
02/08/2016 16:46
Department of Natural Disaster Prevention and Control publishes Tender Notice Project management consultant (phase 1), under the project "Building a system of watchkeeping, disaster warning, multi-purpose" (Published on bidding newspaper No. 139 on July 26, 2016) in the form National competitive bidding .
26/07/2016 07:11
Department of Natural Disaster Prevention and Control publishes Tender Notice Consulting, surveying, designing BVTC-Establishment of construction works (phase 1) (Posted on bidding newspaper No. 131 on 14/07/2016) in the form National competitive bidding .
14/07/2016 06:31
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Department of Natural Disaster Prevention and Control has posted the request Contractor selection plan to estimate the cost of procurement and repair of public assets in 2024 of Hanoi Irrigation and Disaster Prevention Department of the investor Department of Natural Disaster Prevention and Control with 1 bidding package.
03/04/2024 09:42
The Bid solicitor Department of Natural Disaster Prevention and Control has posted the request Operational science and technology: Deploying and replicating the smart monitoring system and building an irrigation database to serve the direction of operating irrigation works, managing water supply, water drainage, and flood prevention for agricultural products. agricultural production, people's livelihood and ensuring the safety of dams and water reservoirs; proactively monitor droughts, water shortages, floods and waterlogging of the investor Department of Natural Disaster Prevention and Control with 7 bidding package.
13/11/2023 16:58
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Department of Natural Disaster Prevention and Control is the owner of 2 contractor selection plan. In which, they self-invite 2 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: The investor Department of Natural Disaster Prevention and Control has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.