Data analysis results of DauThau.info software for project owners GIA LAI POWER COMPANY as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 241 contractors.
- Announced 184 development investment project, of which 17 projects that have not announced the contractor selection plan.
- Announced 932 contractor selection plans with a total of 1528 bidding packages, of which 447 prequalification documents have not found the investment project
- Has invited bids for 406 packages (with 488 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 139 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 54 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 285 packages that have not fully posted the contractor selection results. Of these 225 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.98 contractors.
- Breakdown by bidding field: Goods 39.55%, Construction 35.45%, Consultancy 22.13%, Non-consultancy 2.87%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 357,277,361,689 VND, of which the total winning bid value is: 331,457,467,905 VND.
- The savings rate is: 7.23%.
Data analysis results of DauThau.info software for project owners GIA LAI POWER COMPANY as follows:
- Has relationships with 241 contractors.
- The average number of contractors participating in each bidding package is: 2.98 contractors.
- Proportion of bidding fields: Goods 39.55%, Construction 35.45%, Consulting 22.13%, Non-consulting 2.87%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 357,277,361,689 VND, in which the total winning value is: 331,457,467,905 VND.
- The savings rate is: 7.23%.
You need to Login or Sign up to view all informations.
- Participated in 314 bidding packages, of which 314 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 7.24% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 85.84% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Gia Lai (307), Undefined (7)
- Provinces before the merger where the contractor has participated in bidding : Bình Định (103), Gia Lai (48), Undefined (163)
- Has relationships with 4 Bid Solicitors
- Has relationships with 4 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 530 bidding packages with 32 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor GIA LAI POWER COMPANY has posted the request Repair of low-to-medium voltage power lines in the Phu My area, 2026 of the investor GIA LAI POWER COMPANY with 1 bidding package.
26/08/2026 08:18
The Bid solicitor GIA LAI POWER COMPANY has posted the request Plan for Selecting a Contractor: Repair of the DTZA area in Pleiku, 2026, Phase 2 of the investor GIA LAI POWER COMPANY with 1 bidding package.
21/08/2026 15:08
The Bid solicitor GIA LAI POWER COMPANY has posted the request Repair work for the Tuy Phuoc irrigation system in 2026 of the investor GIA LAI POWER COMPANY with 1 bidding package.
21/08/2026 10:50
The Bid solicitor GIA LAI POWER COMPANY has posted the request Major repair work on low-to-medium voltage power lines in Phu Phong area, scheduled for 2026. of the investor GIA LAI POWER COMPANY with 1 bidding package.
20/08/2026 10:51
The Bid solicitor GIA LAI POWER COMPANY has posted the request Construction Contractor Selection Plan: Repair of the DTZA area in Mang Yang, 2026 of the investor GIA LAI POWER COMPANY with 1 bidding package.
18/08/2026 11:23
The Bid solicitor GIA LAI POWER COMPANY has posted the request Major repair work on a 77C-216.69 truck with a crane and platform for lifting personnel. of the investor GIA LAI POWER COMPANY with 1 bidding package.
11/08/2026 16:58
The Bid solicitor GIA LAI POWER COMPANY has posted the request Major repair work on a Mazda pickup truck with license plate 77C-144.11. of the investor GIA LAI POWER COMPANY with 1 bidding package.
11/08/2026 16:52
The Bid solicitor GIA LAI POWER COMPANY has posted the request Supply of equipment for the repair and maintenance of the 110kV Quy Nhon 220 kV – Song Cau, Dak Doa – Mang Yang, Ia Bang 1 substation – Chư Prông – Duc Co – Ia Grai substation, and Ia Pech substation in 2026. of the investor GIA LAI POWER COMPANY with 1 bidding package.
06/08/2026 13:19
The Bid solicitor GIA LAI POWER COMPANY has posted the request Repairing Dong Da 110kV underground cable line - Quy Nhon Port of the investor GIA LAI POWER COMPANY with 1 bidding package.
04/08/2026 13:59
The Bid solicitor GIA LAI POWER COMPANY has posted the request Plan to select contractors for projects: Repairing DZHA Northern Dak Doa area in 2026; Repair DZHA and Southern substation in Dak Doa area in 2026 of the investor GIA LAI POWER COMPANY with 1 bidding package.
04/08/2026 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
GIA LAI POWER COMPANY publishes the plan Bidding contractor Package No. 02-TVKT-2025: Consulting audit of construction construction works in 2025 with 1 bidding package .
24/07/2025 10:14
GIA LAI POWER COMPANY publishes the plan Bidding contractor Package No. 01-TVKT-2025: Consulting audit of construction projects in 2025 with 1 bidding package .
24/07/2025 10:01
GIA LAI POWER COMPANY publishes the plan The plan to select the audit contractor to complete the construction of construction investment in 2025 - phase 3 with 1 bidding package .
17/06/2025 10:59
GIA LAI POWER COMPANY publishes the plan Plan for selecting construction contractors: Electrical power supply of military command of Gia Lai province - Ia Bă - Ia Grai with 3 bidding package .
16/06/2025 15:33
GIA LAI POWER COMPANY publishes the plan Project contractor selection plan: Exploitation after tba 110kV Dak Doa Phase 2 - Construction XT 471 & 473 Ddo with 4 bidding package .
16/06/2025 09:27
GIA LAI POWER COMPANY publishes the plan Project contractor selection plan: Exploitation after tba 110kV Dak Doa Phase 2 - Construction XT 471 & 473 Ddo with 4 bidding package .
13/06/2025 09:11
GIA LAI POWER COMPANY publishes the plan Plan for selecting construction contractors: Electrical power supply of military command of Gia Lai province - Ia Bă - Ia Grai with 3 bidding package .
12/06/2025 14:24
GIA LAI POWER COMPANY publishes the plan Plan for selecting construction contractors: Exploiting after tba 110kV Dak Doa Phase 3 - Finishing route 475ddo with 4 bidding package .
12/06/2025 14:19
GIA LAI POWER COMPANY publishes the plan Plan for selecting construction contractors: Electrical power supply of military command of Gia Lai province - Ia Bă - Ia Grai with 2 bidding package .
12/06/2025 07:38
GIA LAI POWER COMPANY publishes the plan Providing VTTB serving construction, SCL, SCTX, SXKD works in 2025 phase 3 with 4 bidding package .
29/05/2025 14:16
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor GIA LAI POWER COMPANY has posted the request Repair of low-to-medium voltage power lines in the Phu My area, 2026 of the investor GIA LAI POWER COMPANY with 1 bidding package.
26/08/2026 08:18
The Bid solicitor GIA LAI POWER COMPANY has posted the request Plan for Selecting a Contractor: Repair of the DTZA area in Pleiku, 2026, Phase 2 of the investor GIA LAI POWER COMPANY with 1 bidding package.
21/08/2026 15:08
The Bid solicitor GIA LAI POWER COMPANY has posted the request Repair work for the Tuy Phuoc irrigation system in 2026 of the investor GIA LAI POWER COMPANY with 1 bidding package.
21/08/2026 10:50
The Bid solicitor GIA LAI POWER COMPANY has posted the request Major repair work on low-to-medium voltage power lines in Phu Phong area, scheduled for 2026. of the investor GIA LAI POWER COMPANY with 1 bidding package.
20/08/2026 10:51
The Bid solicitor GIA LAI POWER COMPANY has posted the request Construction Contractor Selection Plan: Repair of the DTZA area in Mang Yang, 2026 of the investor GIA LAI POWER COMPANY with 1 bidding package.
18/08/2026 11:23
The Bid solicitor GIA LAI POWER COMPANY has posted the request Major repair work on a 77C-216.69 truck with a crane and platform for lifting personnel. of the investor GIA LAI POWER COMPANY with 1 bidding package.
11/08/2026 16:58
The Bid solicitor GIA LAI POWER COMPANY has posted the request Major repair work on a Mazda pickup truck with license plate 77C-144.11. of the investor GIA LAI POWER COMPANY with 1 bidding package.
11/08/2026 16:52
The Bid solicitor GIA LAI POWER COMPANY has posted the request Supply of equipment for the repair and maintenance of the 110kV Quy Nhon 220 kV – Song Cau, Dak Doa – Mang Yang, Ia Bang 1 substation – Chư Prông – Duc Co – Ia Grai substation, and Ia Pech substation in 2026. of the investor GIA LAI POWER COMPANY with 1 bidding package.
06/08/2026 13:19
The Bid solicitor GIA LAI POWER COMPANY has posted the request Repairing Dong Da 110kV underground cable line - Quy Nhon Port of the investor GIA LAI POWER COMPANY with 1 bidding package.
04/08/2026 13:59
The Bid solicitor GIA LAI POWER COMPANY has posted the request Plan to select contractors for projects: Repairing DZHA Northern Dak Doa area in 2026; Repair DZHA and Southern substation in Dak Doa area in 2026 of the investor GIA LAI POWER COMPANY with 1 bidding package.
04/08/2026 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor GIA LAI POWER COMPANY is the investor of 184 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor GIA LAI POWER COMPANY is the owner of 932 contractor selection plan. In which, they self-invite 569 of contractor selection plan, other units invite bids of 363 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor GIA LAI POWER COMPANY is the investor of 488 package, of which 466 package is self-invited, other units invite bid 22 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor GIA LAI POWER COMPANY is the owner of 139 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor GIA LAI POWER COMPANY has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor GIA LAI POWER COMPANY is an investor with 241 contractor. The data sheet has been partially hidden, to see the full information please Login or Register