Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors GIA LAI POWER COMPANY as follows:
- Has relationships with 2 project owners.
- Has relationships with 270 contractor.
- Announced 184 investment development project, of which 17 projects have not yet announced the prequalification documents.
- Announced 571 contractor selection plans with a total of 924 bidding packages, of which 233 prequalification documents have not found the investment project.
- Has invited bids for 465 packages (with 541 tender notices), and conducted prequalification for 0 packages.
- There are 18 bidding packages with content that needs clarification.
- Announced the results of 442 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 58 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 234 packages that have not fully posted the contractor selection results. Of these 203 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.87 contractors.
- Breakdown by bidding field: Goods 41.59%, Construction 35.30%, Consultancy 19.96%, Non-consultancy 2.96%, Mixed 0.18%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 921,629,530,058 VND, of which the total winning bid value is: 814,186,579,902 VND.
- The savings rate is: 11.66%.
Data analysis results of DauThau.info software for bid solicitors GIA LAI POWER COMPANY as follows:
- Has relationships with 270 contractor.
- The average number of contractors participating in each bidding package is: 2.87 contractors.
- Proportion of bidding fields: Goods 41.59%, Construction 35.30%, Consulting 19.96%, Non-consulting 2.96%, Mixed 0.18%, Other 0%.
- The total value according to the bidding package with valid IMP is: 921,629,530,058 VND, in which the total winning value is: 814,186,579,902 VND.
- The savings rate is: 11.66%.
This Bid solicitor is also an investor. The analysis results of data for the investor GIA LAI POWER COMPANY are as follows:
- Is the investor of 184 development investment projects.
- Is the investor of 932 contractor selection plans, of which 569 were self-published, and 363 were published by other entities.
- Is the investor of 488 Tender Notices, of which 466 were self-invited, and 22 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 314 bidding packages, of which 314 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 7.24% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 85.84% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Gia Lai (307), Undefined (7)
- Provinces before the merger where the contractor has participated in bidding : Bình Định (103), Gia Lai (48), Undefined (163)
- Has relationships with 4 Bid Solicitors
- Has relationships with 4 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 530 bidding packages with 32 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
GIA LAI POWER COMPANY publishes the plan Repair of low-to-medium voltage power lines in the Phu My area, 2026 with 1 bidding package .
26/08/2026 08:18
GIA LAI POWER COMPANY publishes the plan Plan for Selecting a Contractor: Repair of the DTZA area in Pleiku, 2026, Phase 2 with 1 bidding package .
21/08/2026 15:08
GIA LAI POWER COMPANY publishes the plan Repair work for the Tuy Phuoc irrigation system in 2026 with 1 bidding package .
21/08/2026 10:50
GIA LAI POWER COMPANY publishes the plan Major repair work on low-to-medium voltage power lines in Phu Phong area, scheduled for 2026. with 1 bidding package .
20/08/2026 10:51
GIA LAI POWER COMPANY publishes the plan Construction Contractor Selection Plan: Repair of the DTZA area in Mang Yang, 2026 with 1 bidding package .
18/08/2026 11:23
GIA LAI POWER COMPANY publishes the plan Major repair work on a 77C-216.69 truck with a crane and platform for lifting personnel. with 1 bidding package .
11/08/2026 16:58
GIA LAI POWER COMPANY publishes the plan Major repair work on a Mazda pickup truck with license plate 77C-144.11. with 1 bidding package .
11/08/2026 16:52
GIA LAI POWER COMPANY publishes the plan Supply of equipment for the repair and maintenance of the 110kV Quy Nhon 220 kV – Song Cau, Dak Doa – Mang Yang, Ia Bang 1 substation – Chư Prông – Duc Co – Ia Grai substation, and Ia Pech substation in 2026. with 1 bidding package .
06/08/2026 13:19
GIA LAI POWER COMPANY publishes the plan Repairing Dong Da 110kV underground cable line - Quy Nhon Port with 1 bidding package .
04/08/2026 13:59
GIA LAI POWER COMPANY publishes the plan Plan to select contractors for projects: Repairing DZHA Northern Dak Doa area in 2026; Repair DZHA and Southern substation in Dak Doa area in 2026 with 1 bidding package .
04/08/2026 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
GIA LAI POWER COMPANY publishes the plan Bidding contractor Package No. 02-TVKT-2025: Consulting audit of construction construction works in 2025 with 1 bidding package .
24/07/2025 10:14
GIA LAI POWER COMPANY publishes the plan Bidding contractor Package No. 01-TVKT-2025: Consulting audit of construction projects in 2025 with 1 bidding package .
24/07/2025 10:01
GIA LAI POWER COMPANY publishes the plan The plan to select the audit contractor to complete the construction of construction investment in 2025 - phase 3 with 1 bidding package .
17/06/2025 10:59
GIA LAI POWER COMPANY publishes the plan Plan for selecting construction contractors: Electrical power supply of military command of Gia Lai province - Ia Bă - Ia Grai with 3 bidding package .
16/06/2025 15:33
GIA LAI POWER COMPANY publishes the plan Project contractor selection plan: Exploitation after tba 110kV Dak Doa Phase 2 - Construction XT 471 & 473 Ddo with 4 bidding package .
16/06/2025 09:27
GIA LAI POWER COMPANY publishes the plan Project contractor selection plan: Exploitation after tba 110kV Dak Doa Phase 2 - Construction XT 471 & 473 Ddo with 4 bidding package .
13/06/2025 09:11
GIA LAI POWER COMPANY publishes the plan Plan for selecting construction contractors: Electrical power supply of military command of Gia Lai province - Ia Bă - Ia Grai with 3 bidding package .
12/06/2025 14:24
GIA LAI POWER COMPANY publishes the plan Plan for selecting construction contractors: Exploiting after tba 110kV Dak Doa Phase 3 - Finishing route 475ddo with 4 bidding package .
12/06/2025 14:19
GIA LAI POWER COMPANY publishes the plan Plan for selecting construction contractors: Electrical power supply of military command of Gia Lai province - Ia Bă - Ia Grai with 2 bidding package .
12/06/2025 07:38
GIA LAI POWER COMPANY publishes the plan Providing VTTB serving construction, SCL, SCTX, SXKD works in 2025 phase 3 with 4 bidding package .
29/05/2025 14:16
The data sheet has been partially hidden, to see the full information please Login or Register
GIA LAI POWER COMPANY publishes the plan Repair of low-to-medium voltage power lines in the Phu My area, 2026 with 1 bidding package .
26/08/2026 08:18
GIA LAI POWER COMPANY publishes the plan Plan for Selecting a Contractor: Repair of the DTZA area in Pleiku, 2026, Phase 2 with 1 bidding package .
21/08/2026 15:08
GIA LAI POWER COMPANY publishes the plan Repair work for the Tuy Phuoc irrigation system in 2026 with 1 bidding package .
21/08/2026 10:50
GIA LAI POWER COMPANY publishes the plan Major repair work on low-to-medium voltage power lines in Phu Phong area, scheduled for 2026. with 1 bidding package .
20/08/2026 10:51
GIA LAI POWER COMPANY publishes the plan Construction Contractor Selection Plan: Repair of the DTZA area in Mang Yang, 2026 with 1 bidding package .
18/08/2026 11:23
GIA LAI POWER COMPANY publishes the plan Major repair work on a 77C-216.69 truck with a crane and platform for lifting personnel. with 1 bidding package .
11/08/2026 16:58
GIA LAI POWER COMPANY publishes the plan Major repair work on a Mazda pickup truck with license plate 77C-144.11. with 1 bidding package .
11/08/2026 16:52
GIA LAI POWER COMPANY publishes the plan Supply of equipment for the repair and maintenance of the 110kV Quy Nhon 220 kV – Song Cau, Dak Doa – Mang Yang, Ia Bang 1 substation – Chư Prông – Duc Co – Ia Grai substation, and Ia Pech substation in 2026. with 1 bidding package .
06/08/2026 13:19
GIA LAI POWER COMPANY publishes the plan Repairing Dong Da 110kV underground cable line - Quy Nhon Port with 1 bidding package .
04/08/2026 13:59
GIA LAI POWER COMPANY publishes the plan Plan to select contractors for projects: Repairing DZHA Northern Dak Doa area in 2026; Repair DZHA and Southern substation in Dak Doa area in 2026 with 1 bidding package .
04/08/2026 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s GIA LAI POWER COMPANY has posted 571 of the contractor selection plan, which contains 924 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor GIA LAI POWER COMPANY has posted 541 Tender Notices in 465 bidding packages. Among these, 435 Tender Notices were self-invited, and 106 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor GIA LAI POWER COMPANY has posted 442 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 442 package, canceled the bid 0 package (among the bidding packages above).
- There are 58 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor GIA LAI POWER COMPANY has a relationship with 270 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor GIA LAI POWER COMPANY has a relationship with 17 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity GIA LAI POWER COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects