Data analysis results of DauThau.info software for project owners Hydropower Project Management Board No1 as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 18 contractors.
- Announced 1 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 3 contractor selection plans with a total of 3 bidding packages, of which 3 prequalification documents have not found the investment project
- Has invited bids for 17 packages (with 17 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 26 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.67 contractors.
- Breakdown by bidding field: Goods 47.06%, Construction 11.76%, Consultancy 35.29%, Non-consultancy 5.88%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 74,498,347,576 VND, of which the total winning bid value is: 67,359,690,063 VND.
- The savings rate is: 9.58%.
Data analysis results of DauThau.info software for project owners Hydropower Project Management Board No1 as follows:
- Has relationships with 18 contractors.
- The average number of contractors participating in each bidding package is: 1.67 contractors.
- Proportion of bidding fields: Goods 47.06%, Construction 11.76%, Consulting 35.29%, Non-consulting 5.88%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 74,498,347,576 VND, in which the total winning value is: 67,359,690,063 VND.
- The savings rate is: 9.58%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Package 07 (BM-03): Construction of clearing mines and explosives in the construction area of Se San 4 Solar Power Plant Project of the investor Hydropower Project Management Board No1.
02/01/2019 09:46
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Package 04 (TV-03): Consulting on surveying and mapping cadastral maps for preparation of documents and procedures for land recovery, land allocation, land use purpose change for compensation and support work clearance of the investor Hydropower Project Management Board No1.
25/10/2018 13:53
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Package No. 09 (XL-01): Construction, renovation and repair of the office and housing of the Project Management Board at Se San 4 project of the investor Hydropower Project Management Board No1.
25/10/2018 13:16
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Package 2 (TV-01): Consulting on evaluating prequalification documents, EPC bids and assisting in EPC contract negotiation of the investor Hydropower Project Management Board No1.
12/10/2018 15:17
Hydropower Project Management Board No1 Posted Development Investment Project Sesan 4 . solar power plant.
20/08/2018 09:09
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Package 2: Procurement of desktop computers, A3 printers, A4 printers under the cost of Hydropower Project Management Board 1 in 2018 of the investor Hydropower Project Management Board No1.
13/08/2018 14:44
Bid solicitor Hydropower Project Management Board No1 has posted Tender Notice Package 2: Procurement of desktop computers, A3 printers, A4 printers under the cost of Hydropower Project Management Board 1 in 2018 of the investor Hydropower Project Management Board No1 with the form Competitive offers- No prequalification - Only domestic contractors.
19/07/2018 08:49
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Consulting and verifying feasibility study report on investment and construction of the expanded Ialy hydroelectric power plant project of the investor Hydropower Project Management Board No1.
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng Điện 2
14/06/2018 11:21
The Bid solicitor Hydropower Project Management Board No1 has posted the request Procurement of desktop computers, A3 printers, A4 printers at the expense of Hydropower Project Management Board 1 in 2018 of the investor Hydropower Project Management Board No1 with 1 bidding package.
04/06/2018 15:29
The Bid solicitor Hydropower Project Management Board No1 has posted the request Consulting and verifying feasibility study report for construction investment of Se San 4 solar power plant project of the investor Hydropower Project Management Board No1 with 1 bidding package.
04/05/2018 14:36
The data sheet has been partially hidden, to see the full information please Login or Register
Hydropower Project Management Board No1 publishes the plan Contractor selection plan for package No. 01 (HH-EPC): Design, supply of goods, construction and installation (EPC) with 1 bidding package .
04/03/2019 14:56
Hydropower Project Management Board No1 announced the results of the bid package Package 07 (BM-03): Construction of clearing mines and explosives in the construction area of Se San 4 Solar Power Plant Project .
- Winning bidder: TỔNG CÔNG TY XÂY DỰNG TRƯỜNG SƠN
02/01/2019 09:46
Hydropower Project Management Board No1 announced the results of the bid package Package 04 (TV-03): Consulting on surveying and mapping cadastral maps for preparation of documents and procedures for land recovery, land allocation, land use purpose change for compensation and support work clearance .
- Winning bidder: Công ty Cổ phần Đo đạc và Bản đồ Viễn Thám
25/10/2018 13:53
Hydropower Project Management Board No1 announced the results of the bid package Package No. 09 (XL-01): Construction, renovation and repair of the office and housing of the Project Management Board at Se San 4 project .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG YÊN HƯNG
25/10/2018 13:16
Hydropower Project Management Board No1 announced the results of the bid package Package 2 (TV-01): Consulting on evaluating prequalification documents, EPC bids and assisting in EPC contract negotiation .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 1
12/10/2018 15:17
Hydropower Project Management Board No1 announced the results of the bidding package Package 2 (TV-01): Consulting on evaluating prequalification documents, EPC bids and assisting in EPC contract negotiation with 2 participating contractors .
05/10/2018 09:18
Hydropower Project Management Board No1 publishes Tender Notice Package 2 (TV-01): Consulting on evaluating prequalification documents, EPC bids and assisting in EPC contract negotiation in the form National competitive bidding .
07/09/2018 15:26
Hydropower Project Management Board No1 publishes the plan Plan to select contractor for Sesan 4 solar power plant project (49Mw) with 9 bidding package .
20/08/2018 14:48
Hydropower Project Management Board No1 announced the results of the bid package Package 2: Procurement of desktop computers, A3 printers, A4 printers under the cost of Hydropower Project Management Board 1 in 2018 .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TRƯỜNG TIẾN
13/08/2018 14:44
Hydropower Project Management Board No1 announced the results of the bidding package Package 2: Procurement of desktop computers, A3 printers, A4 printers under the cost of Hydropower Project Management Board 1 in 2018 with 2 participating contractors .
26/07/2018 10:32
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Package 07 (BM-03): Construction of clearing mines and explosives in the construction area of Se San 4 Solar Power Plant Project of the investor Hydropower Project Management Board No1.
02/01/2019 09:46
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Package 04 (TV-03): Consulting on surveying and mapping cadastral maps for preparation of documents and procedures for land recovery, land allocation, land use purpose change for compensation and support work clearance of the investor Hydropower Project Management Board No1.
25/10/2018 13:53
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Package No. 09 (XL-01): Construction, renovation and repair of the office and housing of the Project Management Board at Se San 4 project of the investor Hydropower Project Management Board No1.
25/10/2018 13:16
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Package 2 (TV-01): Consulting on evaluating prequalification documents, EPC bids and assisting in EPC contract negotiation of the investor Hydropower Project Management Board No1.
12/10/2018 15:17
Hydropower Project Management Board No1 Posted Development Investment Project Sesan 4 . solar power plant.
20/08/2018 09:09
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Package 2: Procurement of desktop computers, A3 printers, A4 printers under the cost of Hydropower Project Management Board 1 in 2018 of the investor Hydropower Project Management Board No1.
13/08/2018 14:44
Bid solicitor Hydropower Project Management Board No1 has posted Tender Notice Package 2: Procurement of desktop computers, A3 printers, A4 printers under the cost of Hydropower Project Management Board 1 in 2018 of the investor Hydropower Project Management Board No1 with the form Competitive offers- No prequalification - Only domestic contractors.
19/07/2018 08:49
The Bid solicitor Hydropower Project Management Board No1 has posted the results of the bidding package Consulting and verifying feasibility study report on investment and construction of the expanded Ialy hydroelectric power plant project of the investor Hydropower Project Management Board No1.
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng Điện 2
14/06/2018 11:21
The Bid solicitor Hydropower Project Management Board No1 has posted the request Procurement of desktop computers, A3 printers, A4 printers at the expense of Hydropower Project Management Board 1 in 2018 of the investor Hydropower Project Management Board No1 with 1 bidding package.
04/06/2018 15:29
The Bid solicitor Hydropower Project Management Board No1 has posted the request Consulting and verifying feasibility study report for construction investment of Se San 4 solar power plant project of the investor Hydropower Project Management Board No1 with 1 bidding package.
04/05/2018 14:36
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Hydropower Project Management Board No1 is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Hydropower Project Management Board No1 is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Hydropower Project Management Board No1 is the investor of 17 package, of which 11 package is self-invited, other units invite bid 6 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Hydropower Project Management Board No1 is the owner of 26 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Hydropower Project Management Board No1 has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Hydropower Project Management Board No1 is an investor with 18 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!