Data analysis results of DauThau.info software for project owners Công ty Điện lực Thanh Trì as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 209 contractors.
- Announced 122 development investment project, of which 16 projects that have not announced the contractor selection plan.
- Announced 759 contractor selection plans with a total of 1110 bidding packages, of which 243 prequalification documents have not found the investment project
- Has invited bids for 336 packages (with 404 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 465 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 127 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 469 packages that have not fully posted the contractor selection results. Of these 458 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.61 contractors.
- Breakdown by bidding field: Goods 32.92%, Construction 29.70%, Consultancy 31.19%, Non-consultancy 6.19%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 960,057,966,839 VND, of which the total winning bid value is: 910,890,974,855 VND.
- The savings rate is: 5.12%.
Data analysis results of DauThau.info software for project owners Công ty Điện lực Thanh Trì as follows:
- Has relationships with 209 contractors.
- The average number of contractors participating in each bidding package is: 2.61 contractors.
- Proportion of bidding fields: Goods 32.92%, Construction 29.70%, Consulting 31.19%, Non-consulting 6.19%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 960,057,966,839 VND, in which the total winning value is: 910,890,974,855 VND.
- The savings rate is: 5.12%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Procurement Package: Supply of 30 sets of Windows 11 Pro licenses for business operations. of the investor Công ty Điện lực Thanh Trì with 1 bidding package.
28/08/2026 16:59
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the project investment phase: Building 01 22kV output from 110kV Dai Kim TBA to create connection with 110kV Linh Dam TBA of the investor Công ty Điện lực Thanh Trì with 4 bidding package.
18/08/2026 09:12
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the investment preparation phase of the Project: Overhaul and architectural repair of substations in Dai Thanh, Ngoc Hoi, Nam Phu, Thanh Tri communes and Tuong Mai, Hoang Mai, Dinh Cong, Vinh Hung wards in 2026 of the investor Công ty Điện lực Thanh Trì with 2 bidding package.
09/08/2026 18:25
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan Package No. 08-KHVT26-CGTTRR: "Procurement of low voltage cables, cable ends and accessories for production" of the investor Công ty Điện lực Thanh Trì with 1 bidding package.
30/07/2026 15:53
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Preparation phase contractor selection plan
02 Projects: i) Overhauling and repairing RMU cabinets and cabinets installing RMU cabinets on the power grid managed by Thanh Tri Electricity Company in 2026 and ii) Overhauling and repairing electrical architecture and technical infrastructure at transformer stations in Dinh Cong, Hoang Mai, Tuong Mai, Yen So, Linh Nam wards and Thanh Tri and Nam Phu communes in 2026 of the investor Công ty Điện lực Thanh Trì with 1 bidding package.
28/07/2026 17:14
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the construction phase of the project: "Overhauling and replacing RMU cabinets at substations in the wards of Hoang Liet, Tuong Mai, Hoang Mai, Vinh Hung in 2026" of the investor Công ty Điện lực Thanh Trì with 2 bidding package.
28/07/2026 15:00
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the investment preparation phase of bidding package: HN5.578-2026: Consulting on preparing TKBVTC-TDT, for 03 projects
- Project: Overhauling and replacing Pilar cabinets on the low voltage grid of substations: CT3 Hoang Van Thu, Apartment 229 Vong Street, Chua Set 1, Tan Mai 18, Tan Mai 9, Tan Mai 8, Tan Mai 6 in 2026.
- Project: Overhaul and repair of electrical technical infrastructure at transformer stations in Dinh Cong, Hoang Liet, Hoang Mai, Linh Nam, Yen So, Vinh Hung wards in 2026.
- Project: Overhaul and repair of electrical technical infrastructure at transformer stations in Dai Thanh, Thanh Tri, Ngoc Hoi, Nam Phu communes in 2026. of the investor Công ty Điện lực Thanh Trì with 1 bidding package.
27/07/2026 17:16
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Repair of RMU cabinets at transformer stations: Thuy Linh 12, Giap Tu 1, T1 Ao Sao Urban Area, Hoang Van Thu 21, Minh Tri Garment, Viet Trung 2, Hong Nam Mechanical, Tran Phu Station, Den Lu 12, KHLCNT: Hoang Van Thu 18, Tan Mai 9, Giap Bat 7, Linh Nam 15, Mai Dong 26, Hoang Van Thu 13, Medicine County Nhan, Dinh Cong 10+13, Dinh Cong 19, Dinh Cong 26, CT11 Kim Van Kim Lu, T7 Street Light RR, N3X1, Truong Dinh 8, T1 Gamuda, T2 Gamuda, N6 Phap Van Tu Hiep, Thinh Liet Commune People's Committee (Thinh Liet 3) of the investor Công ty Điện lực Thanh Trì with 2 bidding package.
27/07/2026 09:26
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the construction preparation phase of the project: "Overhauling and repairing RMU cabinets and cabinets to install RMU cabinets on the power grid managed by Thanh Tri Electricity Company in 2026" of the investor Công ty Điện lực Thanh Trì with 1 bidding package.
24/07/2026 15:20
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the construction preparation phase of the project: "Overhauling and repairing architectural and electrical technical infrastructure at transformer stations in Dinh Cong, Hoang Mai, Tuong Mai, Yen So, Linh Nam wards and Thanh Tri and Nam Phu communes in 2026" of the investor Công ty Điện lực Thanh Trì with 2 bidding package.
24/07/2026 15:16
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Thanh Trì publishes the plan Package 07SCL-2025: MBA 2025 is a work of the project: "A transformer at the scene" with 1 bidding package .
17/06/2025 09:44
Công ty Điện lực Thanh Trì publishes the plan Bidding package selection plan: Buy low -voltage cable and plastic wire for production in 2025 with 1 bidding package .
31/05/2025 14:56
Công ty Điện lực Thanh Trì publishes the plan Bidding package: "Consulting on the planning of technical-dt" works: Overhauling of open-type loads, outdoor cables of the medium voltage grid in Thanh Tri district in 2025 with 1 bidding package .
23/05/2025 15:02
Công ty Điện lực Thanh Trì publishes the plan Bidding for contractor package "07TV -SCL2025: Consulting on technical testing - estimates" with 1 bidding package .
23/05/2025 08:28
Công ty Điện lực Thanh Trì publishes the plan Labor protection and equipment, safety tools in 2025 with 1 bidding package .
21/05/2025 08:05
Công ty Điện lực Thanh Trì publishes the plan Project contractor selection plan: "Renovating and arranging, overcoming key points reducing the risk of incidents 471E1.26-482 E1.10 (serving the loading and loading of Dai Kim route to Vietnamese company TBA Long and Manh Quang 2) ” with 6 bidding package .
08/05/2025 14:16
Công ty Điện lực Thanh Trì publishes the plan Improving medium voltage grid arrangement, overcoming key points of Highway 472E1.10 with 6 bidding package .
08/05/2025 08:44
Công ty Điện lực Thanh Trì publishes the plan Install additional medium -voltage switching equipment with remote monitoring and remote control function on the medium voltage grid in Thanh Tri district in 2025 - phase 2 with 5 bidding package .
07/05/2025 23:17
Công ty Điện lực Thanh Trì publishes the plan Project contractor selection plan: "Renovating and arranging, overcoming key points reducing the risk of incidents 471E1.26-482 E1.10 (serving the loading and loading of Dai Kim route to Vietnamese company TBA Long and Manh Quang 2) ” with 4 bidding package .
29/04/2025 16:04
Công ty Điện lực Thanh Trì publishes the plan Science and Technology of Director of Project Investment: Building 01 new 22kV route from 110kV Dai Kim TBA to CT8A TBA - Dai Thanh Urban Area with 4 bidding package .
29/04/2025 15:46
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Procurement Package: Supply of 30 sets of Windows 11 Pro licenses for business operations. of the investor Công ty Điện lực Thanh Trì with 1 bidding package.
28/08/2026 16:59
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the project investment phase: Building 01 22kV output from 110kV Dai Kim TBA to create connection with 110kV Linh Dam TBA of the investor Công ty Điện lực Thanh Trì with 4 bidding package.
18/08/2026 09:12
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the investment preparation phase of the Project: Overhaul and architectural repair of substations in Dai Thanh, Ngoc Hoi, Nam Phu, Thanh Tri communes and Tuong Mai, Hoang Mai, Dinh Cong, Vinh Hung wards in 2026 of the investor Công ty Điện lực Thanh Trì with 2 bidding package.
09/08/2026 18:25
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan Package No. 08-KHVT26-CGTTRR: "Procurement of low voltage cables, cable ends and accessories for production" of the investor Công ty Điện lực Thanh Trì with 1 bidding package.
30/07/2026 15:53
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Preparation phase contractor selection plan
02 Projects: i) Overhauling and repairing RMU cabinets and cabinets installing RMU cabinets on the power grid managed by Thanh Tri Electricity Company in 2026 and ii) Overhauling and repairing electrical architecture and technical infrastructure at transformer stations in Dinh Cong, Hoang Mai, Tuong Mai, Yen So, Linh Nam wards and Thanh Tri and Nam Phu communes in 2026 of the investor Công ty Điện lực Thanh Trì with 1 bidding package.
28/07/2026 17:14
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the construction phase of the project: "Overhauling and replacing RMU cabinets at substations in the wards of Hoang Liet, Tuong Mai, Hoang Mai, Vinh Hung in 2026" of the investor Công ty Điện lực Thanh Trì with 2 bidding package.
28/07/2026 15:00
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the investment preparation phase of bidding package: HN5.578-2026: Consulting on preparing TKBVTC-TDT, for 03 projects
- Project: Overhauling and replacing Pilar cabinets on the low voltage grid of substations: CT3 Hoang Van Thu, Apartment 229 Vong Street, Chua Set 1, Tan Mai 18, Tan Mai 9, Tan Mai 8, Tan Mai 6 in 2026.
- Project: Overhaul and repair of electrical technical infrastructure at transformer stations in Dinh Cong, Hoang Liet, Hoang Mai, Linh Nam, Yen So, Vinh Hung wards in 2026.
- Project: Overhaul and repair of electrical technical infrastructure at transformer stations in Dai Thanh, Thanh Tri, Ngoc Hoi, Nam Phu communes in 2026. of the investor Công ty Điện lực Thanh Trì with 1 bidding package.
27/07/2026 17:16
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Repair of RMU cabinets at transformer stations: Thuy Linh 12, Giap Tu 1, T1 Ao Sao Urban Area, Hoang Van Thu 21, Minh Tri Garment, Viet Trung 2, Hong Nam Mechanical, Tran Phu Station, Den Lu 12, KHLCNT: Hoang Van Thu 18, Tan Mai 9, Giap Bat 7, Linh Nam 15, Mai Dong 26, Hoang Van Thu 13, Medicine County Nhan, Dinh Cong 10+13, Dinh Cong 19, Dinh Cong 26, CT11 Kim Van Kim Lu, T7 Street Light RR, N3X1, Truong Dinh 8, T1 Gamuda, T2 Gamuda, N6 Phap Van Tu Hiep, Thinh Liet Commune People's Committee (Thinh Liet 3) of the investor Công ty Điện lực Thanh Trì with 2 bidding package.
27/07/2026 09:26
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the construction preparation phase of the project: "Overhauling and repairing RMU cabinets and cabinets to install RMU cabinets on the power grid managed by Thanh Tri Electricity Company in 2026" of the investor Công ty Điện lực Thanh Trì with 1 bidding package.
24/07/2026 15:20
The Bid solicitor Công ty Điện lực Thanh Trì has posted the request Contractor selection plan for the construction preparation phase of the project: "Overhauling and repairing architectural and electrical technical infrastructure at transformer stations in Dinh Cong, Hoang Mai, Tuong Mai, Yen So, Linh Nam wards and Thanh Tri and Nam Phu communes in 2026" of the investor Công ty Điện lực Thanh Trì with 2 bidding package.
24/07/2026 15:16
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Điện lực Thanh Trì is the investor of 122 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Công ty Điện lực Thanh Trì is the owner of 759 contractor selection plan. In which, they self-invite 626 of contractor selection plan, other units invite bids of 133 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Công ty Điện lực Thanh Trì is the investor of 404 package, of which 347 package is self-invited, other units invite bid 57 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Điện lực Thanh Trì is the owner of 465 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Công ty Điện lực Thanh Trì has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Điện lực Thanh Trì is an investor with 209 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.