Bidder Selection Plan

Consulting on surveys, topographic measurements, preparation and verification of plans and estimates: Improving the environmental landscape around red mud lake phase 1

  Watching  
Project Contractor selection plan Bid award
Find: 08:32 19/01/2026
Contractor Selection Plan ID
PL2600012603-00
Publishing time
08:31 19/01/2026
Posting Status
Published
Contractor selection plan name
Consulting on surveys, topographic measurements, preparation and verification of plans and estimates: Improving the environmental landscape around red mud lake phase 1
Procurement name
Consulting on surveys, topographic measurements, preparation and verification of plans and estimates: Improving the environmental landscape around red mud lake phase 1
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Chi nhánh Tập đoàn Công nghiệp Than - Khoáng sản Việt Nam - Công ty Nhôm Lâm Đồng – TKV
Approval date
16/01/2026
Approval ID
651/QĐ-LDA
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 2
1.Tender package No 01: Consulting on surveys, topographic measurements, planning and estimates: Improving the environmental landscape around red mud lake phase 1
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Survey, measure, draw up plans, and propose solutions to implement: Improve the environmental landscape around red mud lake phase 1 in accordance with regulations and standards applicable to the project, ensuring consulting products (explanations, drawings, estimates) are consistent with the current status and regulations of current law. Based on the completed plan and estimate prepared by the consulting unit, LDA carries out appraisal procedures and submits to TKV for approval as a basis for implementing the next steps; - Explanation of the outline: includes the contents of measurements, calculations and clarification of technical options, comparison of economic - technical indicators, checking of data and serving as a basis for providing solutions to improve the environmental landscape around red mud lake phase 1...; - Explanations, drawings, and estimates must be bound into files according to a unified framework, cataloged, numbered, and symbolized for long-term reference and preservation; - Estimated implementation of the Plan: Improving the environmental landscape around red mud lake phase 1 must be prepared in accordance with actual conditions, design, regimes and policies regulating the establishment and management of construction repair costs and existing price levels. - Guaranteed quality and savings.
Capital source details
Production costs of LDA in 2026 (Regular environmental costs)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Tender package No 02: Consulting on verifying plans - estimates Improving the environmental landscape around red mud lake phase 1
Tender/ Prequalification Notice ID
Contract execution period
25 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Verify the suitability of the plan - estimate compared to the plan/planning: Conformity of the basic design with the detailed construction planning; total approved premises; The suitability of the basic design with the location of the construction site, the ability to connect to the area's technical infrastructure; - Verify compliance with applicable standards and technical regulations; legal regulations on using construction materials for projects; - Evaluate the compatibility of construction design solutions with the construction's utility, construction safety level and ensure the safety of neighboring constructions; - Verify compliance with regulations on environmental protection, fire and explosion prevention and fighting; - Request to complete project and estimate documents; - Verify the compatibility between the estimated volume and the construction drawing design volume; - Verify the correctness of applying economic - technical norms, cost norms, rate norms, unit prices as well as applying norms, unit prices, policies and cost items in the estimate according to regulations.
Capital source details
Production costs of LDA in 2026 (Regular environmental costs)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Consulting on surveys, topographic measurements, preparation and verification of plans and estimates: Improving the environmental landscape around red mud lake phase 1". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Consulting on surveys, topographic measurements, preparation and verification of plans and estimates: Improving the environmental landscape around red mud lake phase 1" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 13

You did not use the site, Click here to remain logged. Timeout: 60 second