Bidder Selection Plan

Contractor selection plan for project preparation phase Project: Renovating and resolving overloaded power grid in Go City Electricity area Cong, Go Cong Dong

  Watching  
Project Contractor selection plan Bid award
Find: 09:34 28/09/2024
Contractor Selection Plan ID
PL2400214331-00
Publishing time
09:34 28/09/2024
Posting Status
Published
Contractor selection plan name
Contractor selection plan for project preparation phase Project: Renovating and resolving overloaded power grid in Go City Electricity area Cong, Go Cong Dong
Investment objective
Currently, the ratio of single-phase medium-low voltage grid belongs to the financial sector Tien Giang Power Company's assets account for a large proportion, causing many disadvantages operational management; Specifically, by August 2024, the single-phase medium voltage power grid accounts for 53.5% of the total length of the medium voltage grid, the single phase low voltage grid accounts for it 91.5% of the total length of the low voltage grid. Investing in projects to gradually increase upgrade the 1-phase medium-low voltage power grid to 3-phase; Prevent the risk of full load or overload of the grid electricity; Solve pressure drop, reduce power loss,
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400055293-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2 Years
Location
Authority that issues the decision
Công ty Điện lực Tiền Giang
Approval date
26/09/2024
Approval ID
2200/QĐPCTG
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Consulting on surveys to prepare construction investment feasibility reports, prepare construction investment feasibility reports, surveys to prepare construction investment plans, prepare construction investment design documents. Renovate and resolve overloaded power grids in Go Cong and Go Cong Dong City Electricity areas.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
SPC's KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
2.Consulting on verification of construction investment feasibility study report, construction drawing design - cost estimate for renovation works and resolving overloading of the power grid in Go Cong and Go Cong Dong City Electricity areas
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
KHCB's SPC link commercial loan agreement commercial
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
3.Consulting Director close to work survey Economic report DTXD, Thiet exam drawing design Cong – Du Project to renovate and resolve overloaded power grids in Go Cong and Go Cong Dong City Electricity areas
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
KHCB's SPC
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for project preparation phase Project: Renovating and resolving overloaded power grid in Go City Electricity area Cong, Go Cong Dong". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for project preparation phase Project: Renovating and resolving overloaded power grid in Go City Electricity area Cong, Go Cong Dong" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second