Contractor selection plan for the package under the Economic and Technical Report on Construction Investment Project Construction of Ban Le - Phan Thuong residential area (Opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, commune Nghia Loi, Nghia Lo town (phase 2)
Contractor selection plan for the package under the Economic and Technical Report on Construction Investment Project Construction of Ban Le - Phan Thuong residential area (Opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, commune Nghia Loi, Nghia Lo town (phase 2)
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QDPD ke hoach LCNT.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 9
1.Consulting on appraisal of construction equipment for construction of Ban Le - Phan Thuong residential area (Opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, Nghia Loi commune, Nghia Lo town (phase 2)
2.Consulting on preparing bidding documents, evaluating bidding documents for the construction of Ban Le - Phan Thuong residential area (opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, Nghia Loi commune, Nghia Lo town (phase 2 )
3.Construction and supply and installation of construction equipment Construction of Ban Le - Phan Thuong residential area (Opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, Nghia Loi commune, Nghia Lo town (Phase 2)
4.Supervision of construction and supply and installation of construction equipment for the construction of Ban Le - Phan Thuong residential area (opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, Nghia Loi commune, town Nghia Lo (phase 2)
5.Construction insurance Construction of Ban Le - Phan Thuong residential area (Opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, Nghia Loi commune, Nghia Lo town (phase 2)
6.Environmental impact assessment of the construction of Ban Le - Phan Thuong residential area (Opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, Nghia Loi commune, Nghia Lo town (phase 2)
7.Measuring, preparing land allocation documents, changing the purpose of construction of Ban Le - Phan Thuong residential area (Opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, Nghia Loi commune, town Nghia Lo (phase 2)
8.Measuring and mapping the plot and installing piles to divide the plot details of the construction of Ban Le - Phan Thuong residential area (opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, Nghia Loi commune, town Nghia Lo (phase 2)
9.Determining the specific land price for auction of the construction of Ban Le - Phan Thuong residential area (opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, Nghia Loi commune, Nghia Lo town (phase 2)
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for the package under the Economic and Technical Report on Construction Investment Project Construction of Ban Le - Phan Thuong residential area (Opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, commune Nghia Loi, Nghia Lo town (phase 2)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for the package under the Economic and Technical Report on Construction Investment Project Construction of Ban Le - Phan Thuong residential area (Opposite Hoa Sen corrugated iron, National Highway 32 bypass), Trung Tam ward, commune Nghia Loi, Nghia Lo town (phase 2)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.