Bidder Selection Plan

Included in the estimate: Costs of implementing the Project on Strengthening drug prevention and control for workers in industrial parks and export processing zones in 2025

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 16:03 04/11/2025
Contractor Selection Plan ID
PL2500279557-00
Publishing time
16:02 04/11/2025
Posting Status
Published
Contractor selection plan name
Included in the estimate: Costs of implementing the Project on Strengthening drug prevention and control for workers in industrial parks and export processing zones in 2025
Procurement name
Cost of implementing the Project on Strengthening drug prevention and control for workers in industrial parks and export processing zones in 2025
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Cơ quan Tổng Liên đoàn Lao động Việt Nam
Approval date
03/11/2025
Approval ID
34 /QĐ-TTQLDA
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.Tender package No 01: Design, print, and distribute propaganda materials on drug prevention and combat
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Designed, printed, and distributed 2,500 brochures and 30,000 leaflets promoting drug prevention and combat to provinces and cities nationwide
Capital source details
Government budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Tender package No 02: Design and print messages about drug prevention and control on everyday items
Tender/ Prequalification Notice ID
Contract execution period
5 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Design and print messages about drug prevention and control on: 1000 canvas bags, 1000 T-shirts, 3000 key chains, 1000 raincoats, 1000 jackets
Capital source details
Government budget
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Tender package No 03: Organizing conferences and seminars on drug prevention and combat for workers in Nghe An, Bac Ninh, and Thanh Hoa provinces
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing services and equipment to organize: 02 seminars, 03 training conferences in 03 provinces: Nghe An, Thanh Hoa, Bac Ninh
Capital source details
Government budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Tender package No 04: Production of digital media products to propagate the dangers of drugs
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Develop scripts, content, images, and complete production organization: 04 videos, 1 MV about drug prevention and control.
Capital source details
Government budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Included in the estimate: Costs of implementing the Project on Strengthening drug prevention and control for workers in industrial parks and export processing zones in 2025". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Included in the estimate: Costs of implementing the Project on Strengthening drug prevention and control for workers in industrial parks and export processing zones in 2025" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 9

You did not use the site, Click here to remain logged. Timeout: 60 second