Bidder Selection Plan

KHLCNT phase of project investment preparation: Completing IT system and improving food safety and safety capacity for BASA Electrical System 1 Dak Lak Power Company in 2026

  Watching  
Project Contractor selection plan Bid award
Find: 14:11 22/08/2025
Contractor Selection Plan ID
PL2500196254-00
Publishing time
14:10 22/08/2025
Posting Status
Published
Contractor selection plan name
KHLCNT phase of project investment preparation: Completing IT system and improving food safety and safety capacity for BASA Electrical System 1 Dak Lak Power Company in 2026
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500053365-00
Spending Category
Investment and Development Spending
Authority that issues the decision
CÔNG TY ĐIỆN LỰC ĐẮK LẮK - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN TRUNG
Approval date
21/08/2025
Approval ID
2562/QĐ-ĐLPC
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Package 01/TV-CNTT TTĐK 26: Consulting surveys and setting up the construction management.
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Surveying and setting up the construction management
Capital source details
Basic depreciation and commercial loans
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Is different
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "KHLCNT phase of project investment preparation: Completing IT system and improving food safety and safety capacity for BASA Electrical System 1 Dak Lak Power Company in 2026". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "KHLCNT phase of project investment preparation: Completing IT system and improving food safety and safety capacity for BASA Electrical System 1 Dak Lak Power Company in 2026" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 12

You did not use the site, Click here to remain logged. Timeout: 60 second