Bidder Selection Plan

Package 02: Construction of items: SCL replaces poor quality insulation on branches: NR Substation No. 3 Hung Nhan, NR Substation No. 4 Hung Nhan, NR Substation No. 5 Hung Nhan, NR Substation No. 4 Hung Chau, NR TBA No. 3 Hung Phu, NR Substation No. 3 Hung Lam, NR Substation No. 4 Hung Lam, NR Substation No. 3 Hung Tien, NR Substation No. 5 Hung Thinh, NR Substation No. 6 Hung Thinh, line 377E15.7 and NR Substation No. 5 Nam Cat , NR Substation No. 6 Nam Cat, NR Substation No. 1 Hung Thong, NR Substation No. 3 Hung Tan, line 377E15.1; Repairing 0.4kV transmission line after substation No. 1+2+3+4+5+6 Dong Son in Do commune

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 10:57 12/01/2022
Contractor selection plan ID
20220122336-00
Publication date
10:52 12/01/2022
Publication status
Actual notification
Contractor selection plan name
Package 02: Construction of items: SCL replaces poor quality insulation on branches: NR Substation No. 3 Hung Nhan, NR Substation No. 4 Hung Nhan, NR Substation No. 5 Hung Nhan, NR Substation No. 4 Hung Chau, NR TBA No. 3 Hung Phu, NR Substation No. 3 Hung Lam, NR Substation No. 4 Hung Lam, NR Substation No. 3 Hung Tien, NR Substation No. 5 Hung Thinh, NR Substation No. 6 Hung Thinh, line 377E15.7 and NR Substation No. 5 Nam Cat , NR Substation No. 6 Nam Cat, NR Substation No. 1 Hung Thong, NR Substation No. 3 Hung Tan, line 377E15.1; Repairing 0.4kV transmission line after substation No. 1+2+3+4+5+6 Dong Son in Do commune
Bid Solicitor
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Mandatory spending activities
Location
Approval date
11/01/2022
Approval ID
69/QĐ-PCNA
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

List of Bid:
Number of packages: 1
1.Package 02: Construction of items: SCL replaces poor quality insulation on branches: NR Substation No. 3 Hung Nhan, NR Substation No. 4 Hung Nhan, NR Substation No. 5 Hung Nhan, NR Substation No. 4 Hung Chau, NR TBA No. 3 Hung Phu, NR Substation No. 3 Hung Lam, NR Substation No. 4 Hung Lam, NR Substation No. 3 Hung Tien, NR Substation No. 5 Hung Thinh, NR Substation No. 6 Hung Thinh, line 377E15.7 and NR Substation No. 5 Nam Cat , NR Substation No. 6 Nam Cat, NR Substation No. 1 Hung Thong, NR Substation No. 3 Hung Tan, line 377E15.1; Repairing 0.4kV transmission line after substation No. 1+2+3+4+5+6 Dong Son in Do commune
Tender/ Prequalification Notice ID
Contract Period
90 days
Domestic/ International
International
Bidding method
Online
Fields
Civil Works
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Major repair in 2022 EVN NPC-Nghe An Electricity Company
Contractor Selection Type
Open bidding, domestic without pre-qualification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2022
Contract Type
All in one
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Package 02: Construction of items: SCL replaces poor quality insulation on branches: NR Substation No. 3 Hung Nhan, NR Substation No. 4 Hung Nhan, NR Substation No. 5 Hung Nhan, NR Substation No. 4 Hung Chau, NR TBA No. 3 Hung Phu, NR Substation No. 3 Hung Lam, NR Substation No. 4 Hung Lam, NR Substation No. 3 Hung Tien, NR Substation No. 5 Hung Thinh, NR Substation No. 6 Hung Thinh, line 377E15.7 and NR Substation No. 5 Nam Cat , NR Substation No. 6 Nam Cat, NR Substation No. 1 Hung Thong, NR Substation No. 3 Hung Tan, line 377E15.1; Repairing 0.4kV transmission line after substation No. 1+2+3+4+5+6 Dong Son in Do commune". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Package 02: Construction of items: SCL replaces poor quality insulation on branches: NR Substation No. 3 Hung Nhan, NR Substation No. 4 Hung Nhan, NR Substation No. 5 Hung Nhan, NR Substation No. 4 Hung Chau, NR TBA No. 3 Hung Phu, NR Substation No. 3 Hung Lam, NR Substation No. 4 Hung Lam, NR Substation No. 3 Hung Tien, NR Substation No. 5 Hung Thinh, NR Substation No. 6 Hung Thinh, line 377E15.7 and NR Substation No. 5 Nam Cat , NR Substation No. 6 Nam Cat, NR Substation No. 1 Hung Thong, NR Substation No. 3 Hung Tan, line 377E15.1; Repairing 0.4kV transmission line after substation No. 1+2+3+4+5+6 Dong Son in Do commune" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.
Views: 24

You did not use the site, Click here to remain logged. Timeout: 60 second