Investment in the project of reinforcing the embankment of Nuoc Trong canal (the section from the electric pole towards the Ba Bong sewer), Binh Chieu ward, ensuring that the embankment section is continuous and synchronous; At the same time, it contributes to preventing high tides and flooding, limiting pollution that produces pathogens. Create conditions to help people have a clean living environment and peace of mind during the production process, contributing to promoting economic development
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QĐ KHLCNT_ NUOC TRONG.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 6
1.Bidding package No. 1: Consulting on setting up bidding documents and evaluating bids for construction and installation bidding packages
2.Bidding package No. 2: Consulting on appraisal of bidding documents and appraisal of contractor selection results for Construction and installation packages
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Reinforcing the embankment of Nuoc Trong canal (section from electric pole towards U Ba Bong sewer), Binh Chieu ward". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Reinforcing the embankment of Nuoc Trong canal (section from electric pole towards U Ba Bong sewer), Binh Chieu ward" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.