Bidder Selection Plan

Repair damage to the foundation, road surface and traffic safety system Km579+900 - Km580+176; Km582+900 - Km583+760; Km591+00 - Km591+370; Km594+366 - Km595+00; Km596+550 - Km597+750; Km617+00 - Km617+400; Km617+450 - Km618+00. Repairing longitudinal trenches at section Km613+257 - Km613+300 (T); Km624+056 - Km624+189 (T); Km627+919 - Km627+969 (W) Ho Chi Minh road, Thanh Hoa province

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 09:44 20/02/2024
Contractor Selection Plan ID
PL2400020140-00
Publishing time
09:42 20/02/2024
Posting Status
Published
Contractor selection plan name
Repair damage to the foundation, road surface and traffic safety system Km579+900 - Km580+176; Km582+900 - Km583+760; Km591+00 - Km591+370; Km594+366 - Km595+00; Km596+550 - Km597+750; Km617+00 - Km617+400; Km617+450 - Km618+00. Repairing longitudinal trenches at section Km613+257 - Km613+300 (T); Km624+056 - Km624+189 (T); Km627+919 - Km627+969 (W) Ho Chi Minh road, Thanh Hoa province
Procurement name
Repair damage to the foundation, road surface and traffic safety system Km579+900 - Km580+176; Km582+900 - Km583+760; Km591+00 - Km591+370; Km594+366 - Km595+00; Km596+550 - Km597+750; Km617+00 - Km617+400; Km617+450 - Km618+00. Repairing longitudinal trenches at section Km613+257 - Km613+300 (T); Km624+056 - Km624+189 (T); Km627+919 - Km627+969 (W) Ho Chi Minh road, Thanh Hoa province
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Location
Authority that issues the decision
Cục Đường bộ Việt Nam
Approval date
19/02/2024
Approval ID
1160/QĐ-CĐBVN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Tender package No 01: Repairing works
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
State budget (non-business funding for road economic activities)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
February 2024
Type of contract
Fixed unit price
Prequalification
No
Location
Thường Xuân District, Thanh Hoá
2.Package 02: Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
State budget (non-business funding for road economic activities)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
February 2024
Type of contract
All in One
Prequalification
No
Location
Thường Xuân District, Thanh Hoá
3.Package 03: Project Management Consulting
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
State budget (non-business funding for road economic activities)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
February 2024
Type of contract
All in One
Prequalification
No
Location
Như Thanh District, Thanh Hoá

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Repair damage to the foundation, road surface and traffic safety system Km579+900 - Km580+176; Km582+900 - Km583+760; Km591+00 - Km591+370; Km594+366 - Km595+00; Km596+550 - Km597+750; Km617+00 - Km617+400; Km617+450 - Km618+00. Repairing longitudinal trenches at section Km613+257 - Km613+300 (T); Km624+056 - Km624+189 (T); Km627+919 - Km627+969 (W) Ho Chi Minh road, Thanh Hoa province". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Repair damage to the foundation, road surface and traffic safety system Km579+900 - Km580+176; Km582+900 - Km583+760; Km591+00 - Km591+370; Km594+366 - Km595+00; Km596+550 - Km597+750; Km617+00 - Km617+400; Km617+450 - Km618+00. Repairing longitudinal trenches at section Km613+257 - Km613+300 (T); Km624+056 - Km624+189 (T); Km627+919 - Km627+969 (W) Ho Chi Minh road, Thanh Hoa province" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 10

You did not use the site, Click here to remain logged. Timeout: 60 second