Bidder Selection Plan

Replace signals on Red River routes (section from old Tan De ferry km74 to Phu Khe wharf km133); Boiled (section from Quy Cao to N3 Cua Luoc), Tra Ly, Hoa; to replace signals on the routes of Chanh river, Luong Ha Long - Yen Hung, Hon Dua - Cua Do, Luong Van Don - Co To, Va Ray Ngoai branch, Luong Sau Dong - Tien Yen, Tai Xa - Mui Chua, Luong Mong Cai - Van Don - Cam Pha, Mong Cai River, Bai Tho, Luong Bai Tu Long - Lach Sau (section from Hon Mot to Hon Dua), Cam Pha Lach - Ha Long, Luong Tai Xa - Mui Chua;

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 09:05 24/08/2021
Contractor selection plan ID
20210860432-00
Publication date
08:45 24/08/2021
Publication status
Actual notification
Contractor selection plan name
Replace signals on Red River routes (section from old Tan De ferry km74 to Phu Khe wharf km133); Boiled (section from Quy Cao to N3 Cua Luoc), Tra Ly, Hoa; to replace signals on the routes of Chanh river, Luong Ha Long - Yen Hung, Hon Dua - Cua Do, Luong Van Don - Co To, Va Ray Ngoai branch, Luong Sau Dong - Tien Yen, Tai Xa - Mui Chua, Luong Mong Cai - Van Don - Cam Pha, Mong Cai River, Bai Tho, Luong Bai Tu Long - Lach Sau (section from Hon Mot to Hon Dua), Cam Pha Lach - Ha Long, Luong Tai Xa - Mui Chua;
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Mandatory spending activities
QD status
There has been a decision to approve the investment project
Location
Approval date
23/08/2021
Approval ID
763/QĐ-CĐTNĐ ngày 23/8/2021
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

List of Bid:
Number of packages: 4
1.XL.SXBH.MB-04: Replace signals on Red River routes (section from old Tan De ferry km 74 to Phu Khe wharf km133), Luoc (section from Quy Cao to N3 Cua Luoc), Tra Ly, Hoa ; to replace signals on the routes of Chanh river, Luong Ha Long - Yen Hung, Hon Dua - Cua Do, Luong Van Don - Co To, Va Ray Ngoai branch, Luong Sau Dong - Tien Yen, Tai Xa - Mui Chua, Luong Mong Cai - Van Don - Cam Pha, Mong Cai River, Bai Tho, Luong Bai Tu Long - Lach Sau (section from Islet Mot to Hon Dua), Cam Pha Lach - Ha Long, Luong Ta
Tender/ Prequalification Notice ID
Contract Period
60 days
Domestic/ International
International
Bidding method
Online
Fields
Civil Works
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Inland waterway economic career in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2021
Contract Type
All in one
Prequalification
No
Location
2.TVDT.SXBH.MB-04: Consulting to prepare bidding documents, evaluating bid packages: Replace signal on Red River routes (section from old Tan De ferry km 74 to Phu Khe wharf km133) , Boiled (section from Quy Cao to N3 Cua Luoc), Tra Ly, Hoa; to replace signals on the routes of Chanh river, Luong Ha Long - Yen Hung, Hon Dua - Cua Do, Luong Van Don - Co To, Va Ray Ngoai branch, Luong Sau Dong - Tien Yen, Tai Xa - Mui Chua, Luong Mong Cai - Van Don - Cam Pha, Mong Cai River, Bai Tho, Luong Bai Tu Long - Lach Sau (
Tender/ Prequalification Notice ID
Contract Period
45 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Inland waterway economic career in 2021
Contractor Selection Type
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2021
Contract Type
All in one
Prequalification
No
Location
3.TVGS.SXBH.MB-04: Construction supervision consultancy contract package: Replace signals on Red River routes (section from old Tan De ferry, km 74 to Phu Khe wharf km133), Luoc (section from Quy Cao to N3 Cua Luoc), Tra Ly, Hoa; to replace signals on the routes of Chanh river, Luong Ha Long - Yen Hung, Hon Dua - Cua Do, Luong Van Don - Co To, Va Ray Ngoai branch, Luong Sau Dong - Tien Yen, Tai Xa - Mui Chua, Luong Mong Cai - Van Don - Cam Pha, Mong Cai River, Bai Tho, Bai Tu Long Luong - Lach Sau (section from Islet Mot to Islet D)
Tender/ Prequalification Notice ID
Contract Period
60 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Inland waterway economic career in 2021
Contractor Selection Type
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2021
Contract Type
All in one
Prequalification
No
Location
4.TVKT.SXBH.MB-04: Construction audit: Replace signals on Red River routes (section from old Tan De ferry km 74 to Phu Khe wharf km133), Luoc (section from Quy Cao to N3 Cua Luoc) , Tra Ly, Chemistry; to replace signals on the routes of Chanh river, Luong Ha Long - Yen Hung, Hon Dua - Cua Do, Luong Van Don - Co To, Va Ray Ngoai branch, Luong Sau Dong - Tien Yen, Tai Xa - Mui Chua, Luong Mong Cai - Van Don - Cam Pha, Mong Cai River, Bai Tho, Luong Bai Tu Long - Lach Sau (section from Islet Mot to Islet), Lach Cam
Tender/ Prequalification Notice ID
Contract Period
7 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Inland waterway economic career in 2021
Contractor Selection Type
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2021
Contract Type
All in one
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Replace signals on Red River routes (section from old Tan De ferry km74 to Phu Khe wharf km133); Boiled (section from Quy Cao to N3 Cua Luoc), Tra Ly, Hoa; to replace signals on the routes of Chanh river, Luong Ha Long - Yen Hung, Hon Dua - Cua Do, Luong Van Don - Co To, Va Ray Ngoai branch, Luong Sau Dong - Tien Yen, Tai Xa - Mui Chua, Luong Mong Cai - Van Don - Cam Pha, Mong Cai River, Bai Tho, Luong Bai Tu Long - Lach Sau (section from Hon Mot to Hon Dua), Cam Pha Lach - Ha Long, Luong Tai Xa - Mui Chua;". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Replace signals on Red River routes (section from old Tan De ferry km74 to Phu Khe wharf km133); Boiled (section from Quy Cao to N3 Cua Luoc), Tra Ly, Hoa; to replace signals on the routes of Chanh river, Luong Ha Long - Yen Hung, Hon Dua - Cua Do, Luong Van Don - Co To, Va Ray Ngoai branch, Luong Sau Dong - Tien Yen, Tai Xa - Mui Chua, Luong Mong Cai - Van Don - Cam Pha, Mong Cai River, Bai Tho, Luong Bai Tu Long - Lach Sau (section from Hon Mot to Hon Dua), Cam Pha Lach - Ha Long, Luong Tai Xa - Mui Chua;" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.
Views: 30

You did not use the site, Click here to remain logged. Timeout: 60 second