Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng as follows:
- Has relationships with 16 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 13 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 1 packages.
- Announced the results of 18 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 15 packages with results that do not have tender notice or prequalification notice.
- There are 12 packages that have not fully posted the contractor selection results. Of these 12 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 20.00%, Construction 40.00%, Consultancy 40.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,591,246,874,525 VND, of which the total winning bid value is: 1,485,846,223,658 VND.
- The savings rate is: 6.62%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng as follows:
- Has relationships with 16 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 20.00%, Construction 40.00%, Consulting 40.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,591,246,874,525 VND, in which the total winning value is: 1,485,846,223,658 VND.
- The savings rate is: 6.62%.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the request Contractor selection plan (additional) Construction Investment Project of Rainwater Drainage Component, and Wastewater Drainage Component of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng with 1 bidding package.
03/04/2019 16:09
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Surveying and surveying consultancy, making cadastral measurements of the extended T route under package C of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
28/09/2018 15:55
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the request Plan to select contractor (additional) Gia Minh solid waste treatment complex construction investment project of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng with 1 bidding package.
23/08/2018 16:42
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Auditing and finalizing works using residual project capital of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
26/03/2018 09:52
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Procurement of vehicles and equipment for solid waste and hospital waste collection (package D) of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
11/10/2017 11:00
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Renovating and upgrading the road connecting Gia Minh Solid Waste Treatment Complex to Hai Phong Cement Plant (Package G) of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
09/08/2017 11:58
Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted Tender Notice Auditing and finalizing works using residual project capital of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng with the form Open bidding (Only select domestic contractors).
07/08/2017 11:29
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Consulting on making the 3rd adjusted investment project of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
19/07/2017 15:49
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Consulting to verify the total investment adjusted for the 3rd time of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
- Winning bidder: Viện Kinh tế xây dựng
18/07/2017 08:53
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Prepare and report on sociological assessment of resettled households Hai Phong stormwater drainage, wastewater and solid waste management project, phase I of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
26/05/2017 09:17
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng publishes the plan Contractor selection plan (additional) Construction Investment Project of Rainwater Drainage Component, and Wastewater Drainage Component with 1 bidding package .
03/04/2019 16:09
Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng announced the results of the bid package Surveying and surveying consultancy, making cadastral measurements of the extended T route under package C .
- Winning bidder: Trung tâm Kỹ thuật Tài nguyên - Môi trường
28/09/2018 15:55
Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng publishes the plan Plan to select contractor (additional) Gia Minh solid waste treatment complex construction investment project with 1 bidding package .
23/08/2018 16:42
Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng announced the results of the bid package Auditing and finalizing works using residual project capital .
- Winning bidder: Công ty TNHH Kiểm toán An VIệt
26/03/2018 09:52
Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng announced the results of the bid package Procurement of vehicles and equipment for solid waste and hospital waste collection (package D) .
- Winning bidder: CÔNG TY CỔ PHẦN XUẤT NHẬP KHẨU AN PHÚ THÀNH, CÔNG TY CỔ PHẦN Ô TÔ AN THÁI CONECO
11/10/2017 11:00
Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng announced the results of the bid package Renovating and upgrading the road connecting Gia Minh Solid Waste Treatment Complex to Hai Phong Cement Plant (Package G) .
09/08/2017 11:58
Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng publishes Tender Notice Auditing and finalizing works using residual project capital in the form Open bidding (Only select domestic contractors) .
07/08/2017 11:29
Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng announced the results of the bid package Consulting on making the 3rd adjusted investment project .
- Winning bidder: Công ty Cổ phần Đầu tư, công nghệ môi trường và Hạ tầng kỹ thuật Lạc Việt
19/07/2017 15:49
Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng announced the results of the bid package Consulting to verify the total investment adjusted for the 3rd time .
- Winning bidder: Viện Kinh tế xây dựng
18/07/2017 08:53
Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng announced the results of the bid package Prepare and report on sociological assessment of resettled households Hai Phong stormwater drainage, wastewater and solid waste management project, phase I .
- Winning bidder: Công ty Cổ phần Tư vấn Thiết kế và Giám định xây dựng Sao Việt
26/05/2017 09:17
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the request Contractor selection plan (additional) Construction Investment Project of Rainwater Drainage Component, and Wastewater Drainage Component of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng with 1 bidding package.
03/04/2019 16:09
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Surveying and surveying consultancy, making cadastral measurements of the extended T route under package C of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
28/09/2018 15:55
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the request Plan to select contractor (additional) Gia Minh solid waste treatment complex construction investment project of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng with 1 bidding package.
23/08/2018 16:42
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Auditing and finalizing works using residual project capital of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
26/03/2018 09:52
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Procurement of vehicles and equipment for solid waste and hospital waste collection (package D) of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
11/10/2017 11:00
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Renovating and upgrading the road connecting Gia Minh Solid Waste Treatment Complex to Hai Phong Cement Plant (Package G) of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
09/08/2017 11:58
Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted Tender Notice Auditing and finalizing works using residual project capital of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng with the form Open bidding (Only select domestic contractors).
07/08/2017 11:29
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Consulting on making the 3rd adjusted investment project of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
19/07/2017 15:49
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Consulting to verify the total investment adjusted for the 3rd time of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
- Winning bidder: Viện Kinh tế xây dựng
18/07/2017 08:53
The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted the results of the bidding package Prepare and report on sociological assessment of resettled households Hai Phong stormwater drainage, wastewater and solid waste management project, phase I of the investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng.
26/05/2017 09:17
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted 10 of the contractor selection plan, which contains 13 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted 5 Tender Notice in the 5 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has posted 18 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 18 package, canceled the bid 0 package (among the bidding packages above).
- There are 15 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng has a relationship with 16 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý Dự án Cải thiện điều kiện vệ sinh môi trường Hải Phòng is an investor with 16 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code