Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Khu quản lý giao thông đô thị số 3 as follows:
- Has relationships with 111 contractor.
- Announced 116 investment development project, of which 8 projects have not yet announced the prequalification documents.
- Announced 476 contractor selection plans with a total of 1449 bidding packages, of which 347 prequalification documents have not found the investment project.
- Has invited bids for 136 packages (with 140 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 399 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 327 packages with results that do not have tender notice or prequalification notice.
- There are 1185 packages that have not fully posted the contractor selection results. Of these 1173 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0.71%, Construction 77.14%, Consultancy 9.29%, Non-consultancy 12.86%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,266,281,960,647 VND, of which the total winning bid value is: 1,257,109,783,978 VND.
- The savings rate is: 0.72%.
Data analysis results of DauThau.info software for bid solicitors Khu quản lý giao thông đô thị số 3 as follows:
- Has relationships with 111 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0.71%, Construction 77.14%, Consulting 9.29%, Non-consulting 12.86%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,266,281,960,647 VND, in which the total winning value is: 1,257,109,783,978 VND.
- The savings rate is: 0.72%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 116 investment and development projects.
- As the owner of 500 Contractor selection plan in which 474 Contractor selection plan is self-published, and 26 Contractor selection plan is posted by other units.
- Being the investor of 128 bidding packages in which 92 packages are self-invited, and 36 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Khu quản lý giao thông đô thị số 3 Posted Development Investment Project Repairing National Highway 22 (road No. 26 - Le Minh Nhut).
26/08/2019 07:00
Khu quản lý giao thông đô thị số 3 Posted Development Investment Project Repairing National Highway 22 (Trung Viet to Cay Trom My Khanh), the direction of the city to Tay Ninh.
26/08/2019 07:00
The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor Khu quản lý giao thông đô thị số 3.
05/08/2019 16:20
The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor Khu quản lý giao thông đô thị số 3.
- Winning bidder: Công ty TNHH Thương mại Dịch vụ Xây dựng Công Nghệ Mới
05/08/2019 16:19
The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted the request Install traffic lights to warn before traffic intersections in District 12, Go Vap; Hoc Mon district, Cu Chi of the investor Khu quản lý giao thông đô thị số 3 with 3 bidding package.
29/07/2019 15:03
Khu quản lý giao thông đô thị số 3 Posted Development Investment Project Install traffic lights to warn before traffic intersections in District 12, Go Vap; Hoc Mon district, Cu Chi.
29/07/2019 14:14
The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted the request Repairing National Highway 22 (road No. 26 - Le Minh Nhut) of the investor Khu quản lý giao thông đô thị số 3 with 3 bidding package.
22/07/2019 16:39
The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted the request Repairing National Highway 22 (Trung Viet to Cay Trom My Khanh), the direction of the city to Tay Ninh of the investor Khu quản lý giao thông đô thị số 3 with 3 bidding package.
22/07/2019 16:39
Khu quản lý giao thông đô thị số 3 Posted Development Investment Project Repairing National Highway 22 (road No. 26 - Le Minh Nhut).
22/07/2019 16:16
Khu quản lý giao thông đô thị số 3 Posted Development Investment Project Repairing National Highway 22 (Trung Viet to Cay Trom My Khanh), the direction of the city to Tay Ninh.
22/07/2019 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
Khu quản lý giao thông đô thị số 3 announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: Công ty TNHH Thương mại Dịch vụ Xây dựng Công Nghệ Mới
05/08/2019 16:20
Khu quản lý giao thông đô thị số 3 announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: Công ty TNHH Thương mại Dịch vụ Xây dựng Công Nghệ Mới
05/08/2019 16:19
Khu quản lý giao thông đô thị số 3 publishes the plan Install traffic lights to warn before traffic intersections in District 12, Go Vap; Hoc Mon district, Cu Chi with 3 bidding package .
29/07/2019 15:03
Khu quản lý giao thông đô thị số 3 publishes the plan Repairing National Highway 22 (road No. 26 - Le Minh Nhut) with 3 bidding package .
22/07/2019 16:39
Khu quản lý giao thông đô thị số 3 publishes the plan Repairing National Highway 22 (Trung Viet to Cay Trom My Khanh), the direction of the city to Tay Ninh with 3 bidding package .
22/07/2019 16:39
Khu quản lý giao thông đô thị số 3 announced the results of the bid package Consultancy of construction supervision and equipment installation .
- Winning bidder: CÔNG TY TNHH KỸ THUẬT XÂY DỰNG ĐIỆN NAM CƯỜNG
25/06/2019 13:39
Khu quản lý giao thông đô thị số 3 announced the results of the bid package Consultancy on survey and preparation of financial statements .
- Winning bidder: CÔNG TY CỔ PHẦN LAS 92, CÔNG TY CỔ PHẦN TƯ VẤN KIỂM ĐỊNH CÔNG TRÌNH TOÀN TRÍ
21/06/2019 16:50
Khu quản lý giao thông đô thị số 3 announced the results of the bid package Construction: Relocating the electrical system .
- Winning bidder: CONG TY TNHH DAU TU XAY DUNG VA PHAT TRIEN THUONG MAI HOANG NGUYEN
21/06/2019 16:20
Khu quản lý giao thông đô thị số 3 announced the results of the bid package Consulting, surveying and making plans for relocation of the power system (Survey, design and construction) .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG CÔNG TRÌNH ĐIỆN THƯƠNG MẠI NGUYÊN PHÚ
21/06/2019 16:17
Khu quản lý giao thông đô thị số 3 announced the results of the bid package Consulting, surveying and preparing economic - technical reports .
- Winning bidder: Công ty cổ phần thiết kế và xây lắp Trường Sơn
21/06/2019 15:51
The data sheet has been partially hidden, to see the full information please Login or Register
Khu quản lý giao thông đô thị số 3 Posted Development Investment Project Repairing National Highway 22 (road No. 26 - Le Minh Nhut).
26/08/2019 07:00
Khu quản lý giao thông đô thị số 3 Posted Development Investment Project Repairing National Highway 22 (Trung Viet to Cay Trom My Khanh), the direction of the city to Tay Ninh.
26/08/2019 07:00
The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor Khu quản lý giao thông đô thị số 3.
05/08/2019 16:20
The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor Khu quản lý giao thông đô thị số 3.
- Winning bidder: Công ty TNHH Thương mại Dịch vụ Xây dựng Công Nghệ Mới
05/08/2019 16:19
The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted the request Install traffic lights to warn before traffic intersections in District 12, Go Vap; Hoc Mon district, Cu Chi of the investor Khu quản lý giao thông đô thị số 3 with 3 bidding package.
29/07/2019 15:03
Khu quản lý giao thông đô thị số 3 Posted Development Investment Project Install traffic lights to warn before traffic intersections in District 12, Go Vap; Hoc Mon district, Cu Chi.
29/07/2019 14:14
The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted the request Repairing National Highway 22 (road No. 26 - Le Minh Nhut) of the investor Khu quản lý giao thông đô thị số 3 with 3 bidding package.
22/07/2019 16:39
The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted the request Repairing National Highway 22 (Trung Viet to Cay Trom My Khanh), the direction of the city to Tay Ninh of the investor Khu quản lý giao thông đô thị số 3 with 3 bidding package.
22/07/2019 16:39
Khu quản lý giao thông đô thị số 3 Posted Development Investment Project Repairing National Highway 22 (road No. 26 - Le Minh Nhut).
22/07/2019 16:16
Khu quản lý giao thông đô thị số 3 Posted Development Investment Project Repairing National Highway 22 (Trung Viet to Cay Trom My Khanh), the direction of the city to Tay Ninh.
22/07/2019 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Khu quản lý giao thông đô thị số 3 has posted 476 of the contractor selection plan, which contains 1449 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted 140 Tender Notice in the 136 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Khu quản lý giao thông đô thị số 3 has posted 399 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 399 package, canceled the bid 0 package (among the bidding packages above).
- There are 327 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Khu quản lý giao thông đô thị số 3 has a relationship with 111 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Khu quản lý giao thông đô thị số 3 has a relationship with 7 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Khu quản lý giao thông đô thị số 3 is the investor of 128 package, of which 92 package is self-invited, other units invite bid 36 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Khu quản lý giao thông đô thị số 3 is the owner of 500 contractor selection plan. In which, they self-invite 474 of contractor selection plan, other units invite bids of 26 of contractor selection plan.
Summary: Investor Khu quản lý giao thông đô thị số 3 is an investor with 126 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Khu quản lý giao thông đô thị số 3 is the investor of 116 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code