Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Trung tâm Công viên cây xanh Huế as follows:
- Has relationships with 16 contractor.
- Announced 14 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 32 contractor selection plans with a total of 73 bidding packages, of which 17 prequalification documents have not found the investment project.
- Has invited bids for 18 packages (with 19 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 12 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 59 packages that have not fully posted the contractor selection results. Of these 57 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.67 contractors.
- Breakdown by bidding field: Goods 36.84%, Construction 63.16%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 48,282,899,000 VND, of which the total winning bid value is: 47,619,633,900 VND.
- The savings rate is: 1.37%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm Công viên cây xanh Huế as follows:
- Has relationships with 16 contractor.
- The average number of contractors participating in each bidding package is: 1.67 contractors.
- Proportion of bidding fields: Goods 36.84%, Construction 63.16%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 48,282,899,000 VND, in which the total winning value is: 47,619,633,900 VND.
- The savings rate is: 1.37%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 14 investment and development projects.
- As the owner of 31 Contractor selection plan in which 31 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 17 bidding packages in which 11 packages are self-invited, and 6 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 13 bidding packages, of which 13 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.6% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Thừa Thiên - Huế (10), Undefined (3)
- Has relationships with 11 Bid Solicitors
- Has competed against 9 contractors in 8 bidding packages, won 8 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 6 contractors in 7 bidding packages, won 7 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Trung tâm Công viên cây xanh Huế Posted Development Investment Project Walking path along the banks of the Huong River from Toa Kham wharf to the foot of Dap Da bridge.
23/10/2024 10:10
The Bid solicitor Trung tâm Công viên cây xanh Huế has posted the request Plan for selecting contractors to build the Phu Van Lau Park lighting project of the investor Trung tâm Công viên cây xanh Huế with 4 bidding package.
11/09/2024 11:09
Trung tâm Công viên cây xanh Huế Posted Development Investment Project Electric lighting of Phu Van Lau Park.
11/09/2024 10:10
Trung tâm Công viên cây xanh Huế Posted Development Investment Project Electric lighting of Phu Van Lau Park.
09/09/2024 17:17
The Bid solicitor Trung tâm Công viên cây xanh Huế has posted the request Construction contractor selection plan (phase 2) for project: Thien An Park of the investor Trung tâm Công viên cây xanh Huế with 5 bidding package.
05/06/2024 10:52
Trung tâm Công viên cây xanh Huế Posted Development Investment Project Thien An Park.
05/06/2024 10:10
The Bid solicitor Trung tâm Công viên cây xanh Huế has posted the request Plan to select contractors to build phase 2 of the An Duong Vuong Street Renovation project (Section from Ngo Giang Xay to Thuy Duong overpass) of the investor Trung tâm Công viên cây xanh Huế with 1 bidding package.
16/02/2024 10:15
Trung tâm Công viên cây xanh Huế Posted Development Investment Project Refurbishment of An Duong Vuong Street (Section from Ngo Giang Xay to Thuy Duong overpass).
16/02/2024 09:09
The Bid solicitor Trung tâm Công viên cây xanh Huế has posted the results of the bidding package Package No. 02: Decorating and erecting models for the 2024 Spring Festival of the investor Trung tâm Công viên cây xanh Huế.
23/01/2024 11:15
The Bid solicitor Trung tâm Công viên cây xanh Huế has posted the request Decorating and erecting models for the 2024 Spring Festival of the investor Trung tâm Công viên cây xanh Huế with 4 bidding package.
05/01/2024 11:54
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm Công viên cây xanh Huế publishes the plan Plan for selecting contractors to build the Phu Van Lau Park lighting project with 4 bidding package .
11/09/2024 11:09
Trung tâm Công viên cây xanh Huế publishes the plan Construction contractor selection plan (phase 2) for project: Thien An Park with 5 bidding package .
05/06/2024 10:52
Trung tâm Công viên cây xanh Huế publishes the plan Plan to select contractors to build phase 2 of the An Duong Vuong Street Renovation project (Section from Ngo Giang Xay to Thuy Duong overpass) with 1 bidding package .
16/02/2024 10:15
Trung tâm Công viên cây xanh Huế announced the results of the bid package Package No. 02: Decorating and erecting models for the 2024 Spring Festival .
- Winning bidder: VIETNAM SMART AGRICULTURE TECHNOLOGY JOINT STOCK COMPANY, AGRIDRONE VIET NAM DEVICE FLY JOINT STOCK COMPANY, CÔNG TY TNHH MỘT THÀNH VIÊN SAO THÁNG CHÍN VIỆT NAM, VIETNAM SUNDRONE JOINT STOCK COMPANY
23/01/2024 11:15
Trung tâm Công viên cây xanh Huế publishes the plan Decorating and erecting models for the 2024 Spring Festival with 4 bidding package .
05/01/2024 11:54
Trung tâm Công viên cây xanh Huế publishes the plan Procurement of decorative models and supplies for Hue Traditional Craft Festival in 2023 with 4 bidding package .
17/03/2023 10:47
Trung tâm Công viên cây xanh Huế publishes the plan Supply Peach Blossoms to decorate the Spring of the Rabbit 2023 with 1 bidding package .
01/03/2023 15:10
Trung tâm Công viên cây xanh Huế publishes the plan Supply Peach Blossoms to decorate the Spring of the Rabbit 2023 with 1 bidding package .
01/03/2023 15:07
Trung tâm Công viên cây xanh Huế publishes the plan Supply Peach Blossoms to decorate the Spring of the Rabbit 2023 with 1 bidding package .
01/03/2023 15:03
Trung tâm Công viên cây xanh Huế publishes the plan Supplying pink Roses to serve the Spring Festival 2023 with 1 bidding package .
23/02/2023 16:19
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm Công viên cây xanh Huế Posted Development Investment Project Walking path along the banks of the Huong River from Toa Kham wharf to the foot of Dap Da bridge.
23/10/2024 10:10
The Bid solicitor Trung tâm Công viên cây xanh Huế has posted the request Plan for selecting contractors to build the Phu Van Lau Park lighting project of the investor Trung tâm Công viên cây xanh Huế with 4 bidding package.
11/09/2024 11:09
Trung tâm Công viên cây xanh Huế Posted Development Investment Project Electric lighting of Phu Van Lau Park.
11/09/2024 10:10
Trung tâm Công viên cây xanh Huế Posted Development Investment Project Electric lighting of Phu Van Lau Park.
09/09/2024 17:17
The Bid solicitor Trung tâm Công viên cây xanh Huế has posted the request Construction contractor selection plan (phase 2) for project: Thien An Park of the investor Trung tâm Công viên cây xanh Huế with 5 bidding package.
05/06/2024 10:52
Trung tâm Công viên cây xanh Huế Posted Development Investment Project Thien An Park.
05/06/2024 10:10
The Bid solicitor Trung tâm Công viên cây xanh Huế has posted the request Plan to select contractors to build phase 2 of the An Duong Vuong Street Renovation project (Section from Ngo Giang Xay to Thuy Duong overpass) of the investor Trung tâm Công viên cây xanh Huế with 1 bidding package.
16/02/2024 10:15
Trung tâm Công viên cây xanh Huế Posted Development Investment Project Refurbishment of An Duong Vuong Street (Section from Ngo Giang Xay to Thuy Duong overpass).
16/02/2024 09:09
The Bid solicitor Trung tâm Công viên cây xanh Huế has posted the results of the bidding package Package No. 02: Decorating and erecting models for the 2024 Spring Festival of the investor Trung tâm Công viên cây xanh Huế.
23/01/2024 11:15
The Bid solicitor Trung tâm Công viên cây xanh Huế has posted the request Decorating and erecting models for the 2024 Spring Festival of the investor Trung tâm Công viên cây xanh Huế with 4 bidding package.
05/01/2024 11:54
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm Công viên cây xanh Huế has posted 32 of the contractor selection plan, which contains 73 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trung tâm Công viên cây xanh Huế has posted 19 Tender Notice in the 18 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm Công viên cây xanh Huế has posted 12 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 12 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trung tâm Công viên cây xanh Huế has a relationship with 16 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Công viên cây xanh Huế has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Công viên cây xanh Huế is the investor of 17 package, of which 11 package is self-invited, other units invite bid 6 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Công viên cây xanh Huế is the owner of 31 contractor selection plan. In which, they self-invite 31 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Trung tâm Công viên cây xanh Huế is an investor with 22 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Công viên cây xanh Huế is the investor of 14 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code