Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án Biên Hòa as follows:
- Has relationships with 192 contractor.
- Announced 263 investment development project, of which 33 projects have not yet announced the prequalification documents.
- Announced 388 contractor selection plans with a total of 2672 bidding packages, of which 164 prequalification documents have not found the investment project.
- Has invited bids for 136 packages (with 145 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 804 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 738 packages with results that do not have tender notice or prequalification notice.
- There are 1717 packages that have not fully posted the contractor selection results. Of these 1716 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 29.66%, Construction 59.31%, Consultancy 10.34%, Non-consultancy 0%, Mixed 0.69%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,103,544,545,387 VND, of which the total winning bid value is: 1,001,626,055,574 VND.
- The savings rate is: 9.24%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án Biên Hòa as follows:
- Has relationships with 192 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 29.66%, Construction 59.31%, Consulting 10.34%, Non-consulting 0%, Mixed 0.69%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,103,544,545,387 VND, in which the total winning value is: 1,001,626,055,574 VND.
- The savings rate is: 9.24%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 263 investment and development projects.
- As the owner of 431 Contractor selection plan in which 326 Contractor selection plan is self-published, and 105 Contractor selection plan is posted by other units.
- Being the investor of 298 bidding packages in which 40 packages are self-invited, and 258 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 1 bidding packages, of which 1 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Undefined (1)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction of Tan Hoa Ward Medical Station.
22/10/2024 14:14
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction of Tan Hoa Ward Medical Station, Bien Hoa City.
22/10/2024 14:14
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction of Tan Hiep Ward Medical Station, Bien Hoa City.
22/10/2024 14:14
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction and renovation of Tan Hoa Ward Medical Station.
22/10/2024 13:13
The Bid solicitor Ban Quản lý dự án Biên Hòa has posted the request Construction and renovation of Tan Mai Kindergarten (campus 1) of the investor Ban Quản lý dự án Biên Hòa with 14 bidding package.
18/10/2024 11:32
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction and renovation of Tan Mai Kindergarten (campus 1).
18/10/2024 10:10
The Bid solicitor Ban Quản lý dự án Biên Hòa has posted the request Construction of Nguyen Binh Khiem Secondary School of the investor Ban Quản lý dự án Biên Hòa with 1 bidding package.
07/10/2024 16:41
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction of Nguyen Binh Khiem Secondary School.
07/10/2024 16:16
The Bid solicitor Ban Quản lý dự án Biên Hòa has posted the results of the bidding package Consultancy on making dossiers for environmental licensing of the investor Ban Quản lý dự án Biên Hòa.
- Winning bidder: BACH VIET DONG NAI COMPANY LIMITED
26/09/2024 15:33
The Bid solicitor Ban Quản lý dự án Biên Hòa has posted the results of the bidding package Consulting and supervision for construction and installation of fire protection systems, lightning protection + automatic fire alarm of the investor Ban Quản lý dự án Biên Hòa.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG KỸ THUẬT CÔNG NGHỆ H2D
26/09/2024 15:25
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án Biên Hòa publishes the plan Construction and renovation of Tan Mai Kindergarten (campus 1) with 14 bidding package .
18/10/2024 11:32
Ban Quản lý dự án Biên Hòa publishes the plan Construction of Nguyen Binh Khiem Secondary School with 1 bidding package .
07/10/2024 16:41
Ban Quản lý dự án Biên Hòa announced the results of the bid package Consultancy on making dossiers for environmental licensing .
- Winning bidder: BACH VIET DONG NAI COMPANY LIMITED
26/09/2024 15:33
Ban Quản lý dự án Biên Hòa announced the results of the bid package Consulting and supervision for construction and installation of fire protection systems, lightning protection + automatic fire alarm .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG KỸ THUẬT CÔNG NGHỆ H2D
26/09/2024 15:25
Ban Quản lý dự án Biên Hòa announced the results of the bid package Consulting and appraisal of equipment and materials .
- Winning bidder: DONG NAI VALUATION CORPORATION
26/09/2024 15:20
Ban Quản lý dự án Biên Hòa announced the results of the bid package Package No. 11: Consulting on inspection and acceptance of construction works .
- Winning bidder: VINH LOC CONSTRUCTION TECHNOLOGY COMPANY LIMITED
26/09/2024 15:08
Ban Quản lý dự án Biên Hòa announced the results of the bid package Consultancy on verifying cost estimates of construction works inspection and acceptance .
- Winning bidder: THONG NHAT CONSTRUCTION QUALITY CONTROL CONSULTING COMPANY LIMITED
26/09/2024 15:02
Ban Quản lý dự án Biên Hòa publishes the plan Construction of Tan Hanh Secondary School with 27 bidding package .
23/09/2024 14:13
Ban Quản lý dự án Biên Hòa publishes the plan Contractor selection plan (adjustments and additions) for the project: Construction of Tan Hiep primary school, Bien Hoa city with 15 bidding package .
09/09/2024 11:09
Ban Quản lý dự án Biên Hòa publishes the plan Renovating and repairing Ho Nai Ward Medical Station, Bien Hoa City with 8 bidding package .
22/08/2024 15:38
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction of Tan Hoa Ward Medical Station.
22/10/2024 14:14
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction of Tan Hoa Ward Medical Station, Bien Hoa City.
22/10/2024 14:14
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction of Tan Hiep Ward Medical Station, Bien Hoa City.
22/10/2024 14:14
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction and renovation of Tan Hoa Ward Medical Station.
22/10/2024 13:13
The Bid solicitor Ban Quản lý dự án Biên Hòa has posted the request Construction and renovation of Tan Mai Kindergarten (campus 1) of the investor Ban Quản lý dự án Biên Hòa with 14 bidding package.
18/10/2024 11:32
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction and renovation of Tan Mai Kindergarten (campus 1).
18/10/2024 10:10
The Bid solicitor Ban Quản lý dự án Biên Hòa has posted the request Construction of Nguyen Binh Khiem Secondary School of the investor Ban Quản lý dự án Biên Hòa with 1 bidding package.
07/10/2024 16:41
Ban Quản lý dự án Biên Hòa Posted Development Investment Project Construction of Nguyen Binh Khiem Secondary School.
07/10/2024 16:16
The Bid solicitor Ban Quản lý dự án Biên Hòa has posted the results of the bidding package Consultancy on making dossiers for environmental licensing of the investor Ban Quản lý dự án Biên Hòa.
- Winning bidder: BACH VIET DONG NAI COMPANY LIMITED
26/09/2024 15:33
The Bid solicitor Ban Quản lý dự án Biên Hòa has posted the results of the bidding package Consulting and supervision for construction and installation of fire protection systems, lightning protection + automatic fire alarm of the investor Ban Quản lý dự án Biên Hòa.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG KỸ THUẬT CÔNG NGHỆ H2D
26/09/2024 15:25
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án Biên Hòa has posted 388 of the contractor selection plan, which contains 2672 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án Biên Hòa has posted 145 Tender Notice in the 136 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án Biên Hòa has posted 804 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 804 package, canceled the bid 0 package (among the bidding packages above).
- There are 738 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án Biên Hòa has a relationship with 192 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: Investor Ban Quản lý dự án Biên Hòa has a relationship with 23 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Biên Hòa is the investor of 298 package, of which 40 package is self-invited, other units invite bid 258 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Biên Hòa is the owner of 431 contractor selection plan. In which, they self-invite 326 of contractor selection plan, other units invite bids of 105 of contractor selection plan.
Summary: Investor Ban Quản lý dự án Biên Hòa is an investor with 321 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Biên Hòa is the investor of 263 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code