Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors 147 Brigade as follows:
- Has relationships with 1 project owners.
- Has relationships with 35 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 74 contractor selection plans with a total of 86 bidding packages, of which 73 prequalification documents have not found the investment project.
- Has invited bids for 58 packages (with 62 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 74 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 18 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 12 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.34 contractors.
- Breakdown by bidding field: Goods 91.94%, Construction 8.06%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 41,284,285,899 VND, of which the total winning bid value is: 39,424,929,280 VND.
- The savings rate is: 4.50%.
Data analysis results of DauThau.info software for bid solicitors 147 Brigade as follows:
- Has relationships with 35 contractor.
- The average number of contractors participating in each bidding package is: 1.34 contractors.
- Proportion of bidding fields: Goods 91.94%, Construction 8.06%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 41,284,285,899 VND, in which the total winning value is: 39,424,929,280 VND.
- The savings rate is: 4.50%.
This Bid solicitor is also an investor. The analysis results of data for the investor 147 Brigade are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 72 contractor selection plans, of which 51 were self-published, and 21 were published by other entities.
- Is the investor of 67 Tender Notices, of which 62 were self-invited, and 5 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
147 Brigade announced the results of the bid package Package No. 12: "Purchase of additional materials" .
- Winning bidder: HỘ KINH DOANH VŨ HỮU LUÂN
15/12/2025 09:41
147 Brigade announced the results of the bid package Bidding package No. 04: "Procurement of materials for maintenance and repair of technical equipment in the fourth quarter of 2025" .
- Winning bidder: HỘ KINH DOANH ĐỖ BÍCH HẰNG
03/12/2025 11:50
147 Brigade announced the results of the bid package Package No. 03: "Procurement of materials for preservation, technical maintenance, and repair of motorbikes" .
- Winning bidder: CỬA HÀNG THƯƠNG MẠI DỊCH VỤ KỸ THUẬT HỒNG NHUNG
03/12/2025 11:45
147 Brigade announced the results of the bid package Package No. 02: "Procurement of VTHH, repair of lightning and fire protection systems, and regular consolidation of technical areas" .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ THIẾT BỊ PHƯƠNG HƯNG
03/12/2025 11:32
147 Brigade announced the results of the bid package Package No. 02: "Procurement of materials to repair and consolidate fuel storage warehouses and petroleum depots" .
- Winning bidder: HỘ KINH DOANH ĐỖ BÍCH HẰNG
28/11/2025 14:49
147 Brigade publishes the plan Procurement of materials to repair and strengthen fuel storage warehouses with 1 bidding package .
25/11/2025 14:09
147 Brigade announced the results of the bid package Package No. 01: "Buying materials and goods to repair and strengthen warehouse doors and roofs" .
- Winning bidder: HỘ KINH DOANH VŨ HỮU LUÂN
25/11/2025 09:30
147 Brigade announced the results of the bid package Bidding package No. 05: "Procurement of materials for repairing technical facilities in the fourth quarter of 2025" .
- Winning bidder: HỘ KINH DOANH ĐỖ BÍCH HẰNG
21/11/2025 15:52
147 Brigade publishes Tender Notice Bidding package No. 04: "Procurement of materials for maintenance and repair of technical equipment in the fourth quarter of 2025" in the form Competitive Offer .
20/11/2025 14:43
The data sheet has been partially hidden, to see the full information please Login or Register
147 Brigade announced the results of the bid package Package 2: "Procurement of technical assurance materials repair materials" .
- Winning bidder: HỘ KINH DOANH PHẠM QUÝ HƯNG 1969
24/06/2025 08:53
147 Brigade publishes the plan Shopping for technical assurance facilities with 1 bidding package .
19/06/2025 09:54
147 Brigade announced the results of the bid package Bidding package 07: Buy supplementation of material in charge in 2025 .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ VẬN TẢI 64
13/06/2025 07:51
147 Brigade announced the results of the bid package Package No. 06: Buy matter for specialized activities and fee in 2025 .
- Winning bidder: HỘ KINH DOANH VŨ HỮU LUÂN
09/06/2025 10:45
147 Brigade announced the results of the bid package Package No. 05: Buying material for collective welfare at the 2nd unit in 2025 .
- Winning bidder: HỘ KINH DOANH ĐÀO THỊ THANH XUÂN
09/06/2025 10:40
147 Brigade announced the results of the bid package Shopping for maintenance and repair of technical equipment for logistics and technical rooms in 2025 .
- Winning bidder: HỘ KINH DOANH ĐỖ BÍCH HẰNG
06/06/2025 15:39
147 Brigade announced the results of the bidding package Shopping for maintenance and repair of technical equipment for logistics and technical rooms in 2025 with 1 participating contractors .
03/06/2025 08:48
147 Brigade announced the results of the bid package Procurement of goods and supplies for business work in barracks .
- Winning bidder: Hộ kinh doanh Cửa hàng Thuyết Minh
02/06/2025 14:39
147 Brigade publishes the plan Buy supplementary supplements in 2025 with 1 bidding package .
30/05/2025 09:34
147 Brigade publishes the plan Buying material for specialized activities and directing the fee in 2025 with 1 bidding package .
30/05/2025 09:26
The data sheet has been partially hidden, to see the full information please Login or Register
147 Brigade announced the results of the bid package Package No. 12: "Purchase of additional materials" .
- Winning bidder: HỘ KINH DOANH VŨ HỮU LUÂN
15/12/2025 09:41
147 Brigade announced the results of the bid package Bidding package No. 04: "Procurement of materials for maintenance and repair of technical equipment in the fourth quarter of 2025" .
- Winning bidder: HỘ KINH DOANH ĐỖ BÍCH HẰNG
03/12/2025 11:50
147 Brigade announced the results of the bid package Package No. 03: "Procurement of materials for preservation, technical maintenance, and repair of motorbikes" .
- Winning bidder: CỬA HÀNG THƯƠNG MẠI DỊCH VỤ KỸ THUẬT HỒNG NHUNG
03/12/2025 11:45
147 Brigade announced the results of the bid package Package No. 02: "Procurement of VTHH, repair of lightning and fire protection systems, and regular consolidation of technical areas" .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ THIẾT BỊ PHƯƠNG HƯNG
03/12/2025 11:32
147 Brigade announced the results of the bid package Package No. 02: "Procurement of materials to repair and consolidate fuel storage warehouses and petroleum depots" .
- Winning bidder: HỘ KINH DOANH ĐỖ BÍCH HẰNG
28/11/2025 14:49
147 Brigade publishes the plan Procurement of materials to repair and strengthen fuel storage warehouses with 1 bidding package .
25/11/2025 14:09
147 Brigade announced the results of the bid package Package No. 01: "Buying materials and goods to repair and strengthen warehouse doors and roofs" .
- Winning bidder: HỘ KINH DOANH VŨ HỮU LUÂN
25/11/2025 09:30
147 Brigade announced the results of the bid package Bidding package No. 05: "Procurement of materials for repairing technical facilities in the fourth quarter of 2025" .
- Winning bidder: HỘ KINH DOANH ĐỖ BÍCH HẰNG
21/11/2025 15:52
147 Brigade publishes Tender Notice Bidding package No. 04: "Procurement of materials for maintenance and repair of technical equipment in the fourth quarter of 2025" in the form Competitive Offer .
20/11/2025 14:43
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s 147 Brigade has posted 74 of the contractor selection plan, which contains 86 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor 147 Brigade has posted 62 Tender Notices in 58 bidding packages. Among these, 62 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor 147 Brigade has posted 74 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 74 package, canceled the bid 0 package (among the bidding packages above).
- There are 18 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor 147 Brigade has a relationship with 35 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor 147 Brigade has a relationship with 11 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity 147 Brigade has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects