Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors 30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 29 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 27 contractor selection plans with a total of 57 bidding packages, of which 27 prequalification documents have not found the investment project.
- Has invited bids for 16 packages (with 19 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 25 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 15 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 27 packages that have not fully posted the contractor selection results. Of these 25 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.00 contractors.
- Breakdown by bidding field: Goods 10.53%, Construction 68.42%, Consultancy 0%, Non-consultancy 21.05%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 39,747,093,498 VND, of which the total winning bid value is: 37,868,212,214 VND.
- The savings rate is: 4.73%.
Data analysis results of DauThau.info software for bid solicitors 30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY as follows:
- Has relationships with 29 contractor.
- The average number of contractors participating in each bidding package is: 3.00 contractors.
- Proportion of bidding fields: Goods 10.53%, Construction 68.42%, Consulting 0%, Non-consulting 21.05%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 39,747,093,498 VND, in which the total winning value is: 37,868,212,214 VND.
- The savings rate is: 4.73%.
This Bid solicitor is also an investor. The analysis results of data for the investor 30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 28 contractor selection plans, of which 23 were self-published, and 5 were published by other entities.
- Is the investor of 29 Tender Notices, of which 19 were self-invited, and 10 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Consulting services on plans and procedures for implementing the Company's capital transfer at Sorbitol France - Vietnam Joint Stock Company .
- Winning bidder: BETA SECURITIES INCORPORATION
31/12/2025 11:06
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Estimate: Consulting services Plans and procedures for implementing the Company's capital transfer at Sorbitol France - Vietnam Joint Stock Company with 1 bidding package .
31/12/2025 08:53
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes Tender Notice Package 2: Seedlings in the form Competitive Offer .
24/12/2025 16:41
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes Tender Notice Package 1: Fertilizer in the form Competitive Offer .
24/12/2025 16:39
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Consulting on preparing E-Bidding Documents and evaluating E-Bidding Documents Package 2: Seedlings .
10/12/2025 09:42
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Consulting on preparing E-Bidding and evaluating E-Bidding Package 1: Fertilizer .
- Winning bidder: CÔNG TY TNHH QUẢN LÝ DỰ ÁN VÀ TƯ VẤN ĐẦU TƯ XÂY DỰNG TÍN NGUYỄN
10/12/2025 09:39
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Contractor selection plan: Estimate: Replanting - new planting in 2026 with 4 bidding package .
08/12/2025 10:12
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Contractor selection plan: Estimate: Replanting - new planting in 2026 with 4 bidding package .
05/12/2025 15:03
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Auditing Service 2025 .
- Winning bidder: VIET AUSTRALIA AUDITING COMPANY LIMITED
17/10/2025 14:15
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Estimation: Auditing Service 2025 with 1 bidding package .
06/10/2025 15:02
The data sheet has been partially hidden, to see the full information please Login or Register
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package 1: Supply seedlings for miles in 2025 .
- Winning bidder: CÔNG TY TNHH MTV NÔNG NGHIỆP TIẾN DŨNG TÂY NINH
04/07/2025 14:53
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Estimation: Supply seedlings for miles in 2025 with 1 bidding package .
30/06/2025 14:20
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Plan for contractor selection: Car shopping for production and business with 4 bidding package .
25/06/2025 10:38
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Evaluation of liquidated rubber trees in 2025 .
- Winning bidder: Công ty TNHH Tư vấn và Thẩm định giá Phương Nam
19/06/2025 14:49
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Estimation: Appraisal of liquidated rubber trees in 2025 with 1 bidding package .
11/06/2025 14:08
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package 6: Bidding package for construction of digging, dredging ditches, installing F15, F17, F18, F19, F20, F20 works of Tan Hoa NTCS project .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN NAM TRẠNG
05/06/2025 09:23
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package 5: Bidding package for construction of excavation, dredging ditches, installation of Lot sewer 20e, 23e, 24e, 25E .
- Winning bidder: CÔNG TY TNHH HIỆP BÌNH QUỚI
05/06/2025 09:12
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package 4: Bidding package for construction of excavation, dredging ditches, installation of land plot of district Party Committee, Mr. Binh, Lot D2, C2 of Chau Thanh NTCS project .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BẢO BẢO TN
05/06/2025 08:59
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Adjusting and supplementing the plan for estimating contractor: Recovery - New planting in 2025 with 3 bidding package .
23/05/2025 09:40
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package 1: Consulting check and acceptance .
- Winning bidder: BINH AN SERVICE AND CONSULTANT JOINT STOCK COMPANY
14/04/2025 14:09
The data sheet has been partially hidden, to see the full information please Login or Register
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Consulting services on plans and procedures for implementing the Company's capital transfer at Sorbitol France - Vietnam Joint Stock Company .
- Winning bidder: BETA SECURITIES INCORPORATION
31/12/2025 11:06
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Estimate: Consulting services Plans and procedures for implementing the Company's capital transfer at Sorbitol France - Vietnam Joint Stock Company with 1 bidding package .
31/12/2025 08:53
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes Tender Notice Package 2: Seedlings in the form Competitive Offer .
24/12/2025 16:41
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes Tender Notice Package 1: Fertilizer in the form Competitive Offer .
24/12/2025 16:39
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Consulting on preparing E-Bidding Documents and evaluating E-Bidding Documents Package 2: Seedlings .
10/12/2025 09:42
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Consulting on preparing E-Bidding and evaluating E-Bidding Package 1: Fertilizer .
- Winning bidder: CÔNG TY TNHH QUẢN LÝ DỰ ÁN VÀ TƯ VẤN ĐẦU TƯ XÂY DỰNG TÍN NGUYỄN
10/12/2025 09:39
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Contractor selection plan: Estimate: Replanting - new planting in 2026 with 4 bidding package .
08/12/2025 10:12
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Contractor selection plan: Estimate: Replanting - new planting in 2026 with 4 bidding package .
05/12/2025 15:03
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Auditing Service 2025 .
- Winning bidder: VIET AUSTRALIA AUDITING COMPANY LIMITED
17/10/2025 14:15
30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY publishes the plan Estimation: Auditing Service 2025 with 1 bidding package .
06/10/2025 15:02
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s 30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY has posted 27 of the contractor selection plan, which contains 57 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor 30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY has posted 19 Tender Notices in 16 bidding packages. Among these, 19 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor 30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY has posted 25 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 25 package, canceled the bid 0 package (among the bidding packages above).
- There are 15 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor 30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY has a relationship with 29 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor 30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity 30-4 TAY NINH ONE MEMBER LIMITED LIABILITY COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects