Data analysis results of DauThau.info software for bid solicitors 83rd ENGINEER BRIGADE as follows:
- Has relationships with 26 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 30 contractor selection plans with a total of 38 bidding packages, of which 28 prequalification documents have not found the investment project.
- Has invited bids for 9 packages (with 9 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 36 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 28 packages with results that do not have tender notice or prequalification notice.
- There are 2 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.88 contractors.
- Breakdown by bidding field: Goods 88.89%, Construction 11.11%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 8,907,414,709 VND, of which the total winning bid value is: 8,431,920,635 VND.
- The savings rate is: 5.34%.
Data analysis results of DauThau.info software for bid solicitors 83rd ENGINEER BRIGADE as follows:
- Has relationships with 26 contractor.
- The average number of contractors participating in each bidding package is: 1.88 contractors.
- Proportion of bidding fields: Goods 88.89%, Construction 11.11%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 8,907,414,709 VND, in which the total winning value is: 8,431,920,635 VND.
- The savings rate is: 5.34%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 1 investment and development projects.
- As the owner of 17 Contractor selection plan in which 17 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 9 bidding packages in which 9 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 3 bidding packages, of which 3 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.94% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Undefined (3)
- Has relationships with 2 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor 83rd ENGINEER BRIGADE has posted Tender Notice Package MS-03: Guaranteed purchase of rice for kitchens in Da Nang in the first 6 months of 2025 of the investor 83rd ENGINEER BRIGADE with the form Competitive Offer.
27/10/2024 09:09
The Bid solicitor 83rd ENGINEER BRIGADE has posted the results of the bidding package Bidding package MS-01: Procurement of CTĐ and CTCT materials of the investor 83rd ENGINEER BRIGADE.
- Winning bidder: BACH PHU DAT TRADE AND SERVICE COMPANY LIMITED
25/10/2024 14:35
The Bid solicitor 83rd ENGINEER BRIGADE has posted the request Procurement of supplies for party and political work in 2024 of the investor 83rd ENGINEER BRIGADE with 1 bidding package.
17/10/2024 10:21
The Bid solicitor 83rd ENGINEER BRIGADE has posted the results of the bidding package Bidding package TV-04: E-HSMT appraisal and contractor selection results of the investor 83rd ENGINEER BRIGADE.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ PHAN TÚ
15/10/2024 10:51
The Bid solicitor 83rd ENGINEER BRIGADE has posted the results of the bidding package Tender package TV-03: Consulting for E-HSMT preparation and E-HSDT evaluation of the investor 83rd ENGINEER BRIGADE.
- Winning bidder: ANH VU SUSTAINABLE DESIGN AND CONSTRUCTION COMPANY LIMITED
15/10/2024 10:47
The Bid solicitor 83rd ENGINEER BRIGADE has posted the request Buy guaranteed regular rice for kitchens in Da Nang in the first 6 months of 2025 of the investor 83rd ENGINEER BRIGADE with 3 bidding package.
10/10/2024 14:06
The Bid solicitor 83rd ENGINEER BRIGADE has posted the request Buy guaranteed regular rice for kitchens in Da Nang in the first 6 months of 2025 of the investor 83rd ENGINEER BRIGADE with 3 bidding package.
09/10/2024 15:18
The Bid solicitor 83rd ENGINEER BRIGADE has posted the results of the bidding package Package MS-02: Guaranteed purchase of rice for kitchens in Da Nang in the second quarter of 2024 of the investor 83rd ENGINEER BRIGADE.
- Winning bidder: ĐỖ THỊ LIÊN
17/06/2024 15:27
Bid solicitor 83rd ENGINEER BRIGADE has posted Tender Notice Package MS-02: Guaranteed purchase of rice for kitchens in Da Nang in the second quarter of 2024 of the investor 83rd ENGINEER BRIGADE with the form Competitive Offer.
12/05/2024 09:19
The Bid solicitor 83rd ENGINEER BRIGADE has posted the results of the bidding package Bidding package TV-02: E-HSMT appraisal and contractor selection results of the investor 83rd ENGINEER BRIGADE.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẤU THẦU VÀ QUẢN LÝ DỰ ÁN MIỀN TRUNG
25/04/2024 09:24
The data sheet has been partially hidden, to see the full information please Login or Register
83rd ENGINEER BRIGADE publishes Tender Notice Package MS-03: Guaranteed purchase of rice for kitchens in Da Nang in the first 6 months of 2025 in the form Competitive Offer .
27/10/2024 09:09
83rd ENGINEER BRIGADE announced the results of the bid package Bidding package MS-01: Procurement of CTĐ and CTCT materials .
- Winning bidder: BACH PHU DAT TRADE AND SERVICE COMPANY LIMITED
25/10/2024 14:35
83rd ENGINEER BRIGADE publishes the plan Procurement of supplies for party and political work in 2024 with 1 bidding package .
17/10/2024 10:21
83rd ENGINEER BRIGADE announced the results of the bid package Bidding package TV-04: E-HSMT appraisal and contractor selection results .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ PHAN TÚ
15/10/2024 10:51
83rd ENGINEER BRIGADE announced the results of the bid package Tender package TV-03: Consulting for E-HSMT preparation and E-HSDT evaluation .
- Winning bidder: ANH VU SUSTAINABLE DESIGN AND CONSTRUCTION COMPANY LIMITED
15/10/2024 10:47
83rd ENGINEER BRIGADE publishes the plan Buy guaranteed regular rice for kitchens in Da Nang in the first 6 months of 2025 with 3 bidding package .
10/10/2024 14:06
83rd ENGINEER BRIGADE publishes the plan Buy guaranteed regular rice for kitchens in Da Nang in the first 6 months of 2025 with 3 bidding package .
09/10/2024 15:18
83rd ENGINEER BRIGADE announced the results of the bid package Package MS-02: Guaranteed purchase of rice for kitchens in Da Nang in the second quarter of 2024 .
- Winning bidder: ĐỖ THỊ LIÊN
17/06/2024 15:27
83rd ENGINEER BRIGADE announced the results of the bidding package Package MS-02: Guaranteed purchase of rice for kitchens in Da Nang in the second quarter of 2024 with 1 participating contractors .
18/05/2024 10:02
83rd ENGINEER BRIGADE publishes Tender Notice Package MS-02: Guaranteed purchase of rice for kitchens in Da Nang in the second quarter of 2024 in the form Competitive Offer .
12/05/2024 09:19
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor 83rd ENGINEER BRIGADE has posted Tender Notice Package MS-03: Guaranteed purchase of rice for kitchens in Da Nang in the first 6 months of 2025 of the investor 83rd ENGINEER BRIGADE with the form Competitive Offer.
27/10/2024 09:09
The Bid solicitor 83rd ENGINEER BRIGADE has posted the results of the bidding package Bidding package MS-01: Procurement of CTĐ and CTCT materials of the investor 83rd ENGINEER BRIGADE.
- Winning bidder: BACH PHU DAT TRADE AND SERVICE COMPANY LIMITED
25/10/2024 14:35
The Bid solicitor 83rd ENGINEER BRIGADE has posted the request Procurement of supplies for party and political work in 2024 of the investor 83rd ENGINEER BRIGADE with 1 bidding package.
17/10/2024 10:21
The Bid solicitor 83rd ENGINEER BRIGADE has posted the results of the bidding package Bidding package TV-04: E-HSMT appraisal and contractor selection results of the investor 83rd ENGINEER BRIGADE.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ PHAN TÚ
15/10/2024 10:51
The Bid solicitor 83rd ENGINEER BRIGADE has posted the results of the bidding package Tender package TV-03: Consulting for E-HSMT preparation and E-HSDT evaluation of the investor 83rd ENGINEER BRIGADE.
- Winning bidder: ANH VU SUSTAINABLE DESIGN AND CONSTRUCTION COMPANY LIMITED
15/10/2024 10:47
The Bid solicitor 83rd ENGINEER BRIGADE has posted the request Buy guaranteed regular rice for kitchens in Da Nang in the first 6 months of 2025 of the investor 83rd ENGINEER BRIGADE with 3 bidding package.
10/10/2024 14:06
The Bid solicitor 83rd ENGINEER BRIGADE has posted the request Buy guaranteed regular rice for kitchens in Da Nang in the first 6 months of 2025 of the investor 83rd ENGINEER BRIGADE with 3 bidding package.
09/10/2024 15:18
The Bid solicitor 83rd ENGINEER BRIGADE has posted the results of the bidding package Package MS-02: Guaranteed purchase of rice for kitchens in Da Nang in the second quarter of 2024 of the investor 83rd ENGINEER BRIGADE.
- Winning bidder: ĐỖ THỊ LIÊN
17/06/2024 15:27
Bid solicitor 83rd ENGINEER BRIGADE has posted Tender Notice Package MS-02: Guaranteed purchase of rice for kitchens in Da Nang in the second quarter of 2024 of the investor 83rd ENGINEER BRIGADE with the form Competitive Offer.
12/05/2024 09:19
The Bid solicitor 83rd ENGINEER BRIGADE has posted the results of the bidding package Bidding package TV-02: E-HSMT appraisal and contractor selection results of the investor 83rd ENGINEER BRIGADE.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẤU THẦU VÀ QUẢN LÝ DỰ ÁN MIỀN TRUNG
25/04/2024 09:24
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s 83rd ENGINEER BRIGADE has posted 30 of the contractor selection plan, which contains 38 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor 83rd ENGINEER BRIGADE has posted 9 Tender Notice in the 9 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor 83rd ENGINEER BRIGADE has posted 36 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 36 package, canceled the bid 0 package (among the bidding packages above).
- There are 28 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor 83rd ENGINEER BRIGADE has a relationship with 26 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 83rd ENGINEER BRIGADE has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 83rd ENGINEER BRIGADE is the investor of 9 package, of which 9 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 83rd ENGINEER BRIGADE is the owner of 17 contractor selection plan. In which, they self-invite 17 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor 83rd ENGINEER BRIGADE is an investor with 26 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 83rd ENGINEER BRIGADE is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register