Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 as follows:
- Has relationships with 3 project owners.
- Has relationships with 445 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 122 contractor selection plans with a total of 327 bidding packages, of which 121 prequalification documents have not found the investment project.
- Has invited bids for 690 packages (with 712 tender notices), and conducted prequalification for 5 packages.
- There are 5 bidding packages with content that needs clarification.
- Announced the results of 384 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 102 packages that have not fully posted the contractor selection results. Of these 62 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.37 contractors.
- Breakdown by bidding field: Goods 52.67%, Construction 20.93%, Consultancy 9.13%, Non-consultancy 15.73%, Mixed 1.40%, Other fields 0.14%.
- The total value according to the packages with valid contractor selection results is: 1,257,522,836,987 VND, of which the total winning bid value is: 1,099,726,297,401 VND.
- The savings rate is: 12.55%.
Data analysis results of DauThau.info software for bid solicitors CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 as follows:
- Has relationships with 445 contractor.
- The average number of contractors participating in each bidding package is: 3.37 contractors.
- Proportion of bidding fields: Goods 52.67%, Construction 20.93%, Consulting 9.13%, Non-consulting 15.73%, Mixed 1.40%, Other 0.14%.
- The total value according to the bidding package with valid IMP is: 1,257,522,836,987 VND, in which the total winning value is: 1,099,726,297,401 VND.
- The savings rate is: 12.55%.
This Bid solicitor is also an investor. The analysis results of data for the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 21 contractor selection plans, of which 21 were self-published, and 0 were published by other entities.
- Is the investor of 256 Tender Notices, of which 249 were self-invited, and 7 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 1 bidding packages, of which 1 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 99.75% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.75% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Undefined (1)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Supply of materials, equipment and installation services to serve the maintenance of secondary equipment system, DCS measurement and control equipment system of unit S1 at O Mon I thermal power plant in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: CÔNG TY CỔ PHẦN KỸ THUẬT CÔNG NGHIỆP Á CHÂU
31/10/2022 08:44
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Energy audit in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: Công ty CP Năng lượng và Môi trường Bách Khoa
27/10/2022 10:35
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Supplying materials and equipment for general mechanics for production and business in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ KỸ THUẬT PHÚC HƯNG LONG
19/10/2022 08:21
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Supplying general electrical equipment and materials for production and business in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: CÔNG TY TNHH GIẢI PHÁP THIẾT BỊ CÔNG NGHIỆP VTN
07/10/2022 09:45
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Supply and installation of battery monitoring system for units S1 and S2 O Mon I of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: Công ty TNHH Dịch vụ và Hệ thống EDPN
14/09/2022 16:46
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Task of survey, inspection and safety assessment of works: Periodic inspection and safety assessment of the wharf of O Mon I Thermal Power Plant in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN KIỂM ĐỊNH XÂY DỰNG NAM Á
14/09/2022 11:22
Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted Tender Notice Energy audit in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 with the form National competitive bidding.
13/09/2022 15:14
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Consulting to prepare dossiers to apply for environmental permits for Can Tho Thermal Power Plant of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: TRUNG TÂM TƯ VẤN VÀ TRUYỀN THÔNG MÔI TRƯỜNG
13/09/2022 08:31
Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted Tender Notice Supplying materials and equipment for Industrial Electrical - Control for production and business in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 with the form National competitive bidding.
09/09/2022 11:40
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Supplying industrial chemicals for production and business in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: Công ty Cổ phần xuất nhập khẩu hóa chất và thiết bị Kim Ngưu
29/08/2022 10:47
The data sheet has been partially hidden, to see the full information please Login or Register
CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 announced the results of the bid package Supply of materials, equipment and installation services to serve the maintenance of secondary equipment system, DCS measurement and control equipment system of unit S1 at O Mon I thermal power plant in 2022 .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI - KỸ THUẬT HẢI ANH, CÔNG TY CỔ PHẦN KỸ THUẬT CÔNG NGHIỆP Á CHÂU
31/10/2022 08:44
CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 announced the results of the bid package Energy audit in 2022 .
- Winning bidder: Công ty CP Năng lượng và Môi trường Bách Khoa
27/10/2022 10:35
CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 announced the results of the bid package Supplying materials and equipment for general mechanics for production and business in 2022 .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ KỸ THUẬT PHÚC HƯNG LONG
19/10/2022 08:21
CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 announced the results of the bidding package Energy audit in 2022 with 1 participating contractors .
11/10/2022 10:57
CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 announced the results of the bid package Supplying general electrical equipment and materials for production and business in 2022 .
- Winning bidder: CÔNG TY TNHH GIẢI PHÁP THIẾT BỊ CÔNG NGHIỆP VTN
07/10/2022 09:45
CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 announced the results of the bidding package Supplying materials and equipment for Industrial Electrical - Control for production and business in 2022 with 6 participating contractors .
19/09/2022 14:02
CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 announced the results of the bid package Supply and installation of battery monitoring system for units S1 and S2 O Mon I .
- Winning bidder: Công ty TNHH Dịch vụ và Hệ thống EDPN
14/09/2022 16:46
CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 announced the results of the bid package Task of survey, inspection and safety assessment of works: Periodic inspection and safety assessment of the wharf of O Mon I Thermal Power Plant in 2022 .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN KIỂM ĐỊNH XÂY DỰNG NAM Á
14/09/2022 11:22
CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 publishes Tender Notice Energy audit in 2022 in the form National competitive bidding .
13/09/2022 15:14
CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 announced the results of the bid package Consulting to prepare dossiers to apply for environmental permits for Can Tho Thermal Power Plant .
- Winning bidder: TRUNG TÂM TƯ VẤN VÀ TRUYỀN THÔNG MÔI TRƯỜNG
13/09/2022 08:31
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Supply of materials, equipment and installation services to serve the maintenance of secondary equipment system, DCS measurement and control equipment system of unit S1 at O Mon I thermal power plant in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: CÔNG TY CỔ PHẦN KỸ THUẬT CÔNG NGHIỆP Á CHÂU
31/10/2022 08:44
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Energy audit in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: Công ty CP Năng lượng và Môi trường Bách Khoa
27/10/2022 10:35
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Supplying materials and equipment for general mechanics for production and business in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ KỸ THUẬT PHÚC HƯNG LONG
19/10/2022 08:21
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Supplying general electrical equipment and materials for production and business in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: CÔNG TY TNHH GIẢI PHÁP THIẾT BỊ CÔNG NGHIỆP VTN
07/10/2022 09:45
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Supply and installation of battery monitoring system for units S1 and S2 O Mon I of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: Công ty TNHH Dịch vụ và Hệ thống EDPN
14/09/2022 16:46
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Task of survey, inspection and safety assessment of works: Periodic inspection and safety assessment of the wharf of O Mon I Thermal Power Plant in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN KIỂM ĐỊNH XÂY DỰNG NAM Á
14/09/2022 11:22
Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted Tender Notice Energy audit in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 with the form National competitive bidding.
13/09/2022 15:14
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Consulting to prepare dossiers to apply for environmental permits for Can Tho Thermal Power Plant of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: TRUNG TÂM TƯ VẤN VÀ TRUYỀN THÔNG MÔI TRƯỜNG
13/09/2022 08:31
Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted Tender Notice Supplying materials and equipment for Industrial Electrical - Control for production and business in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 with the form National competitive bidding.
09/09/2022 11:40
The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted the results of the bidding package Supplying industrial chemicals for production and business in 2022 of the investor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2.
- Winning bidder: Công ty Cổ phần xuất nhập khẩu hóa chất và thiết bị Kim Ngưu
29/08/2022 10:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted 122 of the contractor selection plan, which contains 327 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 posted 5 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted 712 Tender Notices in 690 bidding packages. Among these, 655 Tender Notices were self-invited, and 57 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has posted 384 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 384 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has a relationship with 445 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has a relationship with 7 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity CANTHO THERMAL POWER COMPANY BRANCH OF POWER GENERATION CORPORATION 2 has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects