Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Control, Automation in Production and Improvement of Technology Institute as follows:
- Has relationships with 1 project owners.
- Has relationships with 15 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Control, Automation in Production and Improvement of Technology Institute as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Control, Automation in Production and Improvement of Technology Institute are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 16 contractor selection plans, of which 0 were self-published, and 16 were published by other entities.
- Is the investor of 8 Tender Notices, of which 0 were self-invited, and 8 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 4 bidding packages, of which 4 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 99.43% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.87% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : (2), Hà Nội (2)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (2), Undefined (2)
- Has relationships with 3 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Control, Automation in Production and Improvement of Technology Institute announced the results of the bid package Bidding package: "Procurement of fire protection equipment" .
- Winning bidder: Công ty TNHH thiết bị HGK
17/12/2025 14:41
Control, Automation in Production and Improvement of Technology Institute publishes the plan Procurement estimate contractor selection plan: "Procurement of fire protection equipment" with 1 bidding package .
17/12/2025 13:44
Control, Automation in Production and Improvement of Technology Institute announced the results of the bid package Tender package: "Procurement of kitchen utensils". .
- Winning bidder: HỘ KINH DOANH VŨ TRỌNG LONG
17/12/2025 08:17
Control, Automation in Production and Improvement of Technology Institute publishes the plan Plan for selecting contractors for procurement estimates "Procurement of kitchen appliances" with 1 bidding package .
12/12/2025 15:00
Control, Automation in Production and Improvement of Technology Institute announced the results of the bid package Bid package: "Renovating and repairing the Institute of Automation at 89b Ly Nam De". .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ XÂY DỰNG TRƯỜNG THỌ PHÁT
12/12/2025 14:53
Control, Automation in Production and Improvement of Technology Institute publishes the plan Plan for selecting contractors to perform the task "Renovating and repairing the Institute of Automation at 89b Ly Nam De" with 1 bidding package .
12/12/2025 14:32
Control, Automation in Production and Improvement of Technology Institute announced the results of the bid package Bidding package No. 01: “Purchase of electrical and electronic materials, mechanical and auxiliary materials” .
- Winning bidder: TAN NAM LONG TRADING COMPANY LIMITED
11/12/2025 09:28
Control, Automation in Production and Improvement of Technology Institute announced the results of the bid package Package: "Surface treatment of mechanical parts" .
- Winning bidder: VINA TECH SURFACE TREAMENT TECHNOLOGY JOINT STOCK COMPANY
09/12/2025 15:03
Control, Automation in Production and Improvement of Technology Institute announced the results of the bid package Bidding package: "Set printing schedule for Tet 2026" .
- Winning bidder: Ha Noi Print And Design Joint Stock Company
08/12/2025 16:07
Control, Automation in Production and Improvement of Technology Institute announced the results of the bid package Bidding package: "Buying labor protective equipment in 2025". .
- Winning bidder: GALAXY VIETNAM SERVICES TRADING JOINT STOCK COMPANY
08/12/2025 14:52
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Control, Automation in Production and Improvement of Technology Institute has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Control, Automation in Production and Improvement of Technology Institute has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects