Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Dak lak Project Management board of Civil and Industrial Construction Works. as follows:
- Has relationships with 8 project owners.
- Has relationships with 283 contractor.
- Announced 97 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 354 contractor selection plans with a total of 1049 bidding packages, of which 130 prequalification documents have not found the investment project.
- Has invited bids for 217 packages (with 253 tender notices), and conducted prequalification for 0 packages.
- There are 6 bidding packages with content that needs clarification.
- Announced the results of 358 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 160 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 284 packages that have not fully posted the contractor selection results. Of these 281 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.37 contractors.
- Breakdown by bidding field: Goods 7.91%, Construction 41.50%, Consultancy 49.41%, Non-consultancy 1.19%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,145,075,163,551 VND, of which the total winning bid value is: 2,106,093,137,654 VND.
- The savings rate is: 1.82%.
Data analysis results of DauThau.info software for bid solicitors Dak lak Project Management board of Civil and Industrial Construction Works. as follows:
- Has relationships with 283 contractor.
- The average number of contractors participating in each bidding package is: 1.37 contractors.
- Proportion of bidding fields: Goods 7.91%, Construction 41.50%, Consulting 49.41%, Non-consulting 1.19%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,145,075,163,551 VND, in which the total winning value is: 2,106,093,137,654 VND.
- The savings rate is: 1.82%.
This Bid solicitor is also an investor. The analysis results of data for the investor Dak lak Project Management board of Civil and Industrial Construction Works. are as follows:
- Is the investor of 97 development investment projects.
- Is the investor of 232 contractor selection plans, of which 185 were self-published, and 47 were published by other entities.
- Is the investor of 182 Tender Notices, of which 156 were self-invited, and 26 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 42 bidding packages, of which 42 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 91.19% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.97% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đắk Lắk (9), Undefined (33)
- Provinces before the merger where the contractor has participated in bidding : Đắk Lắk (8), Undefined (34)
- Has relationships with 15 Bid Solicitors
- Has competed against 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 94 bidding packages with 35 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Dak lak Project Management board of Civil and Industrial Construction Works. publishes Tender Notice Survey and prepare Pre-F/S; Prepare an environmental impact assessment report in the form Open bidding .
31/12/2025 16:49
Dak lak Project Management board of Civil and Industrial Construction Works. publishes Tender Notice Procurement of remaining equipment for the Oncology Center and Infection Control Department (01 part)
Part 5: Diagnostic endoscopy equipment and other equipment in the form Open bidding .
30/12/2025 16:13
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Advice on monitoring and installation of medical equipment No. 02B: Purchasing the remaining equipment for the Cancer Center and the Department of Bacterial Infection Control .
- Winning bidder: HS GROUP CONSULTING AND INVESTMENT COMPANY LIMITED
30/12/2025 13:44
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Procurement of remaining equipment for the Oncology Center and Infection Control Department (including 02 separate parts) .
- Winning bidder: CÔNG TY TNHH TRANG THIẾT BỊ Y TẾ ĐẠI PHÚC
30/12/2025 11:13
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Procurement and installation of radio and television technical equipment .
- Winning bidder: MEDIA - BROADCAST TECHNOLOGY COMPANY LIMITED
29/12/2025 15:07
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Construction insurance for construction package number 02 .
- Winning bidder: BaoViet Insurance Corporation
26/12/2025 18:28
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Construction supervision No. 02 (including items: New construction investment projects; Auxiliary works and remaining technical infrastructure) .
- Winning bidder: SONG HOANG CONSTRUCTION CONSULTING LIMITED COMPANY
26/12/2025 18:25
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Construction and installation of equipment accompanying construction No. 02 (including items: New construction investment projects; Auxiliary works and remaining technical infrastructure) .
- Winning bidder: CUU LONG ARCHITECTURAL AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
26/12/2025 18:15
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Supervision of construction and installation of equipment accompanying construction No. 02 (including items: New construction investment projects; Auxiliary works and remaining technical infrastructure) .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG 66
26/12/2025 17:57
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Construction and installation of equipment accompanying construction No. 02 (including items: New construction investment projects; Auxiliary works and remaining technical infrastructure) .
- Winning bidder: CÔNG TY TNHH ĐTXD AN THUẬN PHÁT
26/12/2025 17:50
The data sheet has been partially hidden, to see the full information please Login or Register
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Construction insurance .
- Winning bidder: BaoViet Insurance Corporation
25/09/2025 14:53
Dak lak Project Management board of Civil and Industrial Construction Works. publishes the plan Hoa Phu Industrial Park Concentration Treatment Plant (phase 2) with 9 bidding package .
09/09/2025 10:47
Dak lak Project Management board of Civil and Industrial Construction Works. publishes the plan Adjust the content of a number of bidding packages under the plan of selecting contractors of leveling, compensation and investment in some roads (CN2, CN3, CN4 extended and CN12) - Hoa Phu Industrial Park - some additional bidding packages with 4 bidding package .
30/06/2025 09:15
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Bidding package of medical equipment No. 02A: shopping for equipment for the Cancer Center (Simulation CT system and bone radial machine) .
- Winning bidder: VIET MY MEDICAL INVESTMENT JOINT STOCK COMPANY
11/06/2025 16:01
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Repairing the headquarters of the Management Board of Construction and Industrial Construction Projects of the province .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HOÀNG TY
06/06/2025 14:54
Dak lak Project Management board of Civil and Industrial Construction Works. publishes the plan Regarding the approval of the planning of the plan: Repairing the office of the Management Board of the Project on Construction of Civil and Industrial works in Dak Lak province; Category: Paint the concrete yard with 1 bidding package .
06/06/2025 14:50
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Equipment procurement supervision consulting .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG NHÀ VIỆT
05/06/2025 14:43
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Equipment Purchasing .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ VÀ XÂY DỰNG TRẦN GIA PHÁT
05/06/2025 14:36
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Medical equipment installation supervision consultation No. 02a: Procurement of equipment for the Oncology Center (CT simulation system and bone scan machine) .
- Winning bidder: HS GROUP CONSULTING AND INVESTMENT COMPANY LIMITED, TRADING AND CONSULTING CONSTRUCTION JOINT STOCK COMPANY
28/05/2025 16:15
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Verification of construction drawing design .
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC ĐẦU TƯ XÂY DỰNG PHÚ THỊNH, CÔNG TY TNHH MỘT THÀNH VIÊN LTC
20/05/2025 11:14
The data sheet has been partially hidden, to see the full information please Login or Register
Dak lak Project Management board of Civil and Industrial Construction Works. publishes Tender Notice Survey and prepare Pre-F/S; Prepare an environmental impact assessment report in the form Open bidding .
31/12/2025 16:49
Dak lak Project Management board of Civil and Industrial Construction Works. publishes Tender Notice Procurement of remaining equipment for the Oncology Center and Infection Control Department (01 part)
Part 5: Diagnostic endoscopy equipment and other equipment in the form Open bidding .
30/12/2025 16:13
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Advice on monitoring and installation of medical equipment No. 02B: Purchasing the remaining equipment for the Cancer Center and the Department of Bacterial Infection Control .
- Winning bidder: HS GROUP CONSULTING AND INVESTMENT COMPANY LIMITED
30/12/2025 13:44
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Procurement of remaining equipment for the Oncology Center and Infection Control Department (including 02 separate parts) .
- Winning bidder: CÔNG TY TNHH TRANG THIẾT BỊ Y TẾ ĐẠI PHÚC
30/12/2025 11:13
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Procurement and installation of radio and television technical equipment .
- Winning bidder: MEDIA - BROADCAST TECHNOLOGY COMPANY LIMITED
29/12/2025 15:07
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Construction insurance for construction package number 02 .
- Winning bidder: BaoViet Insurance Corporation
26/12/2025 18:28
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Construction supervision No. 02 (including items: New construction investment projects; Auxiliary works and remaining technical infrastructure) .
- Winning bidder: SONG HOANG CONSTRUCTION CONSULTING LIMITED COMPANY
26/12/2025 18:25
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Construction and installation of equipment accompanying construction No. 02 (including items: New construction investment projects; Auxiliary works and remaining technical infrastructure) .
- Winning bidder: CUU LONG ARCHITECTURAL AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
26/12/2025 18:15
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Supervision of construction and installation of equipment accompanying construction No. 02 (including items: New construction investment projects; Auxiliary works and remaining technical infrastructure) .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG 66
26/12/2025 17:57
Dak lak Project Management board of Civil and Industrial Construction Works. announced the results of the bid package Construction and installation of equipment accompanying construction No. 02 (including items: New construction investment projects; Auxiliary works and remaining technical infrastructure) .
- Winning bidder: CÔNG TY TNHH ĐTXD AN THUẬN PHÁT
26/12/2025 17:50
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Dak lak Project Management board of Civil and Industrial Construction Works. has posted 354 of the contractor selection plan, which contains 1049 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Dak lak Project Management board of Civil and Industrial Construction Works. has posted 253 Tender Notices in 217 bidding packages. Among these, 161 Tender Notices were self-invited, and 92 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Dak lak Project Management board of Civil and Industrial Construction Works. has posted 358 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 358 package, canceled the bid 0 package (among the bidding packages above).
- There are 160 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Dak lak Project Management board of Civil and Industrial Construction Works. has a relationship with 283 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Dak lak Project Management board of Civil and Industrial Construction Works. has a relationship with 71 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Dak lak Project Management board of Civil and Industrial Construction Works. has a relationship with 12 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects