Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY as follows:
- Has relationships with 1 project owners.
- Has relationships with 27 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 30 contractor selection plans with a total of 41 bidding packages, of which 30 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 33 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 31 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 8 packages that have not fully posted the contractor selection results. Of these 8 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 50.00%, Construction 0%, Consultancy 0%, Non-consultancy 50.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,718,822,832 VND, of which the total winning bid value is: 2,711,579,832 VND.
- The savings rate is: 0.27%.
Data analysis results of DauThau.info software for bid solicitors HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY as follows:
- Has relationships with 27 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 50.00%, Construction 0%, Consulting 0%, Non-consulting 50.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,718,822,832 VND, in which the total winning value is: 2,711,579,832 VND.
- The savings rate is: 0.27%.
This Bid solicitor is also an investor. The analysis results of data for the investor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 38 contractor selection plans, of which 26 were self-published, and 12 were published by other entities.
- Is the investor of 6 Tender Notices, of which 2 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Providing software maintenance services, managing fee collection for using infrastructure works, service works, and public utilities in the Hai Phong seaport border gate area .
- Winning bidder: THAI SON TECHNOLOGY DEVELOPMENT COMPANY LIMITED
08/01/2026 16:49
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY publishes the plan Providing software maintenance services, managing fee collection for using infrastructure works, service works, and public utilities in the Hai Phong seaport border gate area with 1 bidding package .
08/01/2026 16:42
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Repair speedboat HP-3788 .
- Winning bidder: HONG AN EQUIPMENT COMPANY LIMITED
17/12/2025 18:27
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY publishes the plan Repair speedboat HP-3788 with 1 bidding package .
17/12/2025 18:21
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Bidding package No. 01: Renting data transmission channel services to serve the collection of fees for using public services and utilities in the Hai Phong seaport border gate area in 2026 .
- Winning bidder: VNNET TELECOMMUNICATION JOINT STOCK COMPANY
01/12/2025 09:05
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Shopping for Konica Minolta Bizhub 451i photocopier .
- Winning bidder: Công ty TNHH Thiết bị văn phòng Hoàng Long
27/11/2025 09:49
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY publishes the plan Shopping for Konica Minolta Bizhub 451i photocopier with 1 bidding package .
27/11/2025 09:35
The Bid solicitor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has posted the results of the bidding package Training on State management of inland water transport of the investor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY.
- Winning bidder: Công ty cổ phần dịch vụ vận tải và thương mại N.H.T
11/11/2025 14:44
The Bid solicitor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has posted the request Training on State management of inland water transport of the investor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY with 1 bidding package.
11/11/2025 14:40
The Bid solicitor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has posted the results of the bidding package Training on law and customs operations of the investor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY.
- Winning bidder: Công ty cổ phần dịch vụ vận tải và thương mại N.H.T
11/11/2025 14:33
The data sheet has been partially hidden, to see the full information please Login or Register
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Training on State management of inland water transport .
- Winning bidder: Công ty cổ phần dịch vụ vận tải và thương mại N.H.T
11/11/2025 14:44
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY publishes the plan Training on State management of inland water transport with 1 bidding package .
11/11/2025 14:40
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Training on law and customs operations .
- Winning bidder: Công ty cổ phần dịch vụ vận tải và thương mại N.H.T
11/11/2025 14:33
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY publishes the plan Training on law and customs operations with 1 bidding package .
11/11/2025 14:26
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Package No. 3: Construction supervision .
- Winning bidder: TFC VIET NAM INVESTMENT CONSULTANCY COMPANY LIMITED
11/09/2025 09:45
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Package No. 4: Project Management .
- Winning bidder: MT9 TECHNOLOGY JOINT STOCK COMPANY
01/08/2025 16:02
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Package 01: Prepare bidding documents, evaluate bids .
- Winning bidder: Công ty Cổ phần Tư vấn Hoàng Cường
01/08/2025 15:53
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY publishes the plan Maintenance, technical support hardware server System collection system of Hai Phong seaport infrastructure with 4 bidding package .
08/07/2025 08:55
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Shopping in 2025 .
- Winning bidder: CN Công ty CPTM đầu tư và xây dựng HP - Trung tâm DVTM và May đo số 3
04/07/2025 14:35
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY publishes the plan Shopping in 2025 with 1 bidding package .
04/07/2025 10:53
The data sheet has been partially hidden, to see the full information please Login or Register
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Providing software maintenance services, managing fee collection for using infrastructure works, service works, and public utilities in the Hai Phong seaport border gate area .
- Winning bidder: THAI SON TECHNOLOGY DEVELOPMENT COMPANY LIMITED
08/01/2026 16:49
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY publishes the plan Providing software maintenance services, managing fee collection for using infrastructure works, service works, and public utilities in the Hai Phong seaport border gate area with 1 bidding package .
08/01/2026 16:42
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Repair speedboat HP-3788 .
- Winning bidder: HONG AN EQUIPMENT COMPANY LIMITED
17/12/2025 18:27
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY publishes the plan Repair speedboat HP-3788 with 1 bidding package .
17/12/2025 18:21
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Bidding package No. 01: Renting data transmission channel services to serve the collection of fees for using public services and utilities in the Hai Phong seaport border gate area in 2026 .
- Winning bidder: VNNET TELECOMMUNICATION JOINT STOCK COMPANY
01/12/2025 09:05
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY announced the results of the bid package Shopping for Konica Minolta Bizhub 451i photocopier .
- Winning bidder: Công ty TNHH Thiết bị văn phòng Hoàng Long
27/11/2025 09:49
HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY publishes the plan Shopping for Konica Minolta Bizhub 451i photocopier with 1 bidding package .
27/11/2025 09:35
The Bid solicitor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has posted the results of the bidding package Training on State management of inland water transport of the investor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY.
- Winning bidder: Công ty cổ phần dịch vụ vận tải và thương mại N.H.T
11/11/2025 14:44
The Bid solicitor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has posted the request Training on State management of inland water transport of the investor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY with 1 bidding package.
11/11/2025 14:40
The Bid solicitor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has posted the results of the bidding package Training on law and customs operations of the investor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY.
- Winning bidder: Công ty cổ phần dịch vụ vận tải và thương mại N.H.T
11/11/2025 14:33
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has posted 30 of the contractor selection plan, which contains 41 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has posted 2 Tender Notices in 2 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has posted 33 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 33 package, canceled the bid 0 package (among the bidding packages above).
- There are 31 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has a relationship with 27 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity HAI PHONG CITY INLAND WATERWAY PORT AUTHORITY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects