Data analysis results of DauThau.info software for bid solicitors Hai Phong Bridge Projects Management Department as follows:
- Has relationships with 3 project owners.
- Has relationships with 233 contractor.
- Announced 55 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 163 contractor selection plans with a total of 563 bidding packages, of which 68 prequalification documents have not found the investment project.
- Has invited bids for 179 packages (with 201 tender notices), and conducted prequalification for 1 packages.
- There are 12 bidding packages with content that needs clarification.
- Announced the results of 456 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 289 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 120 packages that have not fully posted the contractor selection results. Of these 117 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.47 contractors.
- Breakdown by bidding field: Goods 1.00%, Construction 30.85%, Consultancy 61.19%, Non-consultancy 6.97%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 17,131,894,790,410 VND, of which the total winning bid value is: 15,641,853,964,566 VND.
- The savings rate is: 8.70%.
Data analysis results of DauThau.info software for bid solicitors Hai Phong Bridge Projects Management Department as follows:
- Has relationships with 233 contractor.
- The average number of contractors participating in each bidding package is: 1.47 contractors.
- Proportion of bidding fields: Goods 1.00%, Construction 30.85%, Consulting 61.19%, Non-consulting 6.97%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 17,131,894,790,410 VND, in which the total winning value is: 15,641,853,964,566 VND.
- The savings rate is: 8.70%.
This Bid solicitor is also an investor. The analysis results of data for the investor Hai Phong Bridge Projects Management Department are as follows:
- Is the investor of 55 development investment projects.
- Is the investor of 184 contractor selection plans, of which 127 were self-published, and 57 were published by other entities.
- Is the investor of 228 Tender Notices, of which 186 were self-invited, and 42 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 15: Consulting and supervision of surveying the design and implementation steps after the basic design .
- Winning bidder: HAIPHONG TRANSPORT & COMMUNICATION CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY
06/01/2026 17:55
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 13: Consulting to verify tasks and estimates of consulting bidding packages .
- Winning bidder: TAN PHONG ENGINEERING & CONSTRUCTION JOINT STOCK COMAPNY
06/01/2026 17:45
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 12: Consulting on setting up tasks and estimates for consulting bidding packages .
- Winning bidder: VITEC ENGINEERING JOINT STOCK COMPANY
06/01/2026 17:37
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 13: Consulting to verify tasks and estimates of consulting bidding packages .
- Winning bidder: CONSULTANCY AND CONSTRUCTION LIMITED COMPANY OF UNIVERSITY OF TRANSPORT AND COMMUNICATIONS
06/01/2026 08:58
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 12: Consulting on setting up tasks and estimates for consulting bidding packages .
- Winning bidder: AIRPORT DESIGN AND CONSTRUCTION CONSULTANCY ONE MEMBER LIMITED LIABILITY COMPANY ADCC
06/01/2026 08:53
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 8: Construction work .
- Winning bidder: HAI PHONG URBAN CONSTRUCTION JOINT STOCK COMPANY (HUCOM)
05/01/2026 18:19
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 11: Consulting on preparing construction drawing design documents .
- Winning bidder: HAIPHONG TRANSPORT & COMMUNICATION CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY
05/01/2026 18:13
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 1: Consulting on task setting and cost estimates of consulting work during the project preparation phase .
- Winning bidder: TAN PHONG ENGINEERING & CONSTRUCTION JOINT STOCK COMAPNY
01/01/2026 16:02
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 2: Consulting on task verification and cost estimates of consulting work during the project preparation phase .
- Winning bidder: VITEC ENGINEERING JOINT STOCK COMPANY
01/01/2026 15:59
Hai Phong Bridge Projects Management Department publishes the plan KHLCNT prepares Ninh Binh - Hai Phong Expressway Project (CT08) to complete the expressway and connect to provincial road 353 (21.7km) with 2 bidding package .
01/01/2026 15:41
The data sheet has been partially hidden, to see the full information please Login or Register
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 33: Independent audit consultancy .
- Winning bidder: KDG VIET NAM AUDITING COMPANY LIMITED
09/12/2025 11:41
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 31: Consulting on traffic safety verification .
- Winning bidder: CONSULTANCY AND CONSTRUCTION LIMITED COMPANY OF UNIVERSITY OF TRANSPORT AND COMMUNICATIONS
09/12/2025 11:25
Hai Phong Bridge Projects Management Department publishes the plan KHLCNT Construction Nguyen Trai Bridge with 21 bidding package .
30/11/2025 09:17
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 21: Control experiments during the construction process .
- Winning bidder: BACH DANG TESTING SURVEY AND CONSTRUCTION JOINT STOCK COMPANY
10/10/2025 18:25
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package 13: Environmental monitoring and monitoring consultancy during the construction process .
- Winning bidder: HAI VIET ENVIRONMENT TECHNOLOGY JOINT STOCK COMPANY
03/10/2025 14:42
Hai Phong Bridge Projects Management Department announced the results of the bid package Package 23: Independent audit consultancy .
- Winning bidder: VIETNAM AVN AUDITING LIMITED COMPANY
16/09/2025 20:43
Hai Phong Bridge Projects Management Department announced the results of the bid package Package 18: Auditing Consulting .
- Winning bidder: THAI DUONG AUDIT COMPANY LIMITED
16/09/2025 20:40
Hai Phong Bridge Projects Management Department publishes the plan KHLCNT implements investment projects on construction of roads from provincial road 354 Tien Lang district to Highway 10 of Vinh Bao district with 15 bidding package .
15/09/2025 12:04
Hai Phong Bridge Projects Management Department publishes the plan KHLCNT the remaining bidding packages of the project of overpass and the route to the bridge with 5 bidding package .
11/09/2025 08:44
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 7: Valuation of recovery materials .
- Winning bidder: VIET NAM VALUATION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY
25/08/2025 15:50
The data sheet has been partially hidden, to see the full information please Login or Register
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 15: Consulting and supervision of surveying the design and implementation steps after the basic design .
- Winning bidder: HAIPHONG TRANSPORT & COMMUNICATION CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY
06/01/2026 17:55
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 13: Consulting to verify tasks and estimates of consulting bidding packages .
- Winning bidder: TAN PHONG ENGINEERING & CONSTRUCTION JOINT STOCK COMAPNY
06/01/2026 17:45
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 12: Consulting on setting up tasks and estimates for consulting bidding packages .
- Winning bidder: VITEC ENGINEERING JOINT STOCK COMPANY
06/01/2026 17:37
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 13: Consulting to verify tasks and estimates of consulting bidding packages .
- Winning bidder: CONSULTANCY AND CONSTRUCTION LIMITED COMPANY OF UNIVERSITY OF TRANSPORT AND COMMUNICATIONS
06/01/2026 08:58
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 12: Consulting on setting up tasks and estimates for consulting bidding packages .
- Winning bidder: AIRPORT DESIGN AND CONSTRUCTION CONSULTANCY ONE MEMBER LIMITED LIABILITY COMPANY ADCC
06/01/2026 08:53
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 8: Construction work .
- Winning bidder: HAI PHONG URBAN CONSTRUCTION JOINT STOCK COMPANY (HUCOM)
05/01/2026 18:19
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 11: Consulting on preparing construction drawing design documents .
- Winning bidder: HAIPHONG TRANSPORT & COMMUNICATION CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY
05/01/2026 18:13
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 1: Consulting on task setting and cost estimates of consulting work during the project preparation phase .
- Winning bidder: TAN PHONG ENGINEERING & CONSTRUCTION JOINT STOCK COMAPNY
01/01/2026 16:02
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package No. 2: Consulting on task verification and cost estimates of consulting work during the project preparation phase .
- Winning bidder: VITEC ENGINEERING JOINT STOCK COMPANY
01/01/2026 15:59
Hai Phong Bridge Projects Management Department publishes the plan KHLCNT prepares Ninh Binh - Hai Phong Expressway Project (CT08) to complete the expressway and connect to provincial road 353 (21.7km) with 2 bidding package .
01/01/2026 15:41
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Hai Phong Bridge Projects Management Department has posted 163 of the contractor selection plan, which contains 563 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hai Phong Bridge Projects Management Department posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Hai Phong Bridge Projects Management Department has posted 201 Tender Notices in 179 bidding packages. Among these, 187 Tender Notices were self-invited, and 14 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hai Phong Bridge Projects Management Department has posted 456 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 456 package, canceled the bid 0 package (among the bidding packages above).
- There are 289 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Hai Phong Bridge Projects Management Department has a relationship with 233 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hai Phong Bridge Projects Management Department has a relationship with 74 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Hai Phong Bridge Projects Management Department has a relationship with 5 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects