Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Infrastructure and Medical Device Administration (IMDA) as follows:
- Has relationships with 1 project owners.
- Has relationships with 13 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 7 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 100.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,088,178,353 VND, of which the total winning bid value is: 2,061,685,000 VND.
- The savings rate is: 1.27%.
Data analysis results of DauThau.info software for bid solicitors Infrastructure and Medical Device Administration (IMDA) as follows:
- Has relationships with 13 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 100.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,088,178,353 VND, in which the total winning value is: 2,061,685,000 VND.
- The savings rate is: 1.27%.
This Bid solicitor is also an investor. The analysis results of data for the investor Infrastructure and Medical Device Administration (IMDA) are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 8 contractor selection plans, of which 4 were self-published, and 4 were published by other entities.
- Is the investor of 4 Tender Notices, of which 2 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package XD01/2025: Construction, renovation and repair .
- Winning bidder: HANSSEM VIET NAM JOINT STOCK COMPANY
24/11/2025 23:02
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package TV01/2025: Construction supervision consultancy for XD01/2025 package .
- Winning bidder: CONSTRUCTION SURVEY AND CONSULTANCY VERIFY JOINT STOCK COMPANY
24/11/2025 22:56
Infrastructure and Medical Device Administration (IMDA) publishes Tender Notice XD01/2025: Construction, renovation and repair in the form Open bidding .
05/11/2025 14:58
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package TV03/2025: Consulting on EHSMT appraisal and LCNT results for XD01/2025 bidding package .
- Winning bidder: CONSTRUCTION SURVEY AND CONSULTANCY VERIFY JOINT STOCK COMPANY
31/10/2025 16:16
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package TV02/2025: Consulting on preparing E-Bidding Documents and evaluating bidding documents for bidding package XD01/2025 .
- Winning bidder: VIET NAM INSTALLATION CONSTRUCTION, CONSULTANT JOINT STOCK COMPANY
31/10/2025 16:07
Infrastructure and Medical Device Administration (IMDA) publishes the plan Contractor selection plan for 2025 of the Project: Renovating and repairing floors 7, 8, 9 of a 9-storey building, lane 135 Nui Truc from the budget allocated in 2025 with 4 bidding package .
30/10/2025 09:32
Investor Infrastructure and Medical Device Administration (IMDA) has posted an investment and development project Project to renovate and repair floors 7, 8, 9 of a 9-storey building, lane 135 Nui Truc from the budget allocated in 2025..
22/10/2025 15:15
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package Package 1: Providing services to wish "Conference on classification of medical equipment in Hue City and Hanoi City" .
- Winning bidder: HOA BINH INTERNATIONAL TOURISM AND TRADING INVESTMENT COMPANY LIMITED
09/10/2025 09:36
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package Consulting verification of construction investment reports for construction works .
- Winning bidder: CONSTRUCTION SURVEY AND CONSULTANCY VERIFY JOINT STOCK COMPANY
03/10/2025 09:14
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package Consulting to prepare a construction investment report on construction works .
- Winning bidder: VIET NAM INSTALLATION CONSTRUCTION, CONSULTANT JOINT STOCK COMPANY
19/09/2025 09:18
The data sheet has been partially hidden, to see the full information please Login or Register
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package Package 03: Hiring a unit of management, operation and maintenance of online public service management system .
- Winning bidder: Công ty Cổ phần Giải pháp và Kết nối Công nghệ, DTT Technology Joint Stock Company
27/06/2025 15:32
Infrastructure and Medical Device Administration (IMDA) announced the results of the bidding package Package 03: Hiring a unit to manage, operate, and maintain an online public service system for medical equipment management with 1 participating contractors .
22/01/2025 15:50
Infrastructure and Medical Device Administration (IMDA) publishes Tender Notice Package 03: Hiring a unit to manage, operate, and maintain an online public service system for medical equipment management in the form Open bidding .
13/01/2025 17:02
Infrastructure and Medical Device Administration (IMDA) publishes the plan Operate the online public service system on medical equipment management of the Department of Infrastructure and Medical Equipment with 3 bidding package .
09/12/2024 11:44
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package Consultancy on appraisal of tender documents and contractor selection .
- Winning bidder: VIET NAM THIEN MY COMPANY LIMITED
13/09/2024 12:00
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ GIÁM SÁT VIỆT NAM
13/09/2024 11:58
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package Providing services for organizing Business Dialogue Conference and training on medical facility and medical equipment management in 2024 .
- Winning bidder: HOA BINH INTERNATIONAL TOURISM AND TRADING INVESTMENT COMPANY LIMITED
09/07/2024 12:17
Infrastructure and Medical Device Administration (IMDA) announced the results of the bidding package Providing services for organizing Business Dialogue Conference and training on medical facility and medical equipment management in 2024 with 2 participating contractors .
28/06/2024 09:06
Infrastructure and Medical Device Administration (IMDA) publishes Tender Notice Providing services for organizing Business Dialogue Conference and training on medical facility and medical equipment management in 2024 in the form Open bidding .
18/06/2024 21:36
Infrastructure and Medical Device Administration (IMDA) publishes the plan Providing services for organizing Business Dialogue Conferences and training on medical facility and medical equipment management in 2024 with 3 bidding package .
12/06/2024 16:05
The data sheet has been partially hidden, to see the full information please Login or Register
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package XD01/2025: Construction, renovation and repair .
- Winning bidder: HANSSEM VIET NAM JOINT STOCK COMPANY
24/11/2025 23:02
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package TV01/2025: Construction supervision consultancy for XD01/2025 package .
- Winning bidder: CONSTRUCTION SURVEY AND CONSULTANCY VERIFY JOINT STOCK COMPANY
24/11/2025 22:56
Infrastructure and Medical Device Administration (IMDA) publishes Tender Notice XD01/2025: Construction, renovation and repair in the form Open bidding .
05/11/2025 14:58
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package TV03/2025: Consulting on EHSMT appraisal and LCNT results for XD01/2025 bidding package .
- Winning bidder: CONSTRUCTION SURVEY AND CONSULTANCY VERIFY JOINT STOCK COMPANY
31/10/2025 16:16
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package TV02/2025: Consulting on preparing E-Bidding Documents and evaluating bidding documents for bidding package XD01/2025 .
- Winning bidder: VIET NAM INSTALLATION CONSTRUCTION, CONSULTANT JOINT STOCK COMPANY
31/10/2025 16:07
Infrastructure and Medical Device Administration (IMDA) publishes the plan Contractor selection plan for 2025 of the Project: Renovating and repairing floors 7, 8, 9 of a 9-storey building, lane 135 Nui Truc from the budget allocated in 2025 with 4 bidding package .
30/10/2025 09:32
Investor Infrastructure and Medical Device Administration (IMDA) has posted an investment and development project Project to renovate and repair floors 7, 8, 9 of a 9-storey building, lane 135 Nui Truc from the budget allocated in 2025..
22/10/2025 15:15
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package Package 1: Providing services to wish "Conference on classification of medical equipment in Hue City and Hanoi City" .
- Winning bidder: HOA BINH INTERNATIONAL TOURISM AND TRADING INVESTMENT COMPANY LIMITED
09/10/2025 09:36
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package Consulting verification of construction investment reports for construction works .
- Winning bidder: CONSTRUCTION SURVEY AND CONSULTANCY VERIFY JOINT STOCK COMPANY
03/10/2025 09:14
Infrastructure and Medical Device Administration (IMDA) announced the results of the bid package Consulting to prepare a construction investment report on construction works .
- Winning bidder: VIET NAM INSTALLATION CONSTRUCTION, CONSULTANT JOINT STOCK COMPANY
19/09/2025 09:18
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Infrastructure and Medical Device Administration (IMDA) has posted 4 of the contractor selection plan, which contains 7 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Infrastructure and Medical Device Administration (IMDA) has posted 2 Tender Notices in 2 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Infrastructure and Medical Device Administration (IMDA) has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Infrastructure and Medical Device Administration (IMDA) has a relationship with 13 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Infrastructure and Medical Device Administration (IMDA) has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Infrastructure and Medical Device Administration (IMDA) has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects