Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Northern Power Corporation Contact Center as follows:
- Has relationships with 1 project owners.
- Has relationships with 47 contractor.
- Announced 10 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 76 contractor selection plans with a total of 67 bidding packages, of which 74 prequalification documents have not found the investment project.
- Has invited bids for 58 packages (with 65 tender notices), and conducted prequalification for 0 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 81 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 9 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 4 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.55 contractors.
- Breakdown by bidding field: Goods 16.92%, Construction 0%, Consultancy 3.08%, Non-consultancy 80.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 180,416,834,341 VND, of which the total winning bid value is: 172,599,961,450 VND.
- The savings rate is: 4.33%.
Data analysis results of DauThau.info software for bid solicitors Northern Power Corporation Contact Center as follows:
- Has relationships with 47 contractor.
- The average number of contractors participating in each bidding package is: 1.55 contractors.
- Proportion of bidding fields: Goods 16.92%, Construction 0%, Consulting 3.08%, Non-consulting 80.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 180,416,834,341 VND, in which the total winning value is: 172,599,961,450 VND.
- The savings rate is: 4.33%.
This Bid solicitor is also an investor. The analysis results of data for the investor Northern Power Corporation Contact Center are as follows:
- Is the investor of 10 development investment projects.
- Is the investor of 94 contractor selection plans, of which 57 were self-published, and 37 were published by other entities.
- Is the investor of 87 Tender Notices, of which 65 were self-invited, and 22 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Northern Power Corporation Contact Center announced the results of the bid package Package No. 20-NPCCC-SXP: Maintenance of Customer Relationship Management (CRM) software system in 2025 .
30/12/2025 17:19
Northern Power Corporation Contact Center announced the results of the bid package Package No. 23-NPCCC-SXP: Software system maintenance Customer care report in 2025 .
30/12/2025 17:18
Northern Power Corporation Contact Center announced the results of the bid package Package No. 25-NPCCC-: Maintenance of customer care messaging software system in 2025 .
30/12/2025 17:18
Northern Power Corporation Contact Center announced the results of the bid package Package No. 26-NPCCC-SXKD: Maintenance of teller support software system in 2025 .
- Winning bidder: AMI VIETNAM SOLUTION TECHNOLOGY JOINT STOCK COMPANY
30/12/2025 17:17
Northern Power Corporation Contact Center announced the results of the bid package Media publications, customer service media videos, and traditional video editing .
- Winning bidder: Công ty cổ phần điện ảnh và truyền hình Hocaco Việt Nam
30/12/2025 15:46
The Bid solicitor Northern Power Corporation Contact Center has posted the results of the bidding package Package No. 01-NPCCC-SXP: Organize a conference to summarize production and business work and Trade Union activities in 2024, deploy tasks and plans for 2025 of the Customer Care Center of the investor Northern Power Corporation Contact Center.
- Winning bidder: ELECTRICITY HOTEL - TOURISM AND TRADING SERVICE ONE MEMBER COMPANY LIMITED
30/12/2025 13:41
The Bid solicitor Northern Power Corporation Contact Center has posted the request Organize a conference to summarize production, business and trade union activities in 2024, deploy tasks and plans for 2025 of the Customer Care Center of the investor Northern Power Corporation Contact Center with 1 bidding package.
30/12/2025 13:36
Northern Power Corporation Contact Center announced the results of the bid package Package No. 12-NPCCC-SXKD: Training in basic knowledge of electrical engineering, power grid models, medium and low voltage power grid management, power measurement system, and electrical safety .
- Winning bidder: NORTHERN ELECTRIC POWER COLLEGE
29/12/2025 16:11
Northern Power Corporation Contact Center announced the results of the bid package Package No. 11-NPCCC-SXKD: Training in communication skills and corporate culture .
- Winning bidder: CÔNG TY CỔ PHẦN HỌC VIỆN QUẢN TRỊ HRD
29/12/2025 15:05
Northern Power Corporation Contact Center publishes the plan Organize training classes to guide skills and operations in customer service work for new telephone operators with 2 bidding package .
29/12/2025 14:56
The data sheet has been partially hidden, to see the full information please Login or Register
Northern Power Corporation Contact Center announced the results of the bid package Package No. 01-NPCCC-SXP: Organize a conference to summarize production and business work and Trade Union activities in 2024, deploy tasks and plans for 2025 of the Customer Care Center .
- Winning bidder: ELECTRICITY HOTEL - TOURISM AND TRADING SERVICE ONE MEMBER COMPANY LIMITED
30/12/2025 13:41
Northern Power Corporation Contact Center publishes the plan Organize a conference to summarize production, business and trade union activities in 2024, deploy tasks and plans for 2025 of the Customer Care Center with 1 bidding package .
30/12/2025 13:36
Northern Power Corporation Contact Center announced the results of the bid package Appraisal of items: Warranty service for server and storage systems of the backup switchboard system for the Customer Care Center; Warranty service for server systems and data storage systems of the Customer Care Center; Maintenance and technical support services for the Avaya switchboard system of the Customer Care Center .
- Winning bidder: DHA ADVISORY AND VALUATION COMPANY LIMITED
29/12/2025 11:28
Northern Power Corporation Contact Center announced the results of the bid package Equipped uniforms for employees in the Customer Customer Center in 2025 .
- Winning bidder: PHUC SON GARMENTS COMPANY LIMITED
30/07/2025 14:45
Northern Power Corporation Contact Center announced the results of the bid package Shopping, installing, replacing air conditioners, damaged at the server room 205 customer care centers in 2025 .
- Winning bidder: FAVE VIET NAM TECHNICAL AND SERVICES COMMERCIAL COMPANY LIMITED
17/06/2025 16:33
Northern Power Corporation Contact Center announced the results of the bid package Organize the Conference to summarize the results of the 10-year operation of the establishment of the Customer Care Center and the plan to coordinate with the units to implement customer care for the period 2025-2030 .
- Winning bidder: MUONG THANH GROUP JOINT STOCK COMPANY
13/06/2025 17:05
Northern Power Corporation Contact Center announced the results of the bidding package Equipped uniforms for employees in the Customer Customer Center in 2025 with 2 participating contractors .
13/06/2025 09:39
Northern Power Corporation Contact Center announced the results of the bid package The arts program welcomes the Conference to summarize the results of the 10-year operation of the establishment of the Customer Care Center and the plan to coordinate with the units to implement customer care for the period 2025-2030 .
- Winning bidder: HONG LINH TM EVENT SERVICES COMPANY LIMITED
12/06/2025 17:25
Northern Power Corporation Contact Center announced the results of the bid package 10 -year media yearbooks Customer care center accompany customers to use electricity .
- Winning bidder: H&G AN THUAN PHAT COMPANY LIMITED
12/06/2025 09:53
Northern Power Corporation Contact Center announced the results of the bid package Video of 10 -year media communication center with customers using electricity .
- Winning bidder: MAIA VIETNAM JOINT STOCK
12/06/2025 09:46
The data sheet has been partially hidden, to see the full information please Login or Register
Northern Power Corporation Contact Center announced the results of the bid package Package No. 20-NPCCC-SXP: Maintenance of Customer Relationship Management (CRM) software system in 2025 .
30/12/2025 17:19
Northern Power Corporation Contact Center announced the results of the bid package Package No. 23-NPCCC-SXP: Software system maintenance Customer care report in 2025 .
30/12/2025 17:18
Northern Power Corporation Contact Center announced the results of the bid package Package No. 25-NPCCC-: Maintenance of customer care messaging software system in 2025 .
30/12/2025 17:18
Northern Power Corporation Contact Center announced the results of the bid package Package No. 26-NPCCC-SXKD: Maintenance of teller support software system in 2025 .
- Winning bidder: AMI VIETNAM SOLUTION TECHNOLOGY JOINT STOCK COMPANY
30/12/2025 17:17
Northern Power Corporation Contact Center announced the results of the bid package Media publications, customer service media videos, and traditional video editing .
- Winning bidder: Công ty cổ phần điện ảnh và truyền hình Hocaco Việt Nam
30/12/2025 15:46
The Bid solicitor Northern Power Corporation Contact Center has posted the results of the bidding package Package No. 01-NPCCC-SXP: Organize a conference to summarize production and business work and Trade Union activities in 2024, deploy tasks and plans for 2025 of the Customer Care Center of the investor Northern Power Corporation Contact Center.
- Winning bidder: ELECTRICITY HOTEL - TOURISM AND TRADING SERVICE ONE MEMBER COMPANY LIMITED
30/12/2025 13:41
The Bid solicitor Northern Power Corporation Contact Center has posted the request Organize a conference to summarize production, business and trade union activities in 2024, deploy tasks and plans for 2025 of the Customer Care Center of the investor Northern Power Corporation Contact Center with 1 bidding package.
30/12/2025 13:36
Northern Power Corporation Contact Center announced the results of the bid package Package No. 12-NPCCC-SXKD: Training in basic knowledge of electrical engineering, power grid models, medium and low voltage power grid management, power measurement system, and electrical safety .
- Winning bidder: NORTHERN ELECTRIC POWER COLLEGE
29/12/2025 16:11
Northern Power Corporation Contact Center announced the results of the bid package Package No. 11-NPCCC-SXKD: Training in communication skills and corporate culture .
- Winning bidder: CÔNG TY CỔ PHẦN HỌC VIỆN QUẢN TRỊ HRD
29/12/2025 15:05
Northern Power Corporation Contact Center publishes the plan Organize training classes to guide skills and operations in customer service work for new telephone operators with 2 bidding package .
29/12/2025 14:56
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Northern Power Corporation Contact Center has posted 76 of the contractor selection plan, which contains 67 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Northern Power Corporation Contact Center has posted 65 Tender Notices in 58 bidding packages. Among these, 65 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Northern Power Corporation Contact Center has posted 81 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 81 package, canceled the bid 0 package (among the bidding packages above).
- There are 9 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Northern Power Corporation Contact Center has a relationship with 47 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Northern Power Corporation Contact Center has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Northern Power Corporation Contact Center has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects