Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors PETROLIMEX GIA LAI CO.LTD as follows:
- Has relationships with 46 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 70 contractor selection plans with a total of 145 bidding packages, of which 58 prequalification documents have not found the investment project.
- Has invited bids for 29 packages (with 31 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 97 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 68 packages with results that do not have tender notice or prequalification notice.
- There are 48 packages that have not fully posted the contractor selection results. Of these 48 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.38 contractors.
- Breakdown by bidding field: Goods 25.81%, Construction 58.06%, Consultancy 12.90%, Non-consultancy 3.23%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 148,241,283,022 VND, of which the total winning bid value is: 144,587,112,715 VND.
- The savings rate is: 2.47%.
Data analysis results of DauThau.info software for bid solicitors PETROLIMEX GIA LAI CO.LTD as follows:
- Has relationships with 46 contractor.
- The average number of contractors participating in each bidding package is: 1.38 contractors.
- Proportion of bidding fields: Goods 25.81%, Construction 58.06%, Consulting 12.90%, Non-consulting 3.23%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 148,241,283,022 VND, in which the total winning value is: 144,587,112,715 VND.
- The savings rate is: 2.47%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 60 Contractor selection plan in which 59 Contractor selection plan is self-published, and 1 Contractor selection plan is posted by other units.
- Being the investor of 24 bidding packages in which 24 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 5 bidding packages, of which 3 were won, 1 were lost, 1 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 72.86% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.01% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Gia Lai (4), Undefined (1)
- Has relationships with 3 Bid Solicitors
- Has competed against 8 contractors in 4 bidding packages, won 1 packages, lost 1 packages, 2 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Verification of design, construction estimate of Petrolimex-store 132 of the investor PETROLIMEX GIA LAI CO.LTD.
19/07/2023 14:01
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Completed work settlement audit of the investor PETROLIMEX GIA LAI CO.LTD.
07/03/2023 08:24
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Construction and renovation of Petrolimex-Store 44 of the investor PETROLIMEX GIA LAI CO.LTD.
05/10/2022 17:46
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Consulting to verify the design of the renovation estimate of Petrolimex-store 44 of the investor PETROLIMEX GIA LAI CO.LTD.
21/09/2022 09:16
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Construction, installation, repair and maintenance of road connections to shops and installation of sewer pipes: Petrolimex- CH 59 of the investor PETROLIMEX GIA LAI CO.LTD.
19/09/2022 14:18
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Advanced construction of 22Kv medium voltage line (DZTA) and construction and installation of 3-phase power system, Petrolimex project - Thang Hung store of the investor PETROLIMEX GIA LAI CO.LTD.
19/09/2022 14:04
Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted Tender Notice Construction and renovation of Petrolimex-Store 44 of the investor PETROLIMEX GIA LAI CO.LTD with the form National Competitive Bidding.
15/09/2022 17:25
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor PETROLIMEX GIA LAI CO.LTD.
13/09/2022 10:25
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the request Renovating Petrolimex-Store 44 of the investor PETROLIMEX GIA LAI CO.LTD with 4 bidding package.
12/09/2022 16:46
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Insurance Consultants of the investor PETROLIMEX GIA LAI CO.LTD.
07/09/2022 15:53
The data sheet has been partially hidden, to see the full information please Login or Register
PETROLIMEX GIA LAI CO.LTD announced the results of the bid package Verification of design, construction estimate of Petrolimex-store 132 .
- Winning bidder: Công ty TNHH tư vấn thiết kế xây dựng Sê San
19/07/2023 14:01
PETROLIMEX GIA LAI CO.LTD announced the results of the bid package Completed work settlement audit .
- Winning bidder: Chi nhánh – Công ty TNHH Kiểm toán TVASC Việt Nam
07/03/2023 08:24
PETROLIMEX GIA LAI CO.LTD announced the results of the bid package Construction and renovation of Petrolimex-Store 44 .
- Winning bidder: Công ty TNHH tư vấn thiết kế xây dựng Ngân Phát Gia Lai
05/10/2022 17:46
PETROLIMEX GIA LAI CO.LTD announced the results of the bidding package Construction and renovation of Petrolimex-Store 44 with 1 participating contractors .
23/09/2022 17:00
PETROLIMEX GIA LAI CO.LTD announced the results of the bid package Consulting to verify the design of the renovation estimate of Petrolimex-store 44 .
- Winning bidder: Công ty TNHH một thành viên Minh Kim Sơn
21/09/2022 09:16
PETROLIMEX GIA LAI CO.LTD announced the results of the bid package Construction, installation, repair and maintenance of road connections to shops and installation of sewer pipes: Petrolimex- CH 59 .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN QUANG ĐẠT GIA LAI
19/09/2022 14:18
PETROLIMEX GIA LAI CO.LTD announced the results of the bid package Advanced construction of 22Kv medium voltage line (DZTA) and construction and installation of 3-phase power system, Petrolimex project - Thang Hung store .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN QUANG NGHĨA GIA LAI
19/09/2022 14:04
PETROLIMEX GIA LAI CO.LTD publishes Tender Notice Construction and renovation of Petrolimex-Store 44 in the form National Competitive Bidding .
15/09/2022 17:25
PETROLIMEX GIA LAI CO.LTD announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: Công ty TNHH một thành viên tư vấn - xây dựng An Thịnh Phước Gia Lai
13/09/2022 10:25
PETROLIMEX GIA LAI CO.LTD publishes the plan Renovating Petrolimex-Store 44 with 4 bidding package .
12/09/2022 16:46
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Verification of design, construction estimate of Petrolimex-store 132 of the investor PETROLIMEX GIA LAI CO.LTD.
19/07/2023 14:01
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Completed work settlement audit of the investor PETROLIMEX GIA LAI CO.LTD.
07/03/2023 08:24
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Construction and renovation of Petrolimex-Store 44 of the investor PETROLIMEX GIA LAI CO.LTD.
05/10/2022 17:46
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Consulting to verify the design of the renovation estimate of Petrolimex-store 44 of the investor PETROLIMEX GIA LAI CO.LTD.
21/09/2022 09:16
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Construction, installation, repair and maintenance of road connections to shops and installation of sewer pipes: Petrolimex- CH 59 of the investor PETROLIMEX GIA LAI CO.LTD.
19/09/2022 14:18
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Advanced construction of 22Kv medium voltage line (DZTA) and construction and installation of 3-phase power system, Petrolimex project - Thang Hung store of the investor PETROLIMEX GIA LAI CO.LTD.
19/09/2022 14:04
Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted Tender Notice Construction and renovation of Petrolimex-Store 44 of the investor PETROLIMEX GIA LAI CO.LTD with the form National Competitive Bidding.
15/09/2022 17:25
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor PETROLIMEX GIA LAI CO.LTD.
13/09/2022 10:25
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the request Renovating Petrolimex-Store 44 of the investor PETROLIMEX GIA LAI CO.LTD with 4 bidding package.
12/09/2022 16:46
The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted the results of the bidding package Insurance Consultants of the investor PETROLIMEX GIA LAI CO.LTD.
07/09/2022 15:53
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s PETROLIMEX GIA LAI CO.LTD has posted 70 of the contractor selection plan, which contains 145 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted 31 Tender Notice in the 29 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PETROLIMEX GIA LAI CO.LTD has posted 97 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 97 package, canceled the bid 0 package (among the bidding packages above).
- There are 68 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor PETROLIMEX GIA LAI CO.LTD has a relationship with 46 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PETROLIMEX GIA LAI CO.LTD has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PETROLIMEX GIA LAI CO.LTD is the investor of 24 package, of which 24 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PETROLIMEX GIA LAI CO.LTD is the owner of 60 contractor selection plan. In which, they self-invite 59 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
Summary: Investor PETROLIMEX GIA LAI CO.LTD is an investor with 44 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code