Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors POWER TRANSMISSION COMPANY No2 as follows:
- Has relationships with 2 project owners.
- Has relationships with 70 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 48 contractor selection plans with a total of 62 bidding packages, of which 48 prequalification documents have not found the investment project.
- Has invited bids for 60 packages (with 61 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 44 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 25 packages that have not fully posted the contractor selection results. Of these 15 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.61 contractors.
- Breakdown by bidding field: Goods 29.51%, Construction 54.10%, Consultancy 0%, Non-consultancy 16.39%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 12,660,229,159 VND, of which the total winning bid value is: 11,655,362,376 VND.
- The savings rate is: 7.94%.
Data analysis results of DauThau.info software for bid solicitors POWER TRANSMISSION COMPANY No2 as follows:
- Has relationships with 70 contractor.
- The average number of contractors participating in each bidding package is: 2.61 contractors.
- Proportion of bidding fields: Goods 29.51%, Construction 54.10%, Consulting 0%, Non-consulting 16.39%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 12,660,229,159 VND, in which the total winning value is: 11,655,362,376 VND.
- The savings rate is: 7.94%.
This Bid solicitor is also an investor. The analysis results of data for the investor POWER TRANSMISSION COMPANY No2 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 2 contractor selection plans, of which 0 were self-published, and 2 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Major repair in 2017 of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
13/09/2017 10:06
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request major repair in 2016 of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
14/09/2016 10:46
The data sheet has been partially hidden, to see the full information please Login or Register
POWER TRANSMISSION COMPANY No2 announced the results of the bidding package Package 72: Construction of replacing insulation, assembling to serve the repair of 500kV and 220kV transmission lines under the management of Quang Binh Power Center with 1 participating contractors .
15/06/2022 08:53
POWER TRANSMISSION COMPANY No2 announced the results of the bidding package Tender package No 60: Repairing and renovating the site of 220kV Dong Hoi substation with 1 participating contractors .
13/06/2022 08:01
POWER TRANSMISSION COMPANY No2 announced the results of the bidding package Tender package No 57: Supplying lightning arrester for 220kV Dong Hoi TBA valve with 3 participating contractors .
06/06/2022 10:19
POWER TRANSMISSION COMPANY No2 announced the results of the bidding package Package 62: Repairing the T640 infrared heat detector belonging to the production facilities of Quang Binh Corporation with 1 participating contractors .
06/06/2022 08:04
POWER TRANSMISSION COMPANY No2 publishes Tender Notice Tender package No 57: Supplying lightning arrester for 220kV Dong Hoi TBA valve in the form National competitive bidding .
26/05/2022 17:07
POWER TRANSMISSION COMPANY No2 publishes Tender Notice Tender package No 60: Repairing and renovating the site of 220kV Dong Hoi substation in the form National competitive bidding .
26/05/2022 16:38
POWER TRANSMISSION COMPANY No2 publishes Tender Notice Package 62: Repairing the T640 infrared heat detector belonging to the production facilities of Quang Binh Corporation in the form National competitive bidding .
24/05/2022 15:05
POWER TRANSMISSION COMPANY No2 publishes the plan Major repair in 2022 (phase 2) with 4 bidding package .
13/05/2022 08:06
POWER TRANSMISSION COMPANY No2 announced the results of the bidding package Providing line protection services and 500kV line safety corridors at 574 Vung Ang-575 Da Nang and 574 Ha Tinh-574 Da Nang sections managed by Quang Binh Power Transmission with 1 participating contractors .
09/05/2022 08:01
POWER TRANSMISSION COMPANY No2 publishes Tender Notice Providing line protection services and 500kV line safety corridors at 574 Vung Ang-575 Da Nang and 574 Ha Tinh-574 Da Nang sections managed by Quang Binh Power Transmission in the form National competitive bidding .
25/04/2022 14:31
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Major repair in 2017 of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
13/09/2017 10:06
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request major repair in 2016 of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
14/09/2016 10:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s POWER TRANSMISSION COMPANY No2 has posted 48 of the contractor selection plan, which contains 62 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted 61 Tender Notices in 60 bidding packages. Among these, -3 Tender Notices were self-invited, and 64 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor POWER TRANSMISSION COMPANY No2 has a relationship with 70 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity POWER TRANSMISSION COMPANY No2 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects