Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors POWER TRANSMISSION COMPANY No2 as follows:
- Has relationships with 0 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 20 contractor selection plans with a total of 54 bidding packages, of which 20 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 54 packages that have not fully posted the contractor selection results. Of these 54 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors POWER TRANSMISSION COMPANY No2 as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Resistor KH502 TBA 500KV Da Nang under the big repair plan in 2016 of the investor POWER TRANSMISSION COMPANY No2 with 2 bidding package.
06/07/2016 09:56
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Remote control center of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
20/06/2016 11:11
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Upgrading the office, office of Power Transmission Company 2 of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
15/06/2016 11:19
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Repairing 500kV572 line grounding system Thanh My-583 Pleiku 2 (M1) of the investor POWER TRANSMISSION COMPANY No2 with 3 bidding package.
07/06/2016 16:45
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Repairing the grounding system- List of 500kV lines 572 Da Nang- 574 Thanh My (M1) of the investor POWER TRANSMISSION COMPANY No2 with 3 bidding package.
07/06/2016 16:30
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Major repair plan 2016 of the investor POWER TRANSMISSION COMPANY No2 with 5 bidding package.
06/06/2016 17:16
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Collect, exploit and secure measurement data information to complete the automatic meter reading system of ENVNNPT of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
06/06/2016 16:52
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Ngu Hanh Son 220kV station and Da Nang-District 3 220kV transmission line of the investor POWER TRANSMISSION COMPANY No2 with 4 bidding package.
02/06/2016 15:28
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Increase capacity of 220kV Hoa Khanh substation of the investor POWER TRANSMISSION COMPANY No2 with 10 bidding package.
27/05/2016 10:42
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Major Repair 2016 of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
27/05/2016 10:42
The data sheet has been partially hidden, to see the full information please Login or Register
POWER TRANSMISSION COMPANY No2 publishes the plan Resistor KH502 TBA 500KV Da Nang under the big repair plan in 2016 with 2 bidding package .
06/07/2016 09:56
POWER TRANSMISSION COMPANY No2 publishes the plan Remote control center with 1 bidding package .
20/06/2016 11:11
POWER TRANSMISSION COMPANY No2 publishes the plan Upgrading the office, office of Power Transmission Company 2 with 1 bidding package .
15/06/2016 11:19
POWER TRANSMISSION COMPANY No2 publishes the plan Repairing 500kV572 line grounding system Thanh My-583 Pleiku 2 (M1) with 3 bidding package .
07/06/2016 16:45
POWER TRANSMISSION COMPANY No2 publishes the plan Repairing the grounding system- List of 500kV lines 572 Da Nang- 574 Thanh My (M1) with 3 bidding package .
07/06/2016 16:30
POWER TRANSMISSION COMPANY No2 publishes the plan Major repair plan 2016 with 5 bidding package .
06/06/2016 17:16
POWER TRANSMISSION COMPANY No2 publishes the plan Collect, exploit and secure measurement data information to complete the automatic meter reading system of ENVNNPT with 1 bidding package .
06/06/2016 16:52
POWER TRANSMISSION COMPANY No2 publishes the plan Ngu Hanh Son 220kV station and Da Nang-District 3 220kV transmission line with 4 bidding package .
02/06/2016 15:28
POWER TRANSMISSION COMPANY No2 publishes the plan Increase capacity of 220kV Hoa Khanh substation with 10 bidding package .
27/05/2016 10:42
POWER TRANSMISSION COMPANY No2 publishes the plan Major Repair 2016 with 1 bidding package .
27/05/2016 10:42
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Resistor KH502 TBA 500KV Da Nang under the big repair plan in 2016 of the investor POWER TRANSMISSION COMPANY No2 with 2 bidding package.
06/07/2016 09:56
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Remote control center of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
20/06/2016 11:11
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Upgrading the office, office of Power Transmission Company 2 of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
15/06/2016 11:19
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Repairing 500kV572 line grounding system Thanh My-583 Pleiku 2 (M1) of the investor POWER TRANSMISSION COMPANY No2 with 3 bidding package.
07/06/2016 16:45
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Repairing the grounding system- List of 500kV lines 572 Da Nang- 574 Thanh My (M1) of the investor POWER TRANSMISSION COMPANY No2 with 3 bidding package.
07/06/2016 16:30
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Major repair plan 2016 of the investor POWER TRANSMISSION COMPANY No2 with 5 bidding package.
06/06/2016 17:16
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Collect, exploit and secure measurement data information to complete the automatic meter reading system of ENVNNPT of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
06/06/2016 16:52
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Ngu Hanh Son 220kV station and Da Nang-District 3 220kV transmission line of the investor POWER TRANSMISSION COMPANY No2 with 4 bidding package.
02/06/2016 15:28
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Increase capacity of 220kV Hoa Khanh substation of the investor POWER TRANSMISSION COMPANY No2 with 10 bidding package.
27/05/2016 10:42
The Bid solicitor POWER TRANSMISSION COMPANY No2 has posted the request Major Repair 2016 of the investor POWER TRANSMISSION COMPANY No2 with 1 bidding package.
27/05/2016 10:42
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s POWER TRANSMISSION COMPANY No2 has posted 20 of the contractor selection plan, which contains 54 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code