Data analysis results of DauThau.info software for bid solicitors Power Network Project Management Board as follows:
- Has relationships with 321 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 838 contractor selection plans with a total of 1946 bidding packages, of which 300 prequalification documents have not found the investment project.
- Has invited bids for 1439 packages (with 1581 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 1308 package, and canceled bids for 3 packages (among the packages mentioned above).
- There are 124 packages with results that do not have tender notice or prequalification notice.
- There are 973 packages that have not fully posted the contractor selection results. Of these 933 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.11 contractors.
- Breakdown by bidding field: Goods 23.09%, Construction 14.29%, Consultancy 37.25%, Non-consultancy 22.20%, Mixed 2.09%, Other fields 1.08%.
- The total value according to the packages with valid contractor selection results is: 11,165,277,713,830 VND, of which the total winning bid value is: 10,212,878,948,976 VND.
- The savings rate is: 8.53%.
Data analysis results of DauThau.info software for bid solicitors Power Network Project Management Board as follows:
- Has relationships with 321 contractor.
- The average number of contractors participating in each bidding package is: 2.11 contractors.
- Proportion of bidding fields: Goods 23.09%, Construction 14.29%, Consulting 37.25%, Non-consulting 22.20%, Mixed 2.09%, Other 1.08%.
- The total value according to the bidding package with valid IMP is: 11,165,277,713,830 VND, in which the total winning value is: 10,212,878,948,976 VND.
- The savings rate is: 8.53%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 1 investment and development projects.
- As the owner of 35 Contractor selection plan in which 33 Contractor selection plan is self-published, and 2 Contractor selection plan is posted by other units.
- Being the investor of 23 bidding packages in which 23 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 07: Supply, transport and install VTTB 110kV substation. of the investor Power Network Project Management Board.
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
13/04/2023 13:37
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 10: Supplying computer control system software, VTTB calibration experiment, configuring and connecting SCADA signals throughout the substation, measuring line parameters of the investor Power Network Project Management Board.
14/03/2023 14:59
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 08: Supply of computer control system software, VTTB calibration experiments, configuration and connection of SCADA signals throughout the TBA of the investor Power Network Project Management Board.
- Winning bidder: CÔNG TY CỔ PHẦN CÔNG NGHỆ TNG VIỆT NAM
14/03/2023 14:53
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 06: Supplying VTTB and services for installation and operation for 110kV T2 TBA transformer installation projects of the investor Power Network Project Management Board.
- Winning bidder: Công ty TNHH Nhất Nước
08/03/2023 09:23
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 06: Supply, delivery and installation of 110kV and self-use transformers. of the investor Power Network Project Management Board.
- Winning bidder: TỔNG CÔNG TY THIẾT BỊ ĐIỆN ĐÔNG ANH - CÔNG TY CỔ PHẦN
03/03/2023 15:00
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package No. 07: Experiment to calibrate station VTTB of the investor Power Network Project Management Board.
15/02/2023 09:47
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package No. 07: Experiment to calibrate station VTTB of the investor Power Network Project Management Board.
15/02/2023 09:38
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 08: Construction of 110kV . transmission lines and substations of the investor Power Network Project Management Board.
09/02/2023 15:34
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 05: Supply and installation of 110kV . transformer of the investor Power Network Project Management Board.
01/02/2023 09:24
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package NPC-KFW3-110CT-W04: Construction of 110kV Cao Thang transmission line and substation of the investor Power Network Project Management Board.
- Winning bidder: Công ty TNHH HBT Toàn Cầu
31/12/2022 00:00
The data sheet has been partially hidden, to see the full information please Login or Register
Power Network Project Management Board announced the results of the bid package Package 07: Supply, transport and install VTTB 110kV substation. .
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
13/04/2023 13:37
Power Network Project Management Board announced the results of the bid package Package 10: Supplying computer control system software, VTTB calibration experiment, configuring and connecting SCADA signals throughout the substation, measuring line parameters .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THÍ NGHIỆM ĐIỆN MIỀN BẮC, CÔNG TY CỔ PHẦN CÔNG NGHỆ GCOM
14/03/2023 14:59
Power Network Project Management Board announced the results of the bid package Package 08: Supply of computer control system software, VTTB calibration experiments, configuration and connection of SCADA signals throughout the TBA .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THÍ NGHIỆM ĐIỆN MIỀN BẮC, CÔNG TY CỔ PHẦN CÔNG NGHỆ TNG VIỆT NAM
14/03/2023 14:53
Power Network Project Management Board announced the results of the bid package Package 06: Supplying VTTB and services for installation and operation for 110kV T2 TBA transformer installation projects .
- Winning bidder: Công ty TNHH Nhất Nước
08/03/2023 09:23
Power Network Project Management Board announced the results of the bid package Package 06: Supply, delivery and installation of 110kV and self-use transformers. .
- Winning bidder: TỔNG CÔNG TY THIẾT BỊ ĐIỆN ĐÔNG ANH - CÔNG TY CỔ PHẦN
03/03/2023 15:00
Power Network Project Management Board announced the results of the bidding package Package 08: Construction of 110kV transmission line from the starting point to G16 with 2 participating contractors .
02/03/2023 09:29
Power Network Project Management Board announced the results of the bid package Package No. 07: Experiment to calibrate station VTTB .
- Winning bidder: Công ty TNHH MTV thí nghiệm điện miền Bắc
15/02/2023 09:47
Power Network Project Management Board announced the results of the bid package Package No. 07: Experiment to calibrate station VTTB .
- Winning bidder: Công ty TNHH MTV thí nghiệm điện miền Bắc
15/02/2023 09:38
Power Network Project Management Board announced the results of the bidding package Package 06: Supplying VTTB and services for installation and operation for 110kV T2 TBA transformer installation projects with 1 participating contractors .
13/02/2023 15:06
Power Network Project Management Board announced the results of the bid package Package 08: Construction of 110kV . transmission lines and substations .
- Winning bidder: Công ty TNHH HBT Toàn Cầu
09/02/2023 15:34
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 07: Supply, transport and install VTTB 110kV substation. of the investor Power Network Project Management Board.
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
13/04/2023 13:37
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 10: Supplying computer control system software, VTTB calibration experiment, configuring and connecting SCADA signals throughout the substation, measuring line parameters of the investor Power Network Project Management Board.
14/03/2023 14:59
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 08: Supply of computer control system software, VTTB calibration experiments, configuration and connection of SCADA signals throughout the TBA of the investor Power Network Project Management Board.
- Winning bidder: CÔNG TY CỔ PHẦN CÔNG NGHỆ TNG VIỆT NAM
14/03/2023 14:53
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 06: Supplying VTTB and services for installation and operation for 110kV T2 TBA transformer installation projects of the investor Power Network Project Management Board.
- Winning bidder: Công ty TNHH Nhất Nước
08/03/2023 09:23
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 06: Supply, delivery and installation of 110kV and self-use transformers. of the investor Power Network Project Management Board.
- Winning bidder: TỔNG CÔNG TY THIẾT BỊ ĐIỆN ĐÔNG ANH - CÔNG TY CỔ PHẦN
03/03/2023 15:00
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package No. 07: Experiment to calibrate station VTTB of the investor Power Network Project Management Board.
15/02/2023 09:47
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package No. 07: Experiment to calibrate station VTTB of the investor Power Network Project Management Board.
15/02/2023 09:38
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 08: Construction of 110kV . transmission lines and substations of the investor Power Network Project Management Board.
09/02/2023 15:34
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 05: Supply and installation of 110kV . transformer of the investor Power Network Project Management Board.
01/02/2023 09:24
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package NPC-KFW3-110CT-W04: Construction of 110kV Cao Thang transmission line and substation of the investor Power Network Project Management Board.
- Winning bidder: Công ty TNHH HBT Toàn Cầu
31/12/2022 00:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Power Network Project Management Board has posted 838 of the contractor selection plan, which contains 1946 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Power Network Project Management Board has posted 1581 Tender Notice in the 1439 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Power Network Project Management Board has posted 1308 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1308 package, canceled the bid 3 package (among the bidding packages above).
- There are 124 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Power Network Project Management Board has a relationship with 321 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Network Project Management Board has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Network Project Management Board is the investor of 23 package, of which 23 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Network Project Management Board is the owner of 35 contractor selection plan. In which, they self-invite 33 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
Summary: Investor Power Network Project Management Board is an investor with 244 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Network Project Management Board is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register