Data analysis results of DauThau.info software for bid solicitors Power Transmission Company No 3 as follows:
- Has relationships with 1 project owners.
- Has relationships with 289 contractor.
- Announced 27 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 48 contractor selection plans with a total of 96 bidding packages, of which 42 prequalification documents have not found the investment project.
- Has invited bids for 205 packages (with 218 tender notices), and conducted prequalification for 0 packages.
- There are 42 bidding packages with content that needs clarification.
- Announced the results of 209 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 21 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 13 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.24 contractors.
- Breakdown by bidding field: Goods 45.87%, Construction 5.05%, Consultancy 33.03%, Non-consultancy 15.60%, Mixed 0.46%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,309,044,870,846 VND, of which the total winning bid value is: 1,087,422,932,221 VND.
- The savings rate is: 16.93%.
Data analysis results of DauThau.info software for bid solicitors Power Transmission Company No 3 as follows:
- Has relationships with 289 contractor.
- The average number of contractors participating in each bidding package is: 2.24 contractors.
- Proportion of bidding fields: Goods 45.87%, Construction 5.05%, Consulting 33.03%, Non-consulting 15.60%, Mixed 0.46%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,309,044,870,846 VND, in which the total winning value is: 1,087,422,932,221 VND.
- The savings rate is: 16.93%.
This Bid solicitor is also an investor. The analysis results of data for the investor Power Transmission Company No 3 are as follows:
- Is the investor of 27 development investment projects.
- Is the investor of 26 contractor selection plans, of which 26 were self-published, and 0 were published by other entities.
- Is the investor of 428 Tender Notices, of which 181 were self-invited, and 247 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Power Transmission Company No 3 publishes Tender Notice Package 01/SCL2025/DKH: Repairing foundation embankments and drainage ditches of 220kV lines managed and operated by Khanh Hoa Power Transmission Team in the form Open bidding .
31/12/2025 19:05
Power Transmission Company No 3 publishes Tender Notice Package 5: Audit of completed project settlement report in the form Open bidding .
31/12/2025 10:54
Power Transmission Company No 3 announced the results of the bid package Package 3/SCL2026/PTC3: CONSTRUCTION CONSULTING CONSULTING CONSTRUCTION, MAKE OF KTKT KT and Estimation of Repairing System of Cable Trit's Cable Station 220KV Krong Buk .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5
31/12/2025 10:18
Power Transmission Company No 3 announced the results of the bid package Package 01/SCTX2025/DTTĐĐL: Installation of partitions and repair ditches to control 420KV Krong Buk transformer station .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG 349
28/12/2025 22:04
Power Transmission Company No 3 announced the results of the bid package Package 15/SCL2026/PTC3: Providing meter computers for 500kV Vinh Tan, 220kV Ham Tan, 220kV Phan Thiet substations (Including installation and configuration services) .
- Winning bidder: SAI GON INFORMATION AND NETWORKING TECHNOLOGY COMPANY LIMITED
26/12/2025 14:34
Investor Power Transmission Company No 3 has posted an investment and development project Equipped with a forklift forklift service for operation management, repair and troubleshooting for PTC3.
26/12/2025 11:11
Power Transmission Company No 3 publishes Tender Notice Package 35/SCL2026/PTC3: Consulting on surveys, preparing technical plans, designing construction drawings and estimating items for handling ground phase gaps of 220kV lines managed and operated by Gia Lai Power Transmission Team in the form Open bidding .
24/12/2025 17:53
Power Transmission Company No 3 announced the results of the bid package Package 11/SCL2026/PTC3: Supply of lights and accessories and materials for lighting system TBA .
- Winning bidder: CITY NUMBER ONE LIGHTING COMPANY LIMITED
23/12/2025 08:08
Power Transmission Company No 3 publishes Tender Notice Package 31/SCL2026/PTC3: Repair of Toyota Hilux car with license plate 79C-05101 - belonging to Dak Lak Traffic Management Team in the form Competitive Offer .
19/12/2025 14:00
Power Transmission Company No 3 publishes Tender Notice Package 06/SCL2026&SX/PTC3: Supply of primary equipment and accessories for 220kV, 500kV substations in the form Open bidding .
19/12/2025 07:25
The data sheet has been partially hidden, to see the full information please Login or Register
Power Transmission Company No 3 announced the results of the bid package Contract package: Procurement of 06 meters with 0.2s accuracy as backup for Vinh Tan 500kV station .
- Winning bidder: DAHA EQUIPMENT AND SCIENCE TECHNOLOGY JOINT STOCK COMPANY
15/12/2025 08:38
Power Transmission Company No 3 announced the results of the bid package 01/SCTX2025/DTTĐKH: Providing 220V DC battery .
- Winning bidder: TEKNIC TECHNOLOGY COMPANY LIMITED
03/12/2025 08:22
Power Transmission Company No 3 announced the results of the bid package Package 3: Supplying the installation of the most VTTB, secondary, configuration, construction of stations and construction insurance. .
- Winning bidder: THAI BINH DUONG CONSTRUCTION AND INSTALLTION AND INVESTMENT JOINT STOCK COMPANY
24/10/2025 16:44
Power Transmission Company No 3 announced the results of the bid package Package 06/SX2025/PTC3: Providing MBA storage .
- Winning bidder: CÔNG TY TNHH MERCURY ELECTRIK VIỆT NAM
10/10/2025 14:25
Power Transmission Company No 3 announced the results of the bid package Package 4: Providing construction supervision consultancy services and construction installation .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG SONG MÃ, CÔNG TY TNHH TƯ VẤN BÌNH MINH
30/08/2025 15:13
Power Transmission Company No 3 announced the results of the bid package Package 5: Providing construction supervision consultancy services .
- Winning bidder: CÔNG TY CỔ PHẦN TỔNG HỢP PHÚ TÀI PHÁT
28/08/2025 09:24
Power Transmission Company No 3 announced the results of the bidding package Package 3: Supplying the installation of the most VTTB, secondary, configuration, construction of stations and construction insurance. with 1 participating contractors .
18/08/2025 11:07
Power Transmission Company No 3 announced the results of the bid package Equipped with safety tools, construction tools for production in 2025 of PTC3 .
- Winning bidder: NHAT MINH INVESTMENT EXPORT IMPORT AND TECHNICAL SERVICES JOINT STOCK COMPANY
11/08/2025 16:52
Power Transmission Company No 3 announced the results of the bid package Equipped with office uniform EVNNPT in 2025 .
- Winning bidder: NHA BE GARMENT CORPORATION JOINT STOCK COMPANY
07/08/2025 11:05
Power Transmission Company No 3 announced the results of the bid package Package 2: VTTB backup for production - Line section .
- Winning bidder: VIET NAM TECHNIQUE DEVELOPMENT COMPANY LIMITED
06/08/2025 11:07
The data sheet has been partially hidden, to see the full information please Login or Register
Power Transmission Company No 3 publishes Tender Notice Package 01/SCL2025/DKH: Repairing foundation embankments and drainage ditches of 220kV lines managed and operated by Khanh Hoa Power Transmission Team in the form Open bidding .
31/12/2025 19:05
Power Transmission Company No 3 publishes Tender Notice Package 5: Audit of completed project settlement report in the form Open bidding .
31/12/2025 10:54
Power Transmission Company No 3 announced the results of the bid package Package 3/SCL2026/PTC3: CONSTRUCTION CONSULTING CONSULTING CONSTRUCTION, MAKE OF KTKT KT and Estimation of Repairing System of Cable Trit's Cable Station 220KV Krong Buk .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5
31/12/2025 10:18
Power Transmission Company No 3 announced the results of the bid package Package 01/SCTX2025/DTTĐĐL: Installation of partitions and repair ditches to control 420KV Krong Buk transformer station .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG 349
28/12/2025 22:04
Power Transmission Company No 3 announced the results of the bid package Package 15/SCL2026/PTC3: Providing meter computers for 500kV Vinh Tan, 220kV Ham Tan, 220kV Phan Thiet substations (Including installation and configuration services) .
- Winning bidder: SAI GON INFORMATION AND NETWORKING TECHNOLOGY COMPANY LIMITED
26/12/2025 14:34
Investor Power Transmission Company No 3 has posted an investment and development project Equipped with a forklift forklift service for operation management, repair and troubleshooting for PTC3.
26/12/2025 11:11
Power Transmission Company No 3 publishes Tender Notice Package 35/SCL2026/PTC3: Consulting on surveys, preparing technical plans, designing construction drawings and estimating items for handling ground phase gaps of 220kV lines managed and operated by Gia Lai Power Transmission Team in the form Open bidding .
24/12/2025 17:53
Power Transmission Company No 3 announced the results of the bid package Package 11/SCL2026/PTC3: Supply of lights and accessories and materials for lighting system TBA .
- Winning bidder: CITY NUMBER ONE LIGHTING COMPANY LIMITED
23/12/2025 08:08
Power Transmission Company No 3 publishes Tender Notice Package 31/SCL2026/PTC3: Repair of Toyota Hilux car with license plate 79C-05101 - belonging to Dak Lak Traffic Management Team in the form Competitive Offer .
19/12/2025 14:00
Power Transmission Company No 3 publishes Tender Notice Package 06/SCL2026&SX/PTC3: Supply of primary equipment and accessories for 220kV, 500kV substations in the form Open bidding .
19/12/2025 07:25
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Power Transmission Company No 3 has posted 48 of the contractor selection plan, which contains 96 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Power Transmission Company No 3 has posted 218 Tender Notices in 205 bidding packages. Among these, 181 Tender Notices were self-invited, and 37 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Power Transmission Company No 3 has posted 209 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 209 package, canceled the bid 0 package (among the bidding packages above).
- There are 21 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Power Transmission Company No 3 has a relationship with 289 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Power Transmission Company No 3 has a relationship with 35 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Power Transmission Company No 3 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects