Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Project Management Unit of Maritime and Waterway as follows:
- Has relationships with 1 project owners.
- Has relationships with 8 contractor.
- Announced 5 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 10 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 651,641,418 VND, of which the total winning bid value is: 641,041,418 VND.
- The savings rate is: 1.63%.
Data analysis results of DauThau.info software for bid solicitors Project Management Unit of Maritime and Waterway as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 651,641,418 VND, in which the total winning value is: 641,041,418 VND.
- The savings rate is: 1.63%.
This Bid solicitor is also an investor. The analysis results of data for the investor Project Management Unit of Maritime and Waterway are as follows:
- Is the investor of 5 development investment projects.
- Is the investor of 9 contractor selection plans, of which 6 were self-published, and 3 were published by other entities.
- Is the investor of 5 Tender Notices, of which 0 were self-invited, and 5 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 12 bidding packages, of which 11 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 70.7% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.7% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (3), Nationwide (2), Hải Phòng (2), An Giang (1), Huế (1), Nghệ An (1), Vĩnh Long (1), Thanh Hoá (1)
- Provinces before the merger where the contractor has participated in bidding : Kiên Giang (1), Huế (1), Nghệ An (1), Thanh Hoá (1), Undefined (9)
- Has relationships with 2 Bid Solicitors
- Has competed against 1 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 22 bidding packages with 8 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Project Management Unit of Maritime and Waterway publishes Tender Notice Package QN-TV09: Consulting on auditing and finalizing completed projects in the form Open bidding .
25/12/2025 11:33
Project Management Unit of Maritime and Waterway announced the results of the bid package TV-TTKT: Consulting in verification of technical design and estimates .
- Winning bidder: TRANSPORTATION INVESTMENT AND CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
12/11/2025 14:59
Project Management Unit of Maritime and Waterway announced the results of the bid package Bidding package CM-TV20 audit consultancy and settlement of the completed project (adjustment phase) .
- Winning bidder: TVASC VIET NAM AUDITING COMPANY LIMITED
10/11/2025 10:23
The Bid solicitor Project Management Unit of Maritime and Waterway has posted the request Supplementing the contractor selection plan for some bidding packages under the investment project to build and renovate and upgrade Quy Nhon flow for 50,000DWT ships of the investor Project Management Unit of Maritime and Waterway with 1 bidding package.
03/11/2025 16:26
Investor Project Management Unit of Maritime and Waterway has posted an investment and development project Investment and construction project to renovate and upgrade Quy Nhon channel for ships of 50,000 DWT.
03/11/2025 16:16
Project Management Unit of Maritime and Waterway publishes the plan Project to raise the air space of road bridges crossing the national inland waterway - phase 1 (southern area) with 2 bidding package .
31/10/2025 09:44
Investor Project Management Unit of Maritime and Waterway has posted an investment and development project Project to raise the air space of road bridges crossing the national inland waterway - phase 1 (southern area).
31/10/2025 09:09
Investor Project Management Unit of Maritime and Waterway has posted an investment and development project Investment project to build works to upgrade Cai Mep - Thi Vai line from the "0" buoy to the Harbor of Ben Boi Cai Mep.
29/09/2025 22:22
Project Management Unit of Maritime and Waterway publishes the plan Approving adjustment plan for contractor selection Package CM-TV20 audit consultancy and settlement of the completed project (adjustment phase) with 1 bidding package .
29/09/2025 22:20
Project Management Unit of Maritime and Waterway announced the results of the bid package Tender package No 03: Construction .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG THƯƠNG MẠI NHẬT MINH 86
24/09/2025 09:59
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Unit of Maritime and Waterway publishes the plan Supplementing the contractor selection plan for some bidding packages under the investment project to build and renovate and upgrade Quy Nhon flow for 50,000DWT ships with 1 bidding package .
03/11/2025 16:26
Project Management Unit of Maritime and Waterway publishes the plan Plan for selecting contractors of projects to develop waterway and logistics corridors in the South with 5 bidding package .
24/09/2025 08:34
Project Management Unit of Maritime and Waterway publishes the plan Plan for selecting contractors of projects to develop waterway and logistics corridors in the South with 5 bidding package .
23/09/2025 09:09
Project Management Unit of Maritime and Waterway announced the results of the bid package HL2-NCTKT consulting for pre-feasibility research reports .
- Winning bidder: CONSTRUCTION CONSULTATION JOINT STOCK COMPANY FOR MARITIME BUILDING
11/06/2025 13:53
Project Management Unit of Maritime and Waterway announced the results of the bid package Package No. 02 Examination of Economic and Technical Report .
- Winning bidder: 559 GROUP JOINT STOCK COMPANY
10/06/2025 15:43
Project Management Unit of Maritime and Waterway publishes the plan The contractor selection plan for the preparation of investment in repairing and renovating office headquarters at 308e Minh Khai, Hanoi of the Maritime and Waterway Project Management Board with 2 bidding package .
10/06/2025 15:42
Project Management Unit of Maritime and Waterway announced the results of the bid package Bidding package No. 01 prepares technical economic reports .
- Winning bidder: START VIET CONSTRUCTION AND TRADING CONSULTING JOINT STOCK COMPANY
10/06/2025 15:32
Project Management Unit of Maritime and Waterway publishes the plan The contractor selection plan for the preparation of investment in repairing and renovating office headquarters at 308e Minh Khai, Hanoi of the Maritime and Waterway Project Management Board with 2 bidding package .
03/06/2025 15:57
Project Management Unit of Maritime and Waterway publishes the plan The plan for contractor selection of consulting packages in the preparation phase of the project (pre -feasibility study) under the project of upgrading the Quang Ninh - Hai Phong - Thai Binh - Nam Dinh - Ninh Binh route through the Luoi River (waterway corridor No. 2) with 2 bidding package .
29/05/2025 09:31
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Unit of Maritime and Waterway publishes Tender Notice Package QN-TV09: Consulting on auditing and finalizing completed projects in the form Open bidding .
25/12/2025 11:33
Project Management Unit of Maritime and Waterway announced the results of the bid package TV-TTKT: Consulting in verification of technical design and estimates .
- Winning bidder: TRANSPORTATION INVESTMENT AND CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
12/11/2025 14:59
Project Management Unit of Maritime and Waterway announced the results of the bid package Bidding package CM-TV20 audit consultancy and settlement of the completed project (adjustment phase) .
- Winning bidder: TVASC VIET NAM AUDITING COMPANY LIMITED
10/11/2025 10:23
The Bid solicitor Project Management Unit of Maritime and Waterway has posted the request Supplementing the contractor selection plan for some bidding packages under the investment project to build and renovate and upgrade Quy Nhon flow for 50,000DWT ships of the investor Project Management Unit of Maritime and Waterway with 1 bidding package.
03/11/2025 16:26
Investor Project Management Unit of Maritime and Waterway has posted an investment and development project Investment and construction project to renovate and upgrade Quy Nhon channel for ships of 50,000 DWT.
03/11/2025 16:16
Project Management Unit of Maritime and Waterway publishes the plan Project to raise the air space of road bridges crossing the national inland waterway - phase 1 (southern area) with 2 bidding package .
31/10/2025 09:44
Investor Project Management Unit of Maritime and Waterway has posted an investment and development project Project to raise the air space of road bridges crossing the national inland waterway - phase 1 (southern area).
31/10/2025 09:09
Investor Project Management Unit of Maritime and Waterway has posted an investment and development project Investment project to build works to upgrade Cai Mep - Thi Vai line from the "0" buoy to the Harbor of Ben Boi Cai Mep.
29/09/2025 22:22
Project Management Unit of Maritime and Waterway publishes the plan Approving adjustment plan for contractor selection Package CM-TV20 audit consultancy and settlement of the completed project (adjustment phase) with 1 bidding package .
29/09/2025 22:20
Project Management Unit of Maritime and Waterway announced the results of the bid package Tender package No 03: Construction .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG THƯƠNG MẠI NHẬT MINH 86
24/09/2025 09:59
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project Management Unit of Maritime and Waterway has posted 6 of the contractor selection plan, which contains 10 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit of Maritime and Waterway has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project Management Unit of Maritime and Waterway has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit of Maritime and Waterway has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Project Management Unit of Maritime and Waterway has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects