Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Project management board of works in Muong Ang district as follows:
- Has relationships with 15 project owners.
- Has relationships with 119 contractor.
- Announced 196 investment development project, of which 41 projects have not yet announced the prequalification documents.
- Announced 322 contractor selection plans with a total of 749 bidding packages, of which 84 prequalification documents have not found the investment project.
- Has invited bids for 163 packages (with 179 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 537 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 418 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 438 packages that have not fully posted the contractor selection results. Of these 419 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.19 contractors.
- Breakdown by bidding field: Goods 6.15%, Construction 87.71%, Consultancy 6.15%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 536,942,497,949 VND, of which the total winning bid value is: 513,929,060,337 VND.
- The savings rate is: 4.29%.
Data analysis results of DauThau.info software for bid solicitors Project management board of works in Muong Ang district as follows:
- Has relationships with 119 contractor.
- The average number of contractors participating in each bidding package is: 1.19 contractors.
- Proportion of bidding fields: Goods 6.15%, Construction 87.71%, Consulting 6.15%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 536,942,497,949 VND, in which the total winning value is: 513,929,060,337 VND.
- The savings rate is: 4.29%.
This Bid solicitor is also an investor. The analysis results of data for the investor Project management board of works in Muong Ang district are as follows:
- Is the investor of 196 development investment projects.
- Is the investor of 155 contractor selection plans, of which 131 were self-published, and 24 were published by other entities.
- Is the investor of 178 Tender Notices, of which 141 were self-invited, and 37 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Civil Works of the investor Project management board of works in Muong Ang district.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MINH QUÝ ĐIỆN BIÊN
12/05/2025 14:48
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Civil Works of the investor Project management board of works in Muong Ang district.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẠI LÂM TỈNH ĐIỆN BIÊN
26/04/2025 16:36
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Survey monitoring of the investor Project management board of works in Muong Ang district.
11/04/2025 10:50
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Establishing the process of regulating project reservoirs: Safety, operation and exploitation of Cang water reservoirs, Muong Ang district of the investor Project management board of works in Muong Ang district.
11/04/2025 10:48
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Plug in the project to protect the project: Ensure safety, operation and exploitation of the investor Project management board of works in Muong Ang district.
11/04/2025 10:46
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Making a report for a license to exploit and use surface water: Ensuring safety, operation and exploitation of Cang water reservoirs, Muong Ang district of the investor Project management board of works in Muong Ang district.
11/04/2025 10:43
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Emergency response plan (EPP) Project: Ensuring safety, operation and exploitation of Cang water reservoirs, Muong Ang district of the investor Project management board of works in Muong Ang district.
- Winning bidder: TECHNOLOGY CONVERSION AND CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
11/04/2025 10:40
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Building project flood maps: Safety, operation and exploitation of Cang water reservoirs, Muong Ang district of the investor Project management board of works in Muong Ang district.
- Winning bidder: TECHNOLOGY CONVERSION AND CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
11/04/2025 10:38
Bid solicitor Project management board of works in Muong Ang district has posted Tender Notice Civil Works of the investor Project management board of works in Muong Ang district with the form Open bidding.
01/04/2025 17:00
Investor Project management board of works in Muong Ang district has posted an investment and development project Ensuring safety, operation and exploitation of Cang water reservoirs, Muong Ang district.
01/04/2025 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
Project management board of works in Muong Ang district announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MINH QUÝ ĐIỆN BIÊN
12/05/2025 14:48
Project management board of works in Muong Ang district announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẠI LÂM TỈNH ĐIỆN BIÊN
26/04/2025 16:36
Project management board of works in Muong Ang district announced the results of the bidding package Civil Works with 1 participating contractors .
12/04/2025 11:20
Project management board of works in Muong Ang district announced the results of the bid package Survey monitoring .
- Winning bidder: SONG KONG CONSTRUCTION AND SURVEY CONSULTING JOINT STOCK COMPANY
11/04/2025 10:50
Project management board of works in Muong Ang district announced the results of the bid package Establishing the process of regulating project reservoirs: Safety, operation and exploitation of Cang water reservoirs, Muong Ang district .
- Winning bidder: SONG KONG CONSTRUCTION AND SURVEY CONSULTING JOINT STOCK COMPANY
11/04/2025 10:48
Project management board of works in Muong Ang district announced the results of the bid package Plug in the project to protect the project: Ensure safety, operation and exploitation .
- Winning bidder: HA THANH IRRIGATION CONSTRUCTION CONSULTING JOINT STOCK COMPANY
11/04/2025 10:46
Project management board of works in Muong Ang district announced the results of the bid package Making a report for a license to exploit and use surface water: Ensuring safety, operation and exploitation of Cang water reservoirs, Muong Ang district .
- Winning bidder: SONG KONG CONSTRUCTION AND SURVEY CONSULTING JOINT STOCK COMPANY
11/04/2025 10:43
Project management board of works in Muong Ang district announced the results of the bid package Emergency response plan (EPP) Project: Ensuring safety, operation and exploitation of Cang water reservoirs, Muong Ang district .
- Winning bidder: TECHNOLOGY CONVERSION AND CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
11/04/2025 10:40
Project management board of works in Muong Ang district announced the results of the bid package Building project flood maps: Safety, operation and exploitation of Cang water reservoirs, Muong Ang district .
- Winning bidder: TECHNOLOGY CONVERSION AND CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
11/04/2025 10:38
Project management board of works in Muong Ang district announced the results of the bidding package Civil Works with 1 participating contractors .
06/04/2025 10:01
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Civil Works of the investor Project management board of works in Muong Ang district.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MINH QUÝ ĐIỆN BIÊN
12/05/2025 14:48
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Civil Works of the investor Project management board of works in Muong Ang district.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẠI LÂM TỈNH ĐIỆN BIÊN
26/04/2025 16:36
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Survey monitoring of the investor Project management board of works in Muong Ang district.
11/04/2025 10:50
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Establishing the process of regulating project reservoirs: Safety, operation and exploitation of Cang water reservoirs, Muong Ang district of the investor Project management board of works in Muong Ang district.
11/04/2025 10:48
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Plug in the project to protect the project: Ensure safety, operation and exploitation of the investor Project management board of works in Muong Ang district.
11/04/2025 10:46
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Making a report for a license to exploit and use surface water: Ensuring safety, operation and exploitation of Cang water reservoirs, Muong Ang district of the investor Project management board of works in Muong Ang district.
11/04/2025 10:43
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Emergency response plan (EPP) Project: Ensuring safety, operation and exploitation of Cang water reservoirs, Muong Ang district of the investor Project management board of works in Muong Ang district.
- Winning bidder: TECHNOLOGY CONVERSION AND CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
11/04/2025 10:40
The Bid solicitor Project management board of works in Muong Ang district has posted the results of the bidding package Building project flood maps: Safety, operation and exploitation of Cang water reservoirs, Muong Ang district of the investor Project management board of works in Muong Ang district.
- Winning bidder: TECHNOLOGY CONVERSION AND CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
11/04/2025 10:38
Bid solicitor Project management board of works in Muong Ang district has posted Tender Notice Civil Works of the investor Project management board of works in Muong Ang district with the form Open bidding.
01/04/2025 17:00
Investor Project management board of works in Muong Ang district has posted an investment and development project Ensuring safety, operation and exploitation of Cang water reservoirs, Muong Ang district.
01/04/2025 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project management board of works in Muong Ang district has posted 322 of the contractor selection plan, which contains 749 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project management board of works in Muong Ang district has posted 179 Tender Notices in 163 bidding packages. Among these, 140 Tender Notices were self-invited, and 39 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project management board of works in Muong Ang district has posted 537 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 537 package, canceled the bid 0 package (among the bidding packages above).
- There are 418 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project management board of works in Muong Ang district has a relationship with 119 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project management board of works in Muong Ang district has a relationship with 71 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Project management board of works in Muong Ang district has a relationship with 16 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects