Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Quality Assurance and Testing Center 3 as follows:
- Has relationships with 349 contractor.
- Announced 47 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 686 contractor selection plans with a total of 779 bidding packages, of which 635 prequalification documents have not found the investment project.
- Has invited bids for 382 packages (with 391 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 585 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 415 packages with results that do not have tender notice or prequalification notice.
- There are 104 packages that have not fully posted the contractor selection results. Of these 88 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.21 contractors.
- Breakdown by bidding field: Goods 70.59%, Construction 4.35%, Consultancy 0%, Non-consultancy 24.81%, Mixed 0.26%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 310,820,066,103 VND, of which the total winning bid value is: 292,149,552,864 VND.
- The savings rate is: 6.01%.
Data analysis results of DauThau.info software for bid solicitors Quality Assurance and Testing Center 3 as follows:
- Has relationships with 349 contractor.
- The average number of contractors participating in each bidding package is: 2.21 contractors.
- Proportion of bidding fields: Goods 70.59%, Construction 4.35%, Consulting 0%, Non-consulting 24.81%, Mixed 0.26%, Other 0%.
- The total value according to the bidding package with valid IMP is: 310,820,066,103 VND, in which the total winning value is: 292,149,552,864 VND.
- The savings rate is: 6.01%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 47 investment and development projects.
- As the owner of 663 Contractor selection plan in which 659 Contractor selection plan is self-published, and 4 Contractor selection plan is posted by other units.
- Being the investor of 321 bidding packages in which 310 packages are self-invited, and 11 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 250 bidding packages, of which 152 were won, 70 were lost, 19 are pending results, and 9 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 59.33% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 84.8% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: TP.Hồ Chí Minh (50), Bà Rịa - Vũng Tàu (43), Đồng Nai (13), Hà Nội (12), Lâm Đồng (11), Bình Thuận (8), Cần Thơ (7), Đắk Lắk (5), Quảng Ninh (5), Kon Tum (5), Long An (4), Bình Phước (4), Bình Dương (4), Sơn La (3), Bến Tre (3), Thái Bình (3), Thanh Hoá (2), Trà Vinh (2), Tiền Giang (2), Khánh Hòa (2), Lai Châu (2), Tuyên Quang (2), Hòa Bình (2), Gia Lai (2), Đắk Nông (2), Vĩnh Long (2), Đồng Tháp (2), Hải Phòng (1), Đà Nẵng (1), Kiên Giang (1), Quảng Ngãi (1), Undefined (65)
- Has relationships with 104 Bid Solicitors
- Has competed against 67 contractors in 123 bidding packages, won 30 packages, lost 61 packages, 29 are pending results, and 3 were canceled.
- Has collaborated with 3 contractors in 4 bidding packages, won 4 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Quality Assurance and Testing Center 3 has posted the request Provide forms for the center's regular operations in 2025 of the investor Quality Assurance and Testing Center 3 with 1 bidding package.
23/10/2024 09:31
Bid solicitor Quality Assurance and Testing Center 3 has posted Tender Notice HH - Standard chemicals of the investor Quality Assurance and Testing Center 3 with the form Open bidding.
21/10/2024 14:35
The Bid solicitor Quality Assurance and Testing Center 3 has posted the results of the bidding package HH - Testing chemicals of the investor Quality Assurance and Testing Center 3.
- Winning bidder: NAM THANH MEDICAL EQUIPMENT AND SCIENCE TECHNOLOGY COMPANY LIMITED
21/10/2024 09:30
The Bid solicitor Quality Assurance and Testing Center 3 has posted the results of the bidding package HH - Test standard of the investor Quality Assurance and Testing Center 3.
- Winning bidder: T&T SCIENTIFIC TECHNICAL MATERIALS COMPANY LIMITED
21/10/2024 09:25
The Bid solicitor Quality Assurance and Testing Center 3 has posted the results of the bidding package HH - Test circuit is not normal of the investor Quality Assurance and Testing Center 3.
- Winning bidder: Công ty TNHH Thiết bị và Công nghệ Zenta
21/10/2024 09:16
The Bid solicitor Quality Assurance and Testing Center 3 has posted the request Test circuit is abnormal of the investor Quality Assurance and Testing Center 3 with 1 bidding package.
21/10/2024 09:05
The Bid solicitor Quality Assurance and Testing Center 3 has posted the request Standard substance for organic indicators in environmental sample testing of the investor Quality Assurance and Testing Center 3 with 1 bidding package.
21/10/2024 09:01
The Bid solicitor Quality Assurance and Testing Center 3 has posted the request Chemicals for testing aerobic biodegradable packaging of the investor Quality Assurance and Testing Center 3 with 1 bidding package.
21/10/2024 08:56
The Bid solicitor Quality Assurance and Testing Center 3 has posted the results of the bidding package HH - Sand and soil sifting floors of all kinds of the investor Quality Assurance and Testing Center 3.
- Winning bidder: THIEN Y SCIENTIFIC EQUIPMENT CO.,LTD
18/10/2024 17:01
The Bid solicitor Quality Assurance and Testing Center 3 has posted the request The floor sifts sand and soil of all kinds of the investor Quality Assurance and Testing Center 3 with 1 bidding package.
18/10/2024 16:45
The data sheet has been partially hidden, to see the full information please Login or Register
Quality Assurance and Testing Center 3 publishes the plan Provide forms for the center's regular operations in 2025 with 1 bidding package .
23/10/2024 09:31
Quality Assurance and Testing Center 3 publishes Tender Notice HH - Standard chemicals in the form Open bidding .
21/10/2024 14:35
Quality Assurance and Testing Center 3 announced the results of the bidding package PTV - Rent an Ion chromatography system coupled with an electrochemical detector with 1 participating contractors .
21/10/2024 09:33
Quality Assurance and Testing Center 3 announced the results of the bid package HH - Testing chemicals .
- Winning bidder: NAM THANH MEDICAL EQUIPMENT AND SCIENCE TECHNOLOGY COMPANY LIMITED
21/10/2024 09:30
Quality Assurance and Testing Center 3 announced the results of the bid package HH - Test standard .
- Winning bidder: T&T SCIENTIFIC TECHNICAL MATERIALS COMPANY LIMITED
21/10/2024 09:25
Quality Assurance and Testing Center 3 announced the results of the bid package HH - Test circuit is not normal .
- Winning bidder: Công ty TNHH Thiết bị và Công nghệ Zenta
21/10/2024 09:16
Quality Assurance and Testing Center 3 publishes the plan Test circuit is abnormal with 1 bidding package .
21/10/2024 09:05
Quality Assurance and Testing Center 3 publishes the plan Standard substance for organic indicators in environmental sample testing with 1 bidding package .
21/10/2024 09:01
Quality Assurance and Testing Center 3 publishes the plan Chemicals for testing aerobic biodegradable packaging with 1 bidding package .
21/10/2024 08:56
Quality Assurance and Testing Center 3 announced the results of the bid package HH - Sand and soil sifting floors of all kinds .
- Winning bidder: THIEN Y SCIENTIFIC EQUIPMENT CO.,LTD
18/10/2024 17:01
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Quality Assurance and Testing Center 3 has posted the request Provide forms for the center's regular operations in 2025 of the investor Quality Assurance and Testing Center 3 with 1 bidding package.
23/10/2024 09:31
Bid solicitor Quality Assurance and Testing Center 3 has posted Tender Notice HH - Standard chemicals of the investor Quality Assurance and Testing Center 3 with the form Open bidding.
21/10/2024 14:35
The Bid solicitor Quality Assurance and Testing Center 3 has posted the results of the bidding package HH - Testing chemicals of the investor Quality Assurance and Testing Center 3.
- Winning bidder: NAM THANH MEDICAL EQUIPMENT AND SCIENCE TECHNOLOGY COMPANY LIMITED
21/10/2024 09:30
The Bid solicitor Quality Assurance and Testing Center 3 has posted the results of the bidding package HH - Test standard of the investor Quality Assurance and Testing Center 3.
- Winning bidder: T&T SCIENTIFIC TECHNICAL MATERIALS COMPANY LIMITED
21/10/2024 09:25
The Bid solicitor Quality Assurance and Testing Center 3 has posted the results of the bidding package HH - Test circuit is not normal of the investor Quality Assurance and Testing Center 3.
- Winning bidder: Công ty TNHH Thiết bị và Công nghệ Zenta
21/10/2024 09:16
The Bid solicitor Quality Assurance and Testing Center 3 has posted the request Test circuit is abnormal of the investor Quality Assurance and Testing Center 3 with 1 bidding package.
21/10/2024 09:05
The Bid solicitor Quality Assurance and Testing Center 3 has posted the request Standard substance for organic indicators in environmental sample testing of the investor Quality Assurance and Testing Center 3 with 1 bidding package.
21/10/2024 09:01
The Bid solicitor Quality Assurance and Testing Center 3 has posted the request Chemicals for testing aerobic biodegradable packaging of the investor Quality Assurance and Testing Center 3 with 1 bidding package.
21/10/2024 08:56
The Bid solicitor Quality Assurance and Testing Center 3 has posted the results of the bidding package HH - Sand and soil sifting floors of all kinds of the investor Quality Assurance and Testing Center 3.
- Winning bidder: THIEN Y SCIENTIFIC EQUIPMENT CO.,LTD
18/10/2024 17:01
The Bid solicitor Quality Assurance and Testing Center 3 has posted the request The floor sifts sand and soil of all kinds of the investor Quality Assurance and Testing Center 3 with 1 bidding package.
18/10/2024 16:45
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Quality Assurance and Testing Center 3 has posted 686 of the contractor selection plan, which contains 779 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Quality Assurance and Testing Center 3 has posted 391 Tender Notice in the 382 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Quality Assurance and Testing Center 3 has posted 585 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 585 package, canceled the bid 0 package (among the bidding packages above).
- There are 415 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Quality Assurance and Testing Center 3 has a relationship with 349 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quality Assurance and Testing Center 3 has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quality Assurance and Testing Center 3 is the investor of 321 package, of which 310 package is self-invited, other units invite bid 11 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quality Assurance and Testing Center 3 is the owner of 663 contractor selection plan. In which, they self-invite 659 of contractor selection plan, other units invite bids of 4 of contractor selection plan.
Summary: Investor Quality Assurance and Testing Center 3 is an investor with 349 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quality Assurance and Testing Center 3 is the investor of 47 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code