Data analysis results of DauThau.info software for bid solicitors Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 as follows:
- Has relationships with 4 project owners.
- Has relationships with 189 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 133 contractor selection plans with a total of 166 bidding packages, of which 130 prequalification documents have not found the investment project.
- Has invited bids for 176 packages (with 179 tender notices), and conducted prequalification for 0 packages.
- There are 4 bidding packages with content that needs clarification.
- Announced the results of 104 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 75 packages that have not fully posted the contractor selection results. Of these 72 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.41 contractors.
- Breakdown by bidding field: Goods 56.98%, Construction 23.46%, Consultancy 13.97%, Non-consultancy 4.47%, Mixed 1.12%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 186,768,975,314 VND, of which the total winning bid value is: 175,381,718,985 VND.
- The savings rate is: 6.10%.
Data analysis results of DauThau.info software for bid solicitors Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 as follows:
- Has relationships with 189 contractor.
- The average number of contractors participating in each bidding package is: 3.41 contractors.
- Proportion of bidding fields: Goods 56.98%, Construction 23.46%, Consulting 13.97%, Non-consulting 4.47%, Mixed 1.12%, Other 0%.
- The total value according to the bidding package with valid IMP is: 186,768,975,314 VND, in which the total winning value is: 175,381,718,985 VND.
- The savings rate is: 6.10%.
This Bid solicitor is also an investor. The analysis results of data for the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 0 contractor selection plans, of which 0 were self-published, and 0 were published by other entities.
- Is the investor of 13 Tender Notices, of which 12 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Consulting Surveying, making PAKTTC and estimating disaster damage recovery – Item dredging sediment in front of water intake of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ MÔI TRƯỜNG HQT
16/11/2022 16:13
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Consulting survey, making technical construction plan - SCL estimate in 2023, items: Repairing CN3 route to operate the factory; Items: Reinforcement of 110kV pylons from the Factory - 110kV . Distribution Station of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
09/09/2022 11:05
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Monitoring the deformation of the dam surface in the cycle of 12 reservoirs Irrigation - Quang Tri Hydroelectricity, Monitoring the cyclic deformation of 1 dam route of Pa Rong Reservoir and marking the tunnel route of the Irrigation - Quang Tri Hydropower project of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG TOÀN VIỆT
09/09/2022 11:03
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Official housing for teachers and staff of Huong Lap Primary and Secondary School of Ethnic Minority and Secondary Education of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN VISTAR
05/09/2022 08:26
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Supply and installation of water flow measurement system through turbine units H1 and H2 of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: Công Ty Cổ Phần Xây Lắp Bưu Điện Miền Trung
12/08/2022 16:46
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Supply, replace transformer 35 0.4KV 630KVA to transformer 22 0.4KV 400KVA of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY CỔ PHẦN CƠ ĐIỆN THỦ ĐỨC
12/08/2022 16:44
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Supply of materials for installation of additional connection points for the minimum flow discharge system at the irrigation valve house of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY TNHH M A N S O N
12/08/2022 16:42
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Repairing Block B – Khe Sanh Executive Building of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
15/07/2022 09:58
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package supply photocopiers and scanners A3 – International Corporation in 2022 of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: Công Ty TNHH TM DVKT Hồng Hà
15/07/2022 09:55
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Package 03: Supply of consumables and auxiliary materials for SCL Quang Tri Hydropower Plant in 2022 of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ VÀ ĐẦU TƯ QUẢNG TRỊ
08/07/2022 17:00
The data sheet has been partially hidden, to see the full information please Login or Register
Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 announced the results of the bid package Consulting Surveying, making PAKTTC and estimating disaster damage recovery – Item dredging sediment in front of water intake .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ MÔI TRƯỜNG HQT
16/11/2022 16:13
Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 announced the results of the bidding package Consulting Surveying, making PAKTTC and estimating disaster damage recovery – Item dredging sediment in front of water intake with 1 participating contractors .
31/10/2022 08:46
Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 publishes Tender Notice Consulting Surveying, making PAKTTC and estimating disaster damage recovery – Item dredging sediment in front of water intake in the form National competitive bidding .
09/09/2022 11:18
Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 announced the results of the bid package Consulting survey, making technical construction plan - SCL estimate in 2023, items: Repairing CN3 route to operate the factory; Items: Reinforcement of 110kV pylons from the Factory - 110kV . Distribution Station .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ MÔI TRƯỜNG HQT
09/09/2022 11:05
Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 announced the results of the bid package Monitoring the deformation of the dam surface in the cycle of 12 reservoirs Irrigation - Quang Tri Hydroelectricity, Monitoring the cyclic deformation of 1 dam route of Pa Rong Reservoir and marking the tunnel route of the Irrigation - Quang Tri Hydropower project .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG TOÀN VIỆT
09/09/2022 11:03
Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 announced the results of the bid package Official housing for teachers and staff of Huong Lap Primary and Secondary School of Ethnic Minority and Secondary Education .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN VISTAR
05/09/2022 08:26
Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 announced the results of the bid package Supply and installation of water flow measurement system through turbine units H1 and H2 .
- Winning bidder: Công Ty Cổ Phần Xây Lắp Bưu Điện Miền Trung
12/08/2022 16:46
Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 announced the results of the bid package Supply, replace transformer 35 0.4KV 630KVA to transformer 22 0.4KV 400KVA .
- Winning bidder: CÔNG TY CỔ PHẦN CƠ ĐIỆN THỦ ĐỨC
12/08/2022 16:44
Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 announced the results of the bid package Supply of materials for installation of additional connection points for the minimum flow discharge system at the irrigation valve house .
- Winning bidder: CÔNG TY TNHH M A N S O N
12/08/2022 16:42
Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 announced the results of the bidding package Monitoring the deformation of the dam surface in the cycle of 12 reservoirs Irrigation - Quang Tri Hydroelectricity, Monitoring the cyclic deformation of 1 dam route of Pa Rong Reservoir and marking the tunnel route of the Irrigation - Quang Tri Hydropower project with 2 participating contractors .
10/08/2022 08:13
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Consulting Surveying, making PAKTTC and estimating disaster damage recovery – Item dredging sediment in front of water intake of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ MÔI TRƯỜNG HQT
16/11/2022 16:13
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Consulting survey, making technical construction plan - SCL estimate in 2023, items: Repairing CN3 route to operate the factory; Items: Reinforcement of 110kV pylons from the Factory - 110kV . Distribution Station of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
09/09/2022 11:05
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Monitoring the deformation of the dam surface in the cycle of 12 reservoirs Irrigation - Quang Tri Hydroelectricity, Monitoring the cyclic deformation of 1 dam route of Pa Rong Reservoir and marking the tunnel route of the Irrigation - Quang Tri Hydropower project of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG TOÀN VIỆT
09/09/2022 11:03
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Official housing for teachers and staff of Huong Lap Primary and Secondary School of Ethnic Minority and Secondary Education of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN VISTAR
05/09/2022 08:26
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Supply and installation of water flow measurement system through turbine units H1 and H2 of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: Công Ty Cổ Phần Xây Lắp Bưu Điện Miền Trung
12/08/2022 16:46
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Supply, replace transformer 35 0.4KV 630KVA to transformer 22 0.4KV 400KVA of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY CỔ PHẦN CƠ ĐIỆN THỦ ĐỨC
12/08/2022 16:44
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Supply of materials for installation of additional connection points for the minimum flow discharge system at the irrigation valve house of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY TNHH M A N S O N
12/08/2022 16:42
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Repairing Block B – Khe Sanh Executive Building of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
15/07/2022 09:58
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package supply photocopiers and scanners A3 – International Corporation in 2022 of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: Công Ty TNHH TM DVKT Hồng Hà
15/07/2022 09:55
The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted the results of the bidding package Package 03: Supply of consumables and auxiliary materials for SCL Quang Tri Hydropower Plant in 2022 of the investor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2.
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ VÀ ĐẦU TƯ QUẢNG TRỊ
08/07/2022 17:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted 133 of the contractor selection plan, which contains 166 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted 179 Tender Notices in 176 bidding packages. Among these, 38 Tender Notices were self-invited, and 141 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has posted 104 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 104 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has a relationship with 189 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Quang Tri Hydro Power Company Branch of Power Generation Corporation 2 has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects