Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors RUBBER INDUSTRIAL COLLEGE as follows:
- Has relationships with 2 project owners.
- Has relationships with 43 contractor.
- Announced 39 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 53 contractor selection plans with a total of 210 bidding packages, of which 23 prequalification documents have not found the investment project.
- Has invited bids for 45 packages (with 46 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 34 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 5 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 178 packages that have not fully posted the contractor selection results. Of these 166 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.89 contractors.
- Breakdown by bidding field: Goods 73.91%, Construction 26.09%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 34,049,220,321 VND, of which the total winning bid value is: 33,094,570,419 VND.
- The savings rate is: 2.80%.
Data analysis results of DauThau.info software for bid solicitors RUBBER INDUSTRIAL COLLEGE as follows:
- Has relationships with 43 contractor.
- The average number of contractors participating in each bidding package is: 1.89 contractors.
- Proportion of bidding fields: Goods 73.91%, Construction 26.09%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 34,049,220,321 VND, in which the total winning value is: 33,094,570,419 VND.
- The savings rate is: 2.80%.
This Bid solicitor is also an investor. The analysis results of data for the investor RUBBER INDUSTRIAL COLLEGE are as follows:
- Is the investor of 39 development investment projects.
- Is the investor of 63 contractor selection plans, of which 46 were self-published, and 17 were published by other entities.
- Is the investor of 49 Tender Notices, of which 44 were self-invited, and 5 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 5 bidding packages, of which 4 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 99.98% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.99% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đồng Nai (5)
- Provinces before the merger where the contractor has participated in bidding : Bình Phước (5)
- Has relationships with 2 Bid Solicitors
- Has competed against 7 contractors in 5 bidding packages, won 4 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 5 contractors in 4 bidding packages, won 4 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 1 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
RUBBER INDUSTRIAL COLLEGE publishes the plan Renovating and repairing the office building of the administrative area of Eastern College with 6 bidding package .
28/10/2025 11:09
Investor RUBBER INDUSTRIAL COLLEGE has posted an investment and development project Renovating and repairing the office building of the administrative area of Eastern College.
28/10/2025 10:10
RUBBER INDUSTRIAL COLLEGE publishes the plan Upgrading Information Technology and Digital Transformation in 2025 Eastern College with 5 bidding package .
15/10/2025 14:47
RUBBER INDUSTRIAL COLLEGE publishes the plan Upgrading Information Technology and Digital Transformation in 2025 Eastern College with 5 bidding package .
15/10/2025 14:42
Investor RUBBER INDUSTRIAL COLLEGE has posted an investment and development project Upgrading Information Technology and Digital Transformation in 2025 Eastern College.
15/10/2025 14:14
RUBBER INDUSTRIAL COLLEGE publishes the plan Upgrade and renovate the lecture h lecture B - Eastern College with 5 bidding package .
26/09/2025 16:22
Investor RUBBER INDUSTRIAL COLLEGE has posted an investment and development project Upgrade and renovate the lecture h lecture B - Eastern College.
26/09/2025 16:16
RUBBER INDUSTRIAL COLLEGE publishes the plan Upgrading and repairing automobile testing yard according to QC40: 2024 Driving training and testing center - Eastern College with 8 bidding package .
17/09/2025 10:16
Investor RUBBER INDUSTRIAL COLLEGE has posted an investment and development project Upgrading and repairing automobile testing yard according to QC40: 2024 Driving training and testing center - Eastern College.
17/09/2025 08:08
Investor RUBBER INDUSTRIAL COLLEGE has posted an investment and development project Upgrading and repairing automobile testing yard according to QC40: 2024 Driving training and testing center - Eastern College.
17/09/2025 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
RUBBER INDUSTRIAL COLLEGE announced the results of the bid package Upgrading Information Technology and Digital Transformation .
- Winning bidder: BSC INFORMATION TECHNOLOGY AND TELECOMMUNICATION CORPORATION
30/08/2024 14:58
RUBBER INDUSTRIAL COLLEGE announced the results of the bidding package Upgrade information technology and digital conversion with 1 participating contractors .
15/08/2024 15:31
RUBBER INDUSTRIAL COLLEGE publishes Tender Notice Upgrading Information Technology and Digital Transformation in the form Open bidding .
06/08/2024 14:21
RUBBER INDUSTRIAL COLLEGE announced the results of the bid package Construction costs for roof repair works F - G .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TƯ VẤN ĐẦU TƯ XÂY DỰNG MẠNH HÙNG, CÔNG TY TNHH ĐIÊU KHẮC XÂY DỰNG HUY HƯNG
01/08/2024 10:31
RUBBER INDUSTRIAL COLLEGE publishes the plan Upgrading Information Technology and Digital Transformation of Rubber Industry College with 4 bidding package .
21/07/2024 16:05
RUBBER INDUSTRIAL COLLEGE announced the results of the bid package Investment in Informatics Department No. 3 in 2024 - Faculty of Economics .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN PHONG NGUYÊN
18/07/2024 08:22
RUBBER INDUSTRIAL COLLEGE announced the results of the bid package Investing in Training Equipment for the Faculty of Electrical and Electronics Engineering in 2024 .
- Winning bidder: TOAN TRI EQUIPMENT COmpany limited
18/07/2024 08:12
RUBBER INDUSTRIAL COLLEGE announced the results of the bidding package Construction costs for roof repair works F - G with 2 participating contractors .
15/07/2024 11:01
RUBBER INDUSTRIAL COLLEGE announced the results of the bidding package Investing in Training Equipment for the Faculty of Electrical and Electronics Engineering in 2024 with 2 participating contractors .
11/07/2024 10:20
RUBBER INDUSTRIAL COLLEGE publishes Tender Notice Construction costs for roof repair works F - G in the form Open bidding .
06/07/2024 10:14
The data sheet has been partially hidden, to see the full information please Login or Register
RUBBER INDUSTRIAL COLLEGE publishes the plan Renovating and repairing the office building of the administrative area of Eastern College with 6 bidding package .
28/10/2025 11:09
Investor RUBBER INDUSTRIAL COLLEGE has posted an investment and development project Renovating and repairing the office building of the administrative area of Eastern College.
28/10/2025 10:10
RUBBER INDUSTRIAL COLLEGE publishes the plan Upgrading Information Technology and Digital Transformation in 2025 Eastern College with 5 bidding package .
15/10/2025 14:47
RUBBER INDUSTRIAL COLLEGE publishes the plan Upgrading Information Technology and Digital Transformation in 2025 Eastern College with 5 bidding package .
15/10/2025 14:42
Investor RUBBER INDUSTRIAL COLLEGE has posted an investment and development project Upgrading Information Technology and Digital Transformation in 2025 Eastern College.
15/10/2025 14:14
RUBBER INDUSTRIAL COLLEGE publishes the plan Upgrade and renovate the lecture h lecture B - Eastern College with 5 bidding package .
26/09/2025 16:22
Investor RUBBER INDUSTRIAL COLLEGE has posted an investment and development project Upgrade and renovate the lecture h lecture B - Eastern College.
26/09/2025 16:16
RUBBER INDUSTRIAL COLLEGE publishes the plan Upgrading and repairing automobile testing yard according to QC40: 2024 Driving training and testing center - Eastern College with 8 bidding package .
17/09/2025 10:16
Investor RUBBER INDUSTRIAL COLLEGE has posted an investment and development project Upgrading and repairing automobile testing yard according to QC40: 2024 Driving training and testing center - Eastern College.
17/09/2025 08:08
Investor RUBBER INDUSTRIAL COLLEGE has posted an investment and development project Upgrading and repairing automobile testing yard according to QC40: 2024 Driving training and testing center - Eastern College.
17/09/2025 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s RUBBER INDUSTRIAL COLLEGE has posted 53 of the contractor selection plan, which contains 210 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor RUBBER INDUSTRIAL COLLEGE has posted 46 Tender Notices in 45 bidding packages. Among these, 42 Tender Notices were self-invited, and 4 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor RUBBER INDUSTRIAL COLLEGE has posted 34 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 34 package, canceled the bid 0 package (among the bidding packages above).
- There are 5 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor RUBBER INDUSTRIAL COLLEGE has a relationship with 43 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor RUBBER INDUSTRIAL COLLEGE has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity RUBBER INDUSTRIAL COLLEGE has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects